Summary
Overview
Work History
Education
Skills
Websites
Work Availability
Timeline
Generic
IMTIAZ ALAM SIDDIQUE

IMTIAZ ALAM SIDDIQUE

JUBAIL

Summary

Engineering professional experience in Development, Operation & Maintenance Cross Functional Team Leadership Schedule & Budge Management •Client Relationships Contract Negotiation. Expertise Staff(Training/Management•Issue Resolution •Project Reporting Quality Assurance•Field Inspections •Policy/Procedure Development Business Liaison

Overview

31
31
years of professional experience

Work History

Sr. Site Engineer

Aran Saudi Arabia General Cont.Est.
02.2018 - Current
  • Facilitated and led site engineering projects relating to new or upgraded equipment, facilities and quality initiatives.
  • Identified and resolved potential structural issues.
  • Displayed strong communication and interpersonal skills while visiting clients, jobsites and consultant offices to support project and business development needs.
  • Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
  • Suggested process and technical design changes to improve performance and efficiency.
  • Managed the installation and testing of the Under Ground Street light Power Cables.
  • Managed the installation and testing of street light power panels and control panels.
  • Managed the installation and testing Under Ground Electrical Cable line from SwitchYard to Local Unit Substations, Various locations in the RC New City center Jubail area. Compliance with all safety protocol.
  • Managed the High Mast / flood light Installation and testing
  • Checked technical designs and drawings for adherence to standards.
  • Adhered to timelines to meet quality assurance targets.





Electrical Engineer Consultant.

Al-Othman Consultant www.othmanconsult.com Saudi Arab
03.2015 - 11.2017

PROJECT: 230kVA overhead Transmission line and OPGW Connectivity between various Grids to sub-station. (Dammam and Jubail city, KINGDOM OF SAUDI ARABIA).

  • Interaction with the clients regarding standards and specifications for the project and communication to all the stakeholders. Documentation of the Project Management Plan, and Quality Assurance & Quality Control plan, Preparation of Daily, Weekly, and Monthly Progress Reports of all activities including project milestone completion reports. Manage day-to-day issues through regular interaction with the PE and other relevant stakeholders.
  • Inspection and assurance of the Electrical Equipments installation job execution in compliance with SEC (Saudi Electric Company) and ITU standards.
  • Validation of the third-party test result/inspection report of All Electrical Items and Equipment.
  • Pre-installation Testing/survey of All Electrical Equipment.
  • Supervision of OH wire termination works.
  • Supervision of All Electrical (DC Power) Equipment installation at various Sub-Stations.
  • Supervision and testing of all the installed Telecommunication equipment like SDH, UNODE, DVMs, DC Power rectifier, UPS and DC to DC converter, etc.
  • Preparation of all the reports and historical data of Electrical/Telecommunication works.
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.
  • Resolved problems, improved operations and provided exceptional service.
  • Developed strong communication and organizational skills through working on group projects.
  • Exercised leadership capabilities by successfully motivating and inspiring others.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Managed time efficiently in order to complete all tasks within deadlines and focusing the Quality assurance.

Electrical Technician

Saudi Binladin Group (Operation & Maintenance), Saudi Arab.
12.2011 - 12.2014
  • Operation and maintenance Sail Al Kabeer MIQAT Project Power Plant and Power Infrastructure, Including 2 x 300 kVA Gensets and UPS.
  • All MIQAT Electrical Power panels, pumproom Motors, floodlights, Electric Water heater plant etc.
  • Preparation and action of the preventive and corrective maintenance program.
  • Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Attended training committees that wrote training modules for equipment operation and testing.
  • Installed, adjusted and calibrated electrical equipment and instrumentation to maintain proper performance.
  • Tested wiring and other system parts for electrical flow and function.

Electrical Engineer

Korg International multi Technology.(KIMT)
01.2010 - 08.2011
  • My responsibility is to handle the Power Plants and Telecom Projects.
  • Providing the support PTCL Data Center Power Infrastructure, security cameras, and Biometric systems.
  • Planning and supervision of the OFAN and OSP Telecom Projects.
  • Installation Testing and commissioning the Generators, UPS, and Rectifiers Equipment.
  • PABX, Digital Cross-Connect Network, PRIs and BRIs, lease line, Dark fiber network.

Electrical Engineer (Maintenance)

CYBER INTERNET SERVICES(Pvt)Ltd.
08.2008 - 11.2009
  • My responsibility was to maintain the DATA Center Power Infrastructure, Including 2 x 380 kVA Gensets, 2 X 200kVA UPS, 300amp Rectifiers, and Battery banks.
  • An additional job was to maintain the company Telecom Fiber Optic equipment and OSP cable Network.
  • Preparation and action of the preventive and corrective maintenance program.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.
  • Worked well in a team setting, providing support and guidance.
  • Identified issues, analyzed information and provided solutions to problems.
  • Skilled at working independently and collaboratively in a team environment.

Engineering Supervisor

Pakistan Telecommunication Company Limited
04.1992 - 07.2008
  • Installation of Solar Power, batteries, and backup Power in Telecommunication Transmission hut was needed in SINDH and BALOCHISTAN regions.
  • Responsible to maintain the 10th floor Telephone Building Power infrastructure, L.T Panels, Low voltage transformer, Power factor units, UPS, Rectifiers for D.C power, Batteries Bank,2X 500 kVA Genset, D.B Panels. Develop and monitor preventative maintenance plans of Electrical infrastructure and ensure that they are executed following the defined procedures
  • Responsible to maintain the electric power network configuration and diagrams, design of the power systems, inventory tracking, and maintenance.
  • Responsible for Testing, commissioning and installation of WLL BTS Power Plant / DC Power Cable and Equipment’s, after commissioning we maintain the WLL BTS UPS, Generator, Rectifier/Battery, Tower lightning System, Room Air conditioning and lightning and look after the ATS/MTS system, Isolation Transformer and PDP.
  • Correspondence for new projects and maintain the BOQs.
  • Coordination with different inter departments to execute development works.
  • Installation commissioning and testing of Rectifiers for D.C power.
  • Conducting of PAT.

Rollout Projects:

WLL MSU/BTS AC/DC Power Project.

Mobile number portability Power connectivity Project.

Synchronization Power connectivity Project.

U-Fone Power connectivity Project.

Cyber net media Power connectivity Project.

Digital Cross-Connect (DXX) Expansion network 1445 Power connectivity Project.

Muslim Commercial Bank (Tower)Karachi, Power/Media Project.

Habib Bank (Call Center) Power/Media Project.

Soneri Bank (Head office) Power/Media Project.

Education

Bachelor of Technology (Honors) - Electrical Engineering

Dadabhoy Institute of Higher Education
Pakistan (Karachi)
07.2007

Diploma of Associate Engineering - Electrical

JINNAH POLYTECHNIC INSTITUTE
Pakistan (Karachi)
05.1989

Skills

  • Safety Awareness
  • Project Deadlines
  • Engineering Plans and Specifications
  • Project Drawings
  • Engineering Standards
  • Health and Safety
  • Technical Expertise
  • Construction Quality Standards
  • Site Inspection

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Sr. Site Engineer

Aran Saudi Arabia General Cont.Est.
02.2018 - Current

Electrical Engineer Consultant.

Al-Othman Consultant www.othmanconsult.com Saudi Arab
03.2015 - 11.2017

Electrical Technician

Saudi Binladin Group (Operation & Maintenance), Saudi Arab.
12.2011 - 12.2014

Electrical Engineer

Korg International multi Technology.(KIMT)
01.2010 - 08.2011

Electrical Engineer (Maintenance)

CYBER INTERNET SERVICES(Pvt)Ltd.
08.2008 - 11.2009

Engineering Supervisor

Pakistan Telecommunication Company Limited
04.1992 - 07.2008

Bachelor of Technology (Honors) - Electrical Engineering

Dadabhoy Institute of Higher Education

Diploma of Associate Engineering - Electrical

JINNAH POLYTECHNIC INSTITUTE
IMTIAZ ALAM SIDDIQUE