Summary
Overview
Work History
Education
Skills
Certification
Software
Languages
Timeline
Generic

Jayakrishnan Pillai

Flame And Gas Detection Technician
Dammam,KSA

Summary

Seasoned technical professional with over two decades of experience in various countries, including India, UAE, Bahrain, Qatar and Saudi Arabia. Demonstrated ability to deliver fabrication and welding projects with high efficiency and reliability, while meeting budget and deadline constraints. Also participated in projects involving gas and flame detection, fire alarm, fire suppression and security systems. I am eager to apply my skills and knowledge to a new and challenging role.

Overview

19
19
years of professional experience
2
2
Certifications

Work History

Project Supervisor

Apex Industrial Solutions
Dammam , Eastern Province
2022.03 - Current

Cultivated a positive work environment that fostered teamwork, creativity, and productivity among all team members.

Client: National Petrochemical Industrial Co. (NATPET) Yanbu.

Rolls and Responsibility:

  • Designing, installing, and testing electrical and instrumentation (Flame and Gas Detection OEM-Det Tronics) systems for various projects.
  • Delivered completed projects on time by prioritizing multiple tasks
  • Prepared all supplies and equipment needed for daily transport to job site
  • Maintained high safety standards by following policies, procedures and protocols outlined by company, OSHA and EPA
  • Exceeded client expectations in delivering comprehensive solutions that addressed their unique challenges and needs
  • Coordinated with vendors to negotiate contracts, secure materials at competitive prices, and maintain strict adherence to schedules for seamless execution of projects
  • Defined manpower, equipment and resource needs for field projects, keeping open lines of communication with specialists and contractors to meet project milestones on time and on budget
  • Improved team collaboration with regular meetings, clear communication, and shared goals.
  • Supervised work of fourteen team members, offering constructive feedback regarding work performance.
  • Kept senior management well-informed by preparing and presenting project status reports
  • Organized scope, schedule and assignments for entire team
  • Developed and monitored project schedules, budgets and objectives for successful completion
  • Identified and resolved project issues and mitigated risks, reducing challenges and improving project results
  • Developed and deepened relationships with key stakeholders
  • Reported regularly to managers on project budget, progress, and technical problems
  • Monitored project progress, identified risks and took corrective action as needed
  • Maintained open communication by presenting regular updates on project status to customers
  • Verified quality of deliverables and conformance to specifications before submitting to clients

Gas Detection in Oil and Gas, Petrochemical Plant

Aujan Industrial Supplies
Dammam , Eastern Province
2019.11 - Current

Position: Site Supervisor

Client: Rawabi Integrated Gas Jubail.

  • Designing, installing, and testing electrical and instrumentation (Flame and Gas Detection) systems for various projects. (OEM RC system.)
  • Document and maintain system code and configuration
  • Prepare, schedule, coordinate and monitor assigned engineering projects.
  • Perform overall quality control of work budget, schedule, plans, personnel’s performance, and report regularly on project status.
  • Preparing and reviewing technical documents, such as drawings, specifications, and reports to get approval from client.
  • Troubleshooting and resolving any issues or problems that may arise during project execution.
  • Ensuring compliance with safety, environmental and regulatory standards.
  • Coordinate with clients and contractors to ensure project meets specifications, budget, and schedule.
  • Provide technical support and training to client.

Position: Senior Fire Technician (AIS) Saudi Arabia
Client: Saudi ARAMCO Khurais Central Process. Facility.

  • Installation of JP3 Liquid Optical Flow Cell according to the design drawing and client instruction.
  • Prepare the installation site and equipment according to the specifications and instructions.
  • Liaising with the local authorities and regulatory bodies to obtain the necessary permits and approvals for project.

Position: Site Supervisor (AIS) Saudi Arabia
Client: Saudi Kayan Petrochemical (SABIC) Jubail.

  • Conducting routine testing of Fire and Gas equipment.
    Perform preventive and corrective maintenance for fire and gas equipment as per SAP notification.
  • Prepare documentation and report.
  • Calibrate various gas detection systems. (OEM- Honeywell, Det-Tronics, Dragger Etc.)
  • Initiation as lead onsite job and execution.
  • Trouble shooting and rectification fire and gas related equipment.

Position: Site Supervisor (AIS) Saudi Arabia
Client: Ibn Zahr (SABIC) Jubail

  • Designing, installing, and testing of fire piping and instrumentation (Fire suppression) systems for substation project.
  • Supervising and inspecting the installation, commissioning, and testing of the fire piping and instrumentation system on site.
  • Ensuring the safety, quality, and compliance of the fire piping and instrumentation system with the relevant codes, regulations, and best practices.
  • Preparing and submitting progress reports, test reports, and as-built drawings for the fire piping and instrumentation system.

Fire Water, Fire Suppression System Technician

Dicotech Qatar WLL.
2016.01 - 2019.09
  • Delegate appropriate tasks to fitters, mechanics and assistants as needed to fulfill project completion deadlines, meet scheduling requirements and exceed the goals established by the fire protection system manager.
  • Maintained customer satisfaction by clarifying questions about orders and specialty items.
  • Conduct routine preventative maintenance on sprinkler fire suppression systems.
  • Maintain good customer relationships
  • Testing of fire pumps
  • Service and inspections of wet, dry and pre-action fire suppression systems
  • Organized work to meet demanding production goals.
  • Completed job reports and logs immediately following service calls.
  • Performed complex mechanical alignments and equipment calibration to meet quality standards.
  • Tracked and recorded parts and labor costs related to each service call.
  • Mentored junior technicians in maintenance, repair and reporting duties.
  • Maintained compliance with regulatory standards and safety requirements.
  • Observed equipment operation to diagnose and troubleshoot reported issues.
  • Performed troubleshooting and diagnosis on malfunctioning equipment.
  • Tested components and systems to evaluate performance and identify concerns.
  • Addressed routine equipment maintenance according to established schedule.
  • Inspected equipment to identify areas of wear or causes of malfunctions.

WALIA SUPER

HEAT EXCHANGER FABRICATOR, COIL WLL, RESPONCIBILITY
2011.01 - 2012.01
  • Fabrication, Installation, and welding of Heat exchanger for Bahrain waste treatment plant.
  • Operated welding machines and grinders to cut, shape and join metal workpieces.
  • Adjusted machine settings and tooling to get accurate cuts and shapes for each job.
  • Assembled and welded components to create metal structures.
  • Read blueprints and technical drawings to determine specifications of materials and tools needed for specific jobs.
  • Managed project timeline and resources to complete work on time and within budget.
  • Fabricated components and structures following customer requirements.
  • Cut bent, and formed sheet metal and other materials to create metal works.
  • Collaborated with team members to complete projects accurately and quickly.
  • Maintained clean and organized working environment to promote safety and efficiency.
  • Completed tasks on time to meet quality and safety standards.

PIPE FABRICATOR

EUROTECH SYSTEMS TVM KERALA
2007.01 - 2010.01
  • Installation, commissioning and maintenance of fire pumps and firefighting equipment as per civil defense requirement.
  • Aligned and verified positioning using measuring instruments to determine reference points and compute layout dimensions.
  • Assembled and welded components to create metal structures.
  • Operated welding machines and grinders to cut, shape and join metal workpieces.
  • Managed project timeline and resources to complete work on time and within budget.
  • Used clamps and brackets to attach pipes to walls, structures and fixtures.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.

HVAC PIPING AND DUCTING TECHNICIAN

BINDHABI GEN. CONT
2006.01 - 2007.01
  • Pipe And Air Flow Duct installation following CAD Drawing.

Education

No Degree -

VKN Industrial Training Center
2001.04 -

Skills

    MS OFFICE

EXCEL SPREADSHEET

CAD

COMMUNICATION

ACTIVE LISTENING

LEADERSHIP

PROBLEM SOLVING

DECISION MAKING

MULTI TASKING

Certification

Certified Bauer Breathing Air Compressor Service and Maintenance.

Software

MS Office

CAD

Languages

ENGLISH
Very Good
A1
HINDI
Very Good
A1

Timeline

Certified Bauer Breathing Air Compressor Service and Maintenance.

2023-09

Project Supervisor

Apex Industrial Solutions
2022.03 - Current

Certified MSA Fixed Gas, Multi Portable Gas, Single Portable Gas Detectors and SCBA service and maintenance.

2021-08

Gas Detection in Oil and Gas, Petrochemical Plant

Aujan Industrial Supplies
2019.11 - Current

Fire Water, Fire Suppression System Technician

Dicotech Qatar WLL.
2016.01 - 2019.09

WALIA SUPER

HEAT EXCHANGER FABRICATOR, COIL WLL, RESPONCIBILITY
2011.01 - 2012.01

PIPE FABRICATOR

EUROTECH SYSTEMS TVM KERALA
2007.01 - 2010.01

HVAC PIPING AND DUCTING TECHNICIAN

BINDHABI GEN. CONT
2006.01 - 2007.01

No Degree -

VKN Industrial Training Center
2001.04 -
Jayakrishnan PillaiFlame And Gas Detection Technician