Summary
Overview
Work History
Education
Skills
Websites
Area of Expertise
Certification
Personal Information
Languages known
Software
Timeline
Generic
Jitesh Kumar

Jitesh Kumar

Siwan,India

Summary

Versatile Site Engineer with 10 years of expertise in static equipment maintenance, piping fabrication, and erection during turnaround and shutdown project activities, ensuring strict adherence to compliance and safety regulations.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Site engineer

Abdullah A. Al Barrak & Sons Co.
Jubail, Saudi Arabia
01.2022 - Current

Directed shutdown operations for SABIC and Saudi Aramco, leading technical discussions.

Coordinated pre-shutdown, shutdown, and post-shutdown tasks to meet project objectives.

  • Experienced in managing team of approximately 200 persons, comprising materials, layout, and stress.
  • Tracked critical paths to facilitate seamless execution.
  • Managed over 20 shutdowns in oil, gas, and refinery sectors.
  • Implemented stringent health and safety protocols to ensure site safety.


Mechanical supervisor

Abdullah A. Al-barrak & sons co.
Al Hufuf, Eastern Province
02.2019 - 01.2022

Executed general maintenance on static equipment during over 20 shutdowns at Saudi Aramco and SBIC Petrochemical projects.

  • Conducted hydraulic and pneumatic testing of valves, vessels, and heat exchangers.
  • Serviced boilers, cooling towers, and storage tanks to ensure optimal operational performance.

Interpreted P&ID and technical drawings to enhance maintenance planning efficiency.

Site engineer

Rollcon technofab india pvt ltd
New delhi, india
10.2016 - 12.2018
  • Completed four coal handling system projects within strict timelines and quality standards.
  • Executed installation and commissioning of materials handling systems to ensure optimal performance in India.

Junior piping engineer

Lanco Infratech limited, Korba Chhattisgarh.
Korba, india
06.2014 - 08.2016
  • Executed piping fabrication and erection for Amarkantak power project, 660 MW x 2 auxiliary stem line.
  • Managed pipeline fabrication and erection processes to ensure timely completion.

Conducted non-destructive testing (NDT) to guarantee quality standards were met.

Oversaw invoicing and billing to maintain accurate financial records.

Education

Diploma - Mechanical Engineering

Sai Polytechnic College

Skills

    Microsoft Office proficiency
    Familiarity with MS Project
    Familiarity with Primavera P6
    Power BI expertise
    AI prompt skills
    Leadership abilities
    Problem solving
    Team collaboration

Area of Expertise

● Experienced in managing a team of approximately 200 persons, comprising materials, layout, and stress.

● Expert in planning, preparation & execution of Project activities, monitoring the day-to-day activities, and preparation of reports according to the procedures and standards

● Supervision, monitoring and coordination of all shutdown activities, which include maintenance, inspection and testing of the gas plant.

● Have handled more than 20 major shutdowns in Oil, Gas & Refinery.

● Executor Mechanical maintenance & site supervision static and Rotary equipment for shutdown, turnaround activities, Preventive Maintenance, corrective maintenance, refinery, petrochemical, chemical, etc.

● Study, review, and fully understand all job packages and work scopes within the area to ensure all requirements have been identified as met prior to turnaround activities

● Conduct a progress meeting with the team and the unit meeting to update the progress report.

● To create the contingency plan for the critical equipment

● To ensure all the tasks in my area are scheduled properly

● Details the plant for each job, including the crane requirements and lifting activities

● Working closely with the materials coordinator to ensure all ordered materials are according to specifications and delivered on schedule

● Maintenance of all static equipment, all types of Heat exchangers, distillation Column, Pressure vessels, Heaters, Piping, etc.& fabrication of piping equipment.

● Exchanger tube bundle re-tubing

● Hydro jetting cleaning all static equipment, with multiple lances

● Leak arresting teat by Hydro, Pneumatics, oil, Nitrogen, all static equipment, Piping loops

● Piping erection and fabrication.


Certification

ASNT NDT LEVEL II (RT, UT, DPT, MT)

Project management assessment certificate

AI tools and ChatGPT workshop certificate

Personal Information

Languages known

English
Advanced
Arabic
Elementary
Hindi
Fluent

Software

Ms office

Ms project

Timeline

Site engineer

Abdullah A. Al Barrak & Sons Co.
01.2022 - Current

Mechanical supervisor

Abdullah A. Al-barrak & sons co.
02.2019 - 01.2022

Site engineer

Rollcon technofab india pvt ltd
10.2016 - 12.2018

Junior piping engineer

Lanco Infratech limited, Korba Chhattisgarh.
06.2014 - 08.2016

Diploma - Mechanical Engineering

Sai Polytechnic College
Jitesh Kumar