Results-driven Electronics and Communication Engineer (ECE) and Registered Master Electrician (RME) with 15 years in EPC operations and maintenance. Specialises in installations, commissioning, and project management, consistently delivering projects on time and enhancing team coordination. Strong communication and interpersonal skills foster effective collaboration across diverse teams.
Overview
1
1
Certification
21
21
years of professional experience
Work History
Engineer- Exta low voltage & Security Systems
Digital Solutions Provider Co. Ltd
Riyadh, Saudi Arabia
03.2023 - Current
Contribute to the design of integrated security solutions, ensuring they meet project specifications and are compatible with overall architecture and scope of works.
Installed and configured CCTV and integrated security systems, including NETAVIS cameras and both passive (structured cabling) and active components (switches, routers).
Performed regular maintenance and system monitoring of ACS, IPT, PA, BMS, FAS, and network systems to ensure optimal performance.
Conducted site surveys to assess existing systems, recommended improvements, and coordinated ELV systems design per specifications.
Monitor network traffic, apply software updates, and fix hardware or software failures.
Resolve connection dropouts and help team members or clients with network access, port assigment and configurations
Providing remote support for technicial teams on site
Engineer- Information & Communications Technology
Global Solutions LLC
Muscat, Sultanate of Oman
01.2015 - 01.2021
Conducted site surveys and installations to identify customer ICT/ISP/OSP design requirements, producing documentation and cost estimates for new or existing systems and building infrastructure conditions.
Delivered industry-standard solutions for telecommunications, fibre cabling, and infrastructure systems, collaborating with customer contacts on projects and work orders to ensure optimal outcomes while maintaining cost efficiency.
Oversaw project planning for ICT implementation, ensuring all tasks were aligned with project goals. for ICT implementation process.
Collaborated with teams to coordinate and develop telecommunications system layouts and drawings, ensuring accuracy and compliance. telecommunications system layout and drawings with other disciplines.
Review, evaluate and coordinate to update drawings and product submittals.
Preparing Bill of Quantities, costing and technical specifications for proposal, and implementation methods.
Performs Commissioning and testing, termination, FOPP & enclosure splicing, troubleshoots in Data Centre rack rooms and cabinets.
Report any project scope changes, issues, development or concerns to the Managers.
Attend project planning and progress meetings with or without the customer contacts assigned.
Technician Lead- Structured Cabling Systems
BT Advance Operation and Maintenance
Jeddah
04.2011 - 04.2013
Manage planning and implement project plans for horizontal, vertical and backbone cabling installation process for UTP Enhanced Category 5, 6, Category 6A, copper wires, coaxial cables, fibre optic cables in ISP/OSP environments for LAN Network, Telecommunications, Access Security controls, CCTV Security and IP Telephony systems from IDF Rack Rooms and data centre.
Conducted pre and post testing to ensure fibre optic cables met standards and certified them using Optical Time Domain Reflectometer (OTDR) and power meters.
Tested copper cables to meet certification parameters using appropriate test equipment.
Assembled, terminated, and installed copper and fibre optic cables in racks, closets, patch panels, information outlets and containtment systems.
Administered site inspections to monitor project progress and compliance.
Industrial Electrician- QA/QC Telecoms
KENTZ, SNC Lavalin
Jubail
12.2007 - 08.2010
Implemented documented quality assurance and quality control measures for all contractors on site, ensuring compliance with client and regulatory requirements through auditable processes.
Verified quality activities align with codes and applicable standards.
Completed and verified field inspections and tests per project schedule.
Coordinated all field inspections and inspection activities to maintain quality standards.
Monitored progress of Requests for Information (RFI) throughout project phases and updated punch list items for close-out to ensure timely project completion.
Conducted on-site inspections for terminating and splicing fibre optic and telephone cables in various locations, ensuring adherence to quality standards for backbone cabling installations.
On site inspection of pre-post commissioning of Copper /fibre Optic, pre and post testing by Optical Time Domain Reflectometer and Power Meter end-to-end testing.
Associate Engineer Installer
MERALCO Industrial Engineering Services Corp.
Ortigas, Philippines
03.2005 - 09.2006
Examined electrical systems and equipment to ensure safety and functionality.
Inspected sound and security systems, wiring, lighting, motors, and generating equipment for compliance with standards.
Conducted inspections for imbalance and voltage abnormalities in electrical systems, identifying potential issues for remediation.
Maintained accurate records and prepared detailed reports on electrical inspections.
Communicated inspection findings to contractors for further action and remediation.
Inspection Line to Ground Project and converting of distribution lines to Consumer Lines.
Converting socket line side connection to Line to Ground standardisation System.
Maintaining electrical devices and equipment.
Education
Bachelor of Science - Electronics & Communication Engineering
University of San Jose Recoletos
Cebu City, Philippines
05-2014
Diploma in Electrical Engineering Technology -
University of Saint Louis
Tuguegarao City, Philippines
03-2003
Skills
AutoCAD
Fiber optics
Structured cabling
Splicing and termination
System commissioning
Network testing
Cisco CCNA certification
Tech installation
Wiring installation
Troubleshooting skills
Project oversight
Site coordination
Team leadership
Certification
DATA CENTRE Training seminar, Muscat, Oman, 2015-05-23