Summary
Overview
Work History
Education
Skills
Timeline
Personal Information
Certifications And Approvals
Generic

Junaid Zahid

Neom Ttroejna

Summary

Result-oriented Civil Site Engineer with over 12 years of experience in Road Network Infrastructure, Structure Buildings, Storm Water Channels, Landscaping & Irrigation Networks, and Pre-Engineering Buildings (PEB). Currently contributing to the NEOM Trojena mega-project.

Overview

12
12
years of professional experience

Work History

Site Engineer Civil / Site Supervisor

Tamimi Pre-Engineering Building
05.2016 - Current
  • PEB Specialist: PEB structures ki erection, structural assembly aur alignment ki supervision.
  • Landscaping & Irrigation: Modern irrigation networks aur landscaping (Softscape/Hardscape) ki execution.
  • Infrastructure: Road networks, grading aur asphalt works ki NEOM standards par supervision.
  • Utilities: Storm water channels aur underground utility services ki installation.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
  • Troubleshot on-site issues promptly using analytical problem-solving skills resulting in minimal delays to the overall schedule.
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
  • Delivered projects on time and within budget constraints by effectively managing resources, schedules, and risks.
  • Enhanced site safety by conducting regular inspections and enforcing strict adherence to safety protocols.
  • Oversaw quality control and health and safety matters for construction teams.
  • Ensured high-quality standards were maintained throughout the project lifecycle by adhering to industry best practices and codes of conduct.
  • Oversaw quality control processes by conducting regular inspections, addressing non-compliance issues promptly, and implementing corrective actions to uphold project standards consistently.
  • Oversaw successful completion of multiple projects, maintaining strict adherence to deadlines and budgets.
  • Supported property condition assessment reports, 3D scanning and retro-commissioning throughout buildings.
  • Streamlined communication between project stakeholders, facilitating more efficient decision-making processes.
  • Implemented innovative construction techniques, improving overall quality of work and reducing time to completion.
  • Maintained rigorous compliance with all health and safety regulations, significantly reducing incidents on-site.
  • Conducted comprehensive quality assurance checks, ensuring all work met or exceeded project standards.
  • Solved complex engineering problems by applying advanced technical knowledge, ensuring projects remained on track.
  • Improved client satisfaction by providing regular updates and swiftly addressing any concerns or issues.
  • Fostered culture of continuous improvement, encouraging innovation and efficiency in all aspects of project execution.
  • Achieved significant cost savings by negotiating better rates with suppliers without compromising on quality.
  • Enhanced team performance through targeted training programs, elevating skills and productivity.
  • Optimized resource allocation to meet project milestones, carefully managing labor and materials for maximum efficiency.
  • Reduced environmental impact of construction activities by adopting sustainable practices and materials.

Sub Engineer Civil

National Logistics Cell (NLC)
01.2014 - 02.2016
  • Road construction (NHA standards) aur drainage systems ki supervision.
  • Earthwork excavation aur machinery coordination.
  • Project: Metro Bus Project (Package 2)
  • Conducted thorough site assessments to identify potential issues and develop appropriate solutions before commencing work.
  • Evaluated vendor offerings, selecting optimal materials based on cost-effectiveness analysis without compromising quality or performance.
  • Contributed to successful project completions by identifying potential risks early on and formulating mitigation strategies accordingly.
  • Reduced maintenance downtime through proactive equipment inspections and preventive maintenance.
  • Maintained up-to-date knowledge of industry advancements in order to incorporate new techniques into current practices when applicable.
  • Collaborated with cross-functional teams to ensure seamless integration of sub-engineering components into larger projects.
  • Coordinated with clients throughout the project lifecycle, addressing concerns promptly while maintaining open lines of communication.
  • Improved safety standards by implementing updated protocols and conducting regular training sessions.
  • Provided support during emergency situations requiring rapid response times, demonstrating adaptability under pressure.
  • Assisted in the development of proposals for prospective clients, showcasing the company''s capabilities in delivering high-quality sub-engineering services.
  • Developed and executed detailed project plans to achieve desired outcomes with minimal disruption to ongoing operations.
  • Championed the adoption of sustainable engineering practices, promoting environmental responsibility within the organization.
  • Managed subcontractor relationships, ensuring high-quality workmanship while adhering to established deadlines and budgets.
  • Prepared comprehensive reports detailing project progress, challenges encountered, and recommendations for future improvements.
  • Reviewed and approved design drawings, ensuring compliance with regulatory requirements and established engineering standards.
  • Troubleshot complex technical problems, applying innovative approaches to resolve issues quickly and effectively.
  • Optimized resource allocation for various projects, ensuring timely completion within budget constraints.
  • Enhanced team productivity by providing technical guidance and mentoring junior staff members.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Developed cost estimates and project specifications for proposals.
  • Provided input to team lead regarding areas for process and procedural improvement.

Education

Secondary Education -

KAILASH High School
Patola, Poonch

Bachelor of Engineering -

PRESTION UNIVERSTY ISLAMABAD
ISLAMABAD PAKISTAN
06-2015

DAE - Civil Technology

Rawalpindi Polytechnic Institute
Pakistan
10-2011

Skills

  • AutoCAD (2D)
  • MS Excel
  • Auto Level
  • Surveying
  • PEB Erection
  • Road Infrastructure
  • Irrigation
  • Landscaping
  • Safety awareness
  • Estimate preparation
  • Structural analysis
  • Soil testing
  • Inspection management
  • Consulting
  • Stormwater management
  • Site inspection

Timeline

Site Engineer Civil / Site Supervisor

Tamimi Pre-Engineering Building
05.2016 - Current

Sub Engineer Civil

National Logistics Cell (NLC)
01.2014 - 02.2016

Secondary Education -

KAILASH High School

Bachelor of Engineering -

PRESTION UNIVERSTY ISLAMABAD

DAE - Civil Technology

Rawalpindi Polytechnic Institute

Personal Information

  • Title: Site Engineer Civil / Site Supervisor Civil
  • Driving License: Valid Saudi Driving License

Certifications And Approvals

  • Approved Civil Site Engineer (NEOM & Major Projects)
  • Valid Saudi Driving License
Junaid Zahid