Seasoned Senior Electrical Engineer with over 15 years' experience in the Power plant industry. Superior problem-solving and time management abilities. Adept at diagnosing malfunctioning systems and identifying the cause of breakdown. Experienced in managing electrical project lifecycle from design phase to delivery and implementation.
Overview
15
15
years of professional experience
1
1
Certification
Work History
Senior Electrical Engineer
Arab Paper Manufacturing Company ,50 MW Cogeneration Plant
Second Industrial City Dammam
02.2015 - Current
Directing ,supervising ,instructing and participating in the maintenance activity ( preventive ,predictive , corrective ) conducted by Electrical maintenance team in each plant section.
Contributing in preparing the yearly preventive maintenance plan ,issuing the monthly maintenance and shut down plan and preparing required spare parts according to approved budget .
Planning ,initiating and carrying out projects that improves efficiency and reduce operating cost
Performed maintenance procedures and repairs on existing electrical products and systems.
Ensuring that all corporate policies and occupational safety and health administration rules are performed when carrying out any maintenance function
Contacting with suppliers and purchasing department to insure that all parts and material required are on hand and monitoring spare parts inventory.
Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
Retested electrical products and systems to determine effect of modifications.
Improved methods for measurement, documentation and work flow management.
Senior Electrical Engineer
ISGEC Heavy Engineering Limited
Noida
12.2012 - 01.2015
Installation and commissioning of all electrical equipments associated with Turbine, Alternator and Boilers
Oversaw teams of electrical contractors focused on installing cable tray ,Electrical switch boards ,transformer and cable laying
Performed in-depth electrical acceptance testing of completed hardware.
Coordinated materials delivery and organization to maintain smooth flow of work.
Checked work quality and compliance with design specifications.
Read and interpreted Lay out drawings, diagrams and schematics to correctly coordinate work.
Negotiated schedules, work plans and payment structures with subcontractors.
Reduced electrical construction hazards with upgraded safety policies and stringent enforcement.
Inspected and performed validation testing for designed systems and third-party installations.
Review of all Technical Documents SAT ,FAT reports for Electrical works and maintain the DPR
To coordinate regular meeting with Client related job progress and electrical approval and changes in drawing as per Site condition
Assistant Manager
Core Green Sugars and Fuels Pvt Ltd ,25 MW Cogeneration Plant
Yadgiri
05.2010 - 12.2012
Erection and commissioning of 25 MW Cogeneration plant and 110/11 KV switchyard
Follow up works with Vendor and consultant regarding selection of electrical equipments, single line schematics, Cable scheduling, Sizing of transformers and Load calculation.
Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
Created plans and communicated deadlines to complete projects on time.
Schedule and perform routine maintenance on all electrical equipment
Supervise maintenance associates on assigned shifts.
Assistant Engineer
OEG INDIA PVT LTD ,10 MW Cogeneration plant
Palghat
04.2009 - 04.2010
Operation and maintenance activity of Electrical equipment of 10 MW Power plant.
Evaluated power needs for various systems.
Performed maintenance procedures and repairs on existing electrical products and systems.
Junior Electrical Engineer
DSCL Sugars
Ajbapur
06.2007 - 03.2009
Operation and maintenance activity of Electrical equipment of 36 MW Power plant
Education
Bachelors of Engineering - Electrical And Electronics Engineering
ANNAMALAI UNIVERSITY
CHIDAMBARAM
05.2007
Skills
Project Management
Budgeting
Circuit diagnostics
Time management
Technical Support
Cost Control
Strategic planning
Employee scheduling
Certification
CII - Certified Professional in Energy Efficiency
Medium Voltage Switchgear Operation, ABB - 2020
Timeline
Senior Electrical Engineer
Arab Paper Manufacturing Company ,50 MW Cogeneration Plant
02.2015 - Current
Senior Electrical Engineer
ISGEC Heavy Engineering Limited
12.2012 - 01.2015
Assistant Manager
Core Green Sugars and Fuels Pvt Ltd ,25 MW Cogeneration Plant
05.2010 - 12.2012
Assistant Engineer
OEG INDIA PVT LTD ,10 MW Cogeneration plant
04.2009 - 04.2010
Junior Electrical Engineer
DSCL Sugars
06.2007 - 03.2009
CEI - Certified Electrical Inspector
[Area of certification], [Company Name] - [Timeframe]
Bachelors of Engineering - Electrical And Electronics Engineering
ANNAMALAI UNIVERSITY
Similar Profiles
Osama Waleed Abu KishkOsama Waleed Abu Kishk
Quality Control Manager at Arab Paper Manufacturing Company (WARAQ)Quality Control Manager at Arab Paper Manufacturing Company (WARAQ)
Operation and Preventive Maintenance Manager at Carthage Power Company (Independent Combined Cycle Power Plant 471 MW)Operation and Preventive Maintenance Manager at Carthage Power Company (Independent Combined Cycle Power Plant 471 MW)
Internship at Nishat Chunian Electric Company Ltd, Pakistan (NCES,s 1x46 MW coal-based captive power plant)Internship at Nishat Chunian Electric Company Ltd, Pakistan (NCES,s 1x46 MW coal-based captive power plant)