Experienced professional with a strong background in commissioning management, consistently achieving project objectives and meeting operational criteria. Recognized for exceptional team collaboration skills and a track record of driving successful project completion. Dependable and adaptable, excels in project planning, system integration, and quality assurance.

Overview

19
19
years of professional experience

Work History

Pre-Commissioning Manager

RTCC-Al Rashid Trading & Contracting Company (Closed Joint Stock Company)
06.2024 - Current
  • Project: Downstream Gas Pipeline-HUPISD
  • Owner: ARAMCO
  • Oversaw the construction of four new valve stations and 160km of 56' pipeline for the Sales Gas storage phase, ensuring compliance with ARAMCO standards.
  • Coordinated multidisciplinary teams to execute reinstatement work, chemical cleaning, pigging, hydrostatic testing, functional testing, and leak testing for the ARAMCO Sales Gas storage phase 1 project.

Pre-Commissioning Manager

RTCC-Al Rashid Trading & Contracting Company (Closed Joint Stock Company)
04.2021 - 03.2024
  • Project: Shuqaiq Water Transmission system phase-3
  • Owner: Saline Water Conversion Corporation(SWCC)
  • Managed the construction of four new pipelines (80", 64", 44") and associated stations to transport 275,000 m3/day of potable water from Shuqaiq Phase3 Desalination Plant and Baysh Dam WTP to Abha, Samta, Jizan, Mahayil, and Majardah.

Coordinate inspections, commissioning, joint inspections and Site Acceptance Test (SAT).

Pump site acceptance tests Pump operation test,Pump vibration measurement ,test report. Prepares and keeps up‑to‑date the pre‑commissioning and commissioning execution plans. Supervises the preparation of the performance test procedures and the operating manuals. Supervises the preparation of the pre‑commissioning and commissioning procedures.

Manages the execution of pre‑commissioning,

Enhanced project efficiency by coordinating with multidisciplinary teams to ensure timely completion of tasks.

  • Generated detailed reports on commissioning activities, providing insights into progress and areas in need of improvement.
  • Commissioned and initiated start-up of high-pressure air compressors (70 bar) for surge vessel applications.
  • Led the pre-commissioning activities for the Shuqaiq Water Transmission System Phase-3 project.

PRE-Commissioning Manager

Diamond Range, MEWA
02.2018 - 01.2021
  • Project : Pipe line &pump station (A) Owner: Ministry environment of water& Agriculture
  • Supervision all commissioning testing activities throughout all stages of commissioning
  • Identification of installation and design faults and propose and implement solutions
  • Initiation and implementation of Fault Records / Technical Queries
  • Lead commissioning delivery for a particular area and discipline
  • Receiver a Hot /Cold permit, Logout/Tag out producers Request
  • Ensures the preparation of final reports and certificates

Commissioning Manager

Al-Bashaier Company
02.2016 - 01.2018
  • Project.Project:3B Strategic Tank and pump station Owner :National Water Company NWC
  • Feb2017 - Jan2018
  • Coordinated equipment testing schedules, ensuring timely completion without compromising quality or safety standards.
  • Keep abreast in planning strategies to achieve project completion with available resources.
  • Optimized resource utilization for various projects under management by prioritizing tasks based on criticality while maintaining focus on timeframes and deliverables.
  • Contribute views on designs, constructions, and proposals during management meetings.
  • Manage and update records and reports across different strata of the workforce.
  • Collaborate with clients and staff to deliver contracts within specified guidelines.
  • Interact and negotiate with clients on commissioning goals and guidelines.
  • Participate actively in diverse operational aspects of project commissioning.
  • Promote company standards by ensuring accuracy of systems results.

Senior Technical Support Engineer

National Consultant Office
06.2011 - 05.2016
  • Trouble shooting, diagnostics procedure and root cause analysis on the Equipment's
  • Improved overall system stability by conducting thorough root cause analysis on recurring issues and implementing corrective actions.
  • Spearheaded internal initiatives aimed at improving overall support performance metrics across the organization.
  • Increased customer satisfaction by efficiently resolving technical issues and providing exceptional support.

Pre-Commissioning Engineer

Bosch Rexroth Company (AGETC)
09.2007 - 08.2010
  • Execute and supervise dealings in accordance to commissioning guidelines and deadlines
  • Prepares and keeps up-to-date the pre-commissioning and commissioning execution plans Supervises the preparation of the performance test procedures and the operating manuals
  • Supervises the preparation of the pre-commissioning and commissioning procedures
  • Follow up ECC,SCC, MCC to Turn over document (TOD)

Carry out Pre-Commissioning inspections

  • Enhanced equipment efficiency by developing and implementing commissioning procedures.
  • Managed multiple projects simultaneously, meeting deadlines while maintaining high-quality work standards.

Application Support Engineer

Viking Pump, Inc.
09.2005 - 08.2007
  • Utilize FEA to predict design robustness
  • Create test plans and assure successful completion
  • Worked closely with developers to provide feedback on application designs based on user requirements.
  • Addressed technical issues and guided end users through resolution.

Skills

  • Project closeout
  • Maintenance planning
  • Customer focus
  • Documentation review
  • Scheduling
  • Quality control
  • Environmental awareness
  • Equipment testing
  • Training coordination
  • Program implementation
  • Asset management
  • Construction oversight
  • Industry standards
  • Energy efficiency
  • Site acceptance testing
  • Project controls
  • Scheduling expertise
  • Controls systems
  • Start-up planning
  • Commissioning strategy
  • Operational readiness
  • Pre-commissioning activities
  • Teamwork
  • Problem-solving
  • Time management
  • Problem-solving abilities
  • Multitasking
  • Reliability
  • Excellent communication
  • Critical thinking
  • Troubleshooting skills
  • Team collaboration
  • Team leadership
  • Decision-making
  • Safety assessment
  • Relationship building
  • Operational efficiency
  • Operating budgets
  • Team management
  • Team building
  • Analytical thinking
  • Health and safety

Timeline

Pre-Commissioning Manager

RTCC-Al Rashid Trading & Contracting Company (Closed Joint Stock Company)
06.2024 - Current

Pre-Commissioning Manager

RTCC-Al Rashid Trading & Contracting Company (Closed Joint Stock Company)
04.2021 - 03.2024

PRE-Commissioning Manager

Diamond Range, MEWA
02.2018 - 01.2021

Commissioning Manager

Al-Bashaier Company
02.2016 - 01.2018

Senior Technical Support Engineer

National Consultant Office
06.2011 - 05.2016

Pre-Commissioning Engineer

Bosch Rexroth Company (AGETC)
09.2007 - 08.2010

Application Support Engineer

Viking Pump, Inc.
09.2005 - 08.2007