Pursuing a challenging career in the field of Electric and Control Engineering that utilize and enhance educational background, as well as skills.
Overview
10
10
years of professional experience
5
5
years of post-secondary education
Work History
Senior Electrical Engineer
Almabani Contractor company
Riyadh
01.2022 - Current
Work as testing & commissioning Sr. Electrical engineer for Riyadh metro project for 5 stations & 4 Egress shafts as follow :
Small power
Start up
Power
Electrical Engineer
CSI, Commissioning Services International L.L.C
Riyadh
06.2020 - 12.2021
Small Power Team: - Test and Commissioning for small Power load “Cold Test and Live Test”
Submission of ATP1, ATP 2, ATP 3, ATP 4
Tracking of ATP’s and WIR’s
Start UP Team: - Performance of start-up activity for FCU and AHU
Performance of start-up activity for Water Heater
Performance of start-up activity for FANS
Power Team: - Testing and Commissioning for MDB, SMDB, ESMDB, MCC, RMU
Submission of ATP1, ATP 2, ATP 3, ATP 4
Tracking of ATP’s and WIR’s.
Electrical Engineer
Consolidated Contractor Company
Riyadh
01.2014 - 06.2020
1-Mobilization Department: Work as electrical site engineer for modification of BACS main office and implementation of air base site office
2-Traffic Management And Road Work: Working for all electrical traffic management work
Working on installation of generators by double check the planning guidance, and the manufacturer’s safety and usage documentation
Actual planning starts with a drawing of both the generator itself and all of its support systems
Working on installation of lighting poles
Pulling of power cables after checking temperature range of cable, bending radius of cable, maximum tension of cable and Weight of the cable
Termination of power for gantry and VMS
Undertaking a range of traffic engineering studies from feasibility to detailed design
Ensure technical content and quality of output produced is in line with the project brief
Sharing knowledge and supporting the team to create a collaborative work environment
Familiar with relevant Health and Safety to promote a culture of safety awareness within the team
3- Utility Diversion: Working for utility diversion with traffic management for removing of lighting poles and diversion of substation and co-ordination with stakeholders for diversion of power and fiber cables
4-MEP dep: - Working as MEP engineer of Park and Ride building for all the following: - 1-Cable Tray and cable Trunk
2-LV and MVD system
3-fire alarm system with ICAD
4-Building Management System
5-Earthing System
6-PV System
7-Lighting System
5-TOT dep: Working in TOT department as ESO with good knowledge for the following: - 1-Overview for SLD of line 1 and line 2
2-STTP and LPS loops for line 1 and line 2 stations
3-SLD for 750V DC Controller
4-SLD for UPS and Battery
5-SLD for passage posts
Also, I am good knowledge for procedures and steps of operation of SSTP, LPS, UPS,750Vdc controller
6-OBC dep : Installation of Integrated traffic system and traffic duct for traffic signals
Installation of lighting poles
Installation of gantry and VMS
Installation of sec meters and traffic controllers
Diversion of power substation in coordinate with contractor of Saudi electrical company
Installation of RMU in coordinate with contractor of Saudi electrical company
Installation of Viaduct and decorated lightings
8- Implementation of all electrical work as follow: - -Installation of MDB
Pulling of power cables from RMU to substation to MDB
Pulling of power cables from MDB to mechanical Pumps, DC filters, power sockets, lighting and RTU
Implementation of megger, continuity and bolts torqueing for MDB with test and commissioning team.
Education
B.S in Engineering - Electrical and Control Engineer
Arab Academy For Science Technology And Maritime Transport
Alexandria
07.2008 - 07.2013
Certificate - PMP
Project Management Professional (PMP) Certificate
Skills
Solving facilitative complicated and critical situations
undefined
Coursework
English conversation
AutoCAD
Power Distribution system
Personal Information
Military Service: Exempted
Date of Birth: 06/07/90
Gender: Male
Nationality: Egyptian
Marital Status: Married
Academic Research
Graduation Project, Concentrated solar power by using parabolic trough which consists of a linear parabolic reflector that concentrates light onto a receiver positioned along the reflector's focal line. The receiver is a tube positioned directly above the middle of the parabolic mirror and filled with a working fluid. The reflector follows the sun during the daylight hours by tracking along a single axis. A working fluid (water) is heated as it flows through the receiver and is then used as a heat source for a power generation system., Automatic Control principles as a closed loop control system that designed to track the sun light., Electrical Machine Drives to control Parabolic Mirrors Reflectors using a Chopper DC motor drive., Measurement and Instrumentation for the light, temperature, flow rate transducers in the control circuit
References
All references are available upon request.
Timeline
Senior Electrical Engineer
Almabani Contractor company
01.2022 - Current
Electrical Engineer
CSI, Commissioning Services International L.L.C
06.2020 - 12.2021
Electrical Engineer
Consolidated Contractor Company
01.2014 - 06.2020
B.S in Engineering - Electrical and Control Engineer
Arab Academy For Science Technology And Maritime Transport
07.2008 - 07.2013
Certificate - PMP
Project Management Professional (PMP) Certificate
Similar Profiles
Dablu SinghDablu Singh
Electrical Technician at Almabani General ContractorElectrical Technician at Almabani General Contractor