Summary
Overview
Work History
Education
Skills
playing circket ,
Timeline
Hi, I’m

Khawaja M. Asghar

Telecom Eng
Tabuk
Khawaja M. Asghar

Summary

To work in an organization where I can use my skills to achieve the organization objective and get conductive environment to Learn and grow. Currently seeking a challenging career in the fields related to Wireless and Telecommunication to achieve professional excellence and distinction through sheer proficiency & team effort to attend personal ideas & objectives and to be a part of an organization that will effectively help me define my skills and goals. PERSONAL PROFILE A self-motivated enthusiastic & determined individual who thrives in a challenging environment. Willing to use my skills for the best of the organization my thirst for knowledge has always made me go beyond others in learning and application. A team worker who stresses on working and advances with the whole team an individual open for positive and negative feedback that would help me improve in various departments of my Life.

Overview

10
years of professional experience
1
Language

Work History

Gulf Business Horizon, GBH, STC

S Project
11.2020 - Current

Job overview

  • Trouble Shooting Of Internal & External Alarm &Ratification
  • RET, TMA, UMPT, GTMU Configuration
  • Trouble Shooting on MW Links alarms (BD status, MW LOF, ETC)
  • Trouble Shooting on RAN alarms (RTWP,Cell unavailable,BBU CPRI Interface errors,etc)
  • Trouble Shooting Of VSWR.Check VSWR by DTF test
  • Using Of ISDP Software for Object Huawei 3D survey EHS,QC& heavy survey
  • Using Mateline Software for CM,PM WO task and SPMS
  • Heavey survey,FDED and LOS survey collecting data and make reports and submitting.

IES Telecommunication (Pvt) Ltd

ENGINEER
01.2018 - 01.2019

Job overview

  • BIDDING PROJECT & JAZZ LTE 2019 & UFONE MEGA PROJECTS: (North & Centre Region in Pakistan)
  • Assembling Installation & Alignment Of Microwave (Dish 0.3m, 0.6m, 0.9m, 1.2m, 1.8m)
  • Installation of Microwave Link (1+0 NP) (1+1HSB) (1+0,1+1 Xpic) (1+1 Xpic+HSB) (SD Link) (SDB 5G)
  • Dismantling of Sites, Microwave Links (1+0, 1+1, XPIC, Dish 0.6m, 0.9m, 1.2m, 1.8m)
  • Configration of mw as per LB
  • Physical installation & amp; Configuration of HUAWE RTN (905,905A, 910A, 950A,980A)
  • Pre- ATPs/PATs
  • MW Link Configuration & Commissioning
  • Using Of ISDP Software for design QC, Smart QC & EHs
  • 3D Survey of deferent Projects Zong CMpazk,Ufone,Jaz
  • Using Of ISDP Software Object Huawei
  • HSSE Training (Tower Climbing & Electrical Safety Training Session)
  • Rescue Training (Self Rescue, Pickup Rescue Assessment Rescue) Working On Nokia Telenor Swap Project
  • Nokia Swap Telenor Project ( Installation Swap & Rool Out Sites) :
  • Complete Survey for Nokia sites
  • Huawie 500 Ufone Relocation Merger Project (3G Expansion , & Rool Out Sites):
  • Clearness Activity of Rool out And Sector Split site (ATP Done, ISDP Done)
  • Trouble Shooting Of Internal & External Alarm Ratification Sector Swap
  • RET Installation & Configuration
  • Trouble Shooting Of VSWR.Check VSWR by site master.

KCN TELECOMUNICATION (PVT) Ltd

02.2013 - 03.2016

Job overview

  • HSSE TRAINING (TOWER CLIMBING & ELECTRICAL SAFETY TRAINING SESION) 3.5 Years EXPERINCE OF ZTE,NOKIA Technologies AS A ENGINEER+TECHNICIAN OF DIFFERENT PROJECTS WIRELEES-TRANSMISSION: (North1 & North2 Region in Pakistan)
  • ZTE Telenor & Zong CmPak Project (Sector split, Installation Swap & Rool Out Sites):
  • Installation of IDU & ODU Microwave Dish
  • Installation of Microwave Link (1+0, 1+1, XPIC.NEC Ipasolink)
  • Assembling & Installation of RF Antennas (Single Band, Double Band, Try Band, Quart Band, Panta Band)
  • Ret Installation & Configuration & Looping
  • Installation of GPS Antennas
  • Installation of Sector Addition in 2g, 3G, LTE 4G, GSM Sites
  • Installation of RRU (8863, 8862, 8861, GUL 1812 etc)
  • Installation of BBU or 4G.3G Cards (FS5, FS3, CC2, CC16, BPK, BPN1, BPN2 Cards)
  • Installation of BBU, LPU CSU510a, CSU501A, SCU501B, Breakers)
  • Installation or Connection of ZTE Rectifier & Battery Bank, Rectifier Module, Breakers, Connectivity In Main AC Power.)
  • Measurement VSWR and (Bird, Alarm Testing and Pre ATPs/PATs)
  • Trouble Shooting Of Internal & External Alarm
  • Installation Or Internal & External Alarm Configuration, Rectification Or pitching Connectivity ( DG Run, Dc Low Voltage, Main AC failure, Cp fail, Door Open, Fuse Born Out, High Temp, Smoke.)
  • Clearness Activity of CMPAK Rool out And Sector Split site (ATP Done, EPMS Done)
  • Commissioning of NEC link
  • (200,400,1000)
  • ZTE 3G/4G LTE –ZONG CMPAK ROOL OUT SITES COMPLETE INSTALLATION:
  • Installation of RRU (8881,8882,8861,8862A 8500.)
  • Troubleshooting of BBU & RRU SECTER SWAP
  • Installation of BBU & Card (BPK,BPKe1,BPKe,BPL,BPN2,FS3,FS5,CC16, CC2,UBPG1,UBPG2,UBPG3, SA PM)
  • Commissioning using LMT software
  • Using EPMS software for EHS,QC

Education

Allama Iqbal Open University

B.A (Bachelor Of Arts)

Board of Technical EducationPunjab

DAE from Telecommunication

Board of Technical Education Peshawar

DAE

Board of Intermediate and Secondary education

MATRIC from Science

University Overview

. 82502.0109546.1. 2486755719. Urdu, English, Arabic Kashmiri.

Skills

COMPUTER SKILLSundefined

playing circket ,

im good player and this  is a my favorite game.

Timeline

S Project

Gulf Business Horizon, GBH, STC
11.2020 - Current

ENGINEER

IES Telecommunication (Pvt) Ltd
01.2018 - 01.2019

KCN TELECOMUNICATION (PVT) Ltd
02.2013 - 03.2016

Allama Iqbal Open University

B.A (Bachelor Of Arts)

Board of Technical EducationPunjab

DAE from Telecommunication
04.2015

Board of Technical Education Peshawar

DAE
04.2013

Board of Intermediate and Secondary education

MATRIC from Science
04.2010
Khawaja M. AsgharTelecom Eng