Chemical and Process Engineering with mechanical bias where having knowledge of PLC,Pneumatics and Hydraulics, where it leads to automation of process and Equipment's.
Analytical problem-solver with proven success conducting repair and maintenance work. Communicated technical concepts with multidisciplined teams, organises resources and stays to schedule. Adopts methodical approach for efficient and timely work process.
Overview
16
16
years of professional experience
6
6
years of post-secondary education
Work History
Maintenance Specialists
Riyadh international catering corporations
Riyadh, Riyadh Region
08.2021 - Current
Processing maintenance and repair request around 10 per day in Housing Appliance, Electrical and Plumbing problems
Assigning Suitable Vendor which is outsourced.
Material Price checking
Performed work as per company SLA.
Invoice verification
Costing reports
Housing Audits
Housing MOMRA works.
Product Research Development Manager
petform private limited
Colombo , Sri Lanka
08.2018 - 11.2020
ESTABLISH OPTIMIZED TARGETS TO QUALITY ASSURANCE, PRODUCTION AND MAINTENANCE DEPARTMENTS
MANAGING STAFF ONE RESEARCH ASSISTANT
ESTABLISHING DESIGN AND DEVELOPMENT OF PET,HDPE,LLDPE,PP PRODUCTS ACCORDING TO FOLLOWING STANDARDS (CLAUSE 8.3 OF ISO)
ISO9001-2015
ISO14001:2015
ISO18001:2007
SLS1336
MONITORING AND CONTROLLING OF
SPECIFIC POWER CONSUMPTION (9 kwH/kg)
OEE OVERALL EQUIPMENT EFFECTIVENESS (TARGET 85%)
COMPRESSOR EFFICIENCY 70-90%
EQUIPMENT PURCHASE AND SYSTEM DESIGN AS FOLLOWS
COOLING TOWER
COMPRESSED AIR SYSTEM HIGH PRESSURE (35-40Bar).
HVAC VENTILATION SYSTEM TO COPE WITH ISO22000.
RESIN CENTRAL FEEDING SYSTEM
SPARE PARTS SOURCING PNEUMATIC SYSTEM (FESTO,MINDMAN PARKER &AIRTEK ) AND HYDRAULIC SYSTEM
DESIGN DRAWING AUTOCAD 3D AND PROTOTYPING
PROTOTYPING IN OUTSOURCING -3D PRINTING
NEW PROJECTS TO PETFORM GROUP OF COMPANIES (PAPER CUP -5 STANDARD SIZE OF PAPER CUP FACTORY LAYOUT )
Project Engineer
Jegma Technical Service LLC
Dubai, United Arab Emirates
09.2016 - 02.2018
MANAGED OVER 20 PER DAY NEW INSTALLATION AND TROUBLESHOOTING OF MAINTENANCE AND REPAIR
ACCESS CONTROL SYSTEM –SOFTWARE AND HARDWARE
PAID PARKING SYSTEM - SOFTWARE AND HARDWARE
HIGH SPED SHUTTER
AUTOMATIC GATES
AUTOMATIC DOORS
SOURCING MATERIALS IN OVERSEAS AND ENSURES THAT THESE PARTS MEET ENGINEERING SPECIFICATIONS AND ALL RELEVANT SAFETY STANDARDS.
CONDUCTING SERVICE REVIEW- CLIENT RELATIONSHIP AND CLIENT COORDINATION.
COORDINATION BETWEEN INNER SUBORDINATES AND CLIENT REPRESENTATIVES.
TECHNICAL SUPPORT FOR CLIENTS.
PREPARING DESIGN DRAWINGS in AutoCAD.
Project Engineer
Nigma Lift installation and maintenance LLC
Dubai , United Arab Emirates
09.2012 - 07.2016
Managed following works.
ELV INSTALLATION, TESTING, COMMISSIONING AND MAINTAINING EQUIPMENT NEEDED FOR ELV SYSTEM.
ELECTROMECHANICAL PROJECT MANAGEMENT (MAN, MATERIAL AND SOURCING)
ELV PROJECT COORDINATION AND PLANNING TOWARDS WORKING WITH FACILITY MANAGMENT AND PROPERTY MANAGEMENT
PROJECT OPTIMIZATION AND ANALYZING (COSTING –PRE-CALCULATIONS AND POST CALCULATION)
TENDER DOCUMENT PREPARATIONS –TECHNICAL PROPOSAL OF PROJECT