Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Louay Madani

Al Jubayl

Summary

Experienced with designing and implementing control systems for industrial applications. Utilizes expertise in PLC programming, HMI development, and system integration to optimize operational performance. Knowledge of industry standards and best practices ensures reliable and efficient control solutions.

Overview

8
8
years of professional experience
1
1
Certification

Work History

PHA Leader

Sabic Hadeed
Hadeed
02.2011 - 01.2017
  • Led cross-functional teams to optimize production processes and enhance operational efficiency.
  • Developed and implemented strategic initiatives to improve safety and quality standards across operations.
  • Mentored team members, fostering professional development and skill enhancement within the workforce.
  • Analyzed production data to identify trends, driving continuous improvement in workflow efficiency.

Engineer

Hadeed Sabic
01.2009 - 02.2013
  • Worked in project for upgrade dcs that helped reducing failure of card failure by 20%. That has contributed in a saving worth million Saudi riyal as the price of 2 days production. I managed projected for upgrade 3300 bently rack to 3500 model full integrated with DCS establish PM cycles.
  • From 2023-2016 worked as senior engineer for hadeed sabic and lead project that worth 4 million Saudi riyal to in the company to integrate IT PC with OT network and have daily production report in the same level of IT. This has been achieved after reviewing cyber security at sabic IT measure which has reduced paper work and hardened process control system that eliminated use of USB drive to transfer file. I executed SCADA and PLC system interfacing for Honeywell using Modbus protocol and saved wiring and procurement of 4 panels and 8 cards that costs 20000 USD.
  • Implemented first of its kind safety instrumented function by installation of MTL galvanic isolators in ESD system as inhouse project to avoid engineering which saved 15000 SAR material and labor cost.
  • From 2016 till 2026 worked as lead process control system engineer. Implement Pi software by utilizing DCs firewall as interface between corporate layer and OT network that eased the access to daily consumption report and conduct and collect event summary from DCS by viewing history from any machine connected at company with proper security measure this has contributed in zero virus intrusion in OT network at year 2020 for 6 years continuous at Hadeed and sabic till the separation of sabic.
  • Coaching new comers less than 3 years have and mentored them in administering DCS revamping yokogawa Centum VP DCS in year 2024 specially loop check and detail engineering stage review and hot commissioning. Commsining recently in 2026 Turaround new custodyflowmeter at Hadeed to comply with SEEK( energy efficiency).
  • Point 3 second page
  • Work under pressure
  • Operated the project within short time frame that avoided less than 1 million Saudi riyals equivalent within one day production.
  • Driving project to success
  • Attending
  • Led a project of dcs upgrade in 2016 for honeywell system.
  • Think about project show in term of project leadership and saving
  • Take ownership to be modified mentoring and coaching to be rephrased.
  • Remove instrument incharge to be led with instrument commissioning

Education

Bachelor - Applied Electronic Engineering

Yanbu Industrial College
01-2008

Skills

  • Process control system maintenance
  • Project management
  • Network performance optimization

Certification

  • MIRAN Training - [PROJECT MANAGEMENT PLANNNG ]

Languages

Arabic (Native)
English fluent in speaking and writing

Timeline

PHA Leader

Sabic Hadeed
02.2011 - 01.2017

Engineer

Hadeed Sabic
01.2009 - 02.2013

Bachelor - Applied Electronic Engineering

Yanbu Industrial College
Louay Madani