Accomplished engineer specializing in the management and design of large-scale digital projects, including wastewater treatment and irrigation systems. Demonstrated ability to lead technical teams, maintain high-quality standards, and consistently meet project deadlines. Strong focus on achieving operational excellence and compliance with specifications.
-Acted as the primary liaison with municipalities and utility authorities (SEC, Mobily, RCJY, etc.) to secure permits and critical design data.
-Facilitated and chaired weekly progress meetings with contractors and the National Water Company (NWC) to ensure project milestones were met.
-Supervised and validated topographic survey works and site mapping essential for design accuracy.
-Oversee geotechnical investigations, soil testing, and trial pits to ensure structural integrity and informed design decisions.
-Utilizing the Autodesk Construction Cloud (ACC) platform to perform comprehensive design reviews and quality checks prior to final client submission.
-Managing the Design Review Workflow on ACC to track comments, ensure compliance with standards, and streamline the approval process.
Project Engineer – Design Services Agreement (Western Cluster)-Kunhwa Engineering & Consulting
- Conducted a comprehensive Business Case for infrastructure design projects within the Western Cluster,
- Represented the design team in strategic meetings with the Strategic Planning Department at both the Eastern Cluster and the National Water Company (NWC) headquarters.
-Developed and delivered Business Case presentations for 15 design groups, ensuring alignment with client requirements and technical standards.
-Managed data collection and technical analysis required to support the design phase and ensure project continuity.
1 -Pipes with fiberglass diameters of 1000 mm, 1200 mm, and 1400 mm with a total length of 10 km.
2 - square concrete Manhole 3.5*4 m
1- Pipes of fiberglass diameters from 200 mm to 500 mm with a total length of 5600 meters.
2 - Concrete manhole lined with inside and outside fiberglass type (1).
3- force main pipes with diameters of 100 mm and 400 mm, with lengths of 1200 m
4- main pump station of 100 L / S and hydraulic pressure 25 meters
5 - the number of 2 lift stations in front of the sea in Al-Khobar, each with a capacity of 25 L/S and a hydraulic pressure of 25 meters
1 - Iron tank diameter 25 meters, height of 15 meters, and a storage capacity of 7000 M3.
2. Pump station including buildings for the pump room with all accessories, guardroom, and chlorine room.
3 - Water lines with a diameter of 300 mm from and to the tank of Ductile length of 500 m.
4 - The work of a general site of gates, asphalt works, and pavements.
5 - Replacement of valves with diameters from 100 mm to 1000 mm in different areas in Al-Khobar
1 - Designing the sewage network for the special plans for the city of Riyadh, Numbers (3675 in Monceya district - 3038 in Al - Hada district, 3865 in Al - Sali district, 3155 in Heten district)
2 - Design of the water network for the special plans of the city of Riyadh, Numbers (3865, Sali district - 3038 in Hada district- 3675 in Monceya district)
3 - Design of irrigation systems for the main roads and gardens with the special plans of the city of Riyadh, Numbers (3798 Nargis district - 3857 Nargis district- 3797 Nargis district)
1-Concrete Pipe diameter 1100 mm lined with fiberglass
2- Concrete square Manholes 3.5m*4.0m
3- Concrete pipe jacking diameter 1100mm
4- Shafts unnecessary pipe jacking diameters of 5 meters
1- Study, evaluate, and review the current status and future of the sewage networks in the Jazan Region
2-Supervising the sewage networks and house connections in the plan of the five and six in the city of Jizan Contract (Gulf Arab Contractors). The project includes the following:
- Installation of Vitrified Clay Pipes, diameter of 200 mm & 250 mm.
- acts of house connections to all homes located within the limits of the project.
3- Supervising the project of the sewerage pumping station and treatment plant at MPR Housing Prince Mohammed bin Fahd in Jazan, contract (Firm Zafer Falah Shahrani Contracting). The project includes the following:
-Installation tubes, vitrified clay diameter 200 mm & 250 mm.
- Acts of house connections to all homes located within the limits of the project.
-Implementation of the lift station and treatment plant membranes MPR system implementation company (VEOLIA WATER solution & technologies)
4-Supervision of the execution of the project sewage networks and pumping stations, and the main pumping station, villages of Alkrpos and Almabog of the city of Jizan, contractor (Sulaiman Alqsomy Est Contracting). The project includes the following:
- Installation of vitrified clay pipes with diameters of 200 mm to 500 mm.
- Number 2 lift station, the main pumping station, and the force main line diameter of 300 mm, length of 4 km.
5-Supervision of the execution of the project for sewage networks and pumping stations of the city of Jizan, contractor (Sulaiman Alqsomy Est Contracting). The project includes the following:
- Extension of vitrified clay & Fiberglass pipes with diameters of 200 mm to 1400 mm.
- Number 26 lift station.
- Designing The Network Of Sanitary Drainage
- Designing the hydraulic system for the Lifting Station
-force main Line
- Designing The Network Of Sanitary Drainage
- Designing the hydraulic system for the Lifting Station
-force main Line
- Designing The Network Of Sanitary Drainage
- Designing the hydraulic system for the Lifting Station
-force main Line
Keening on developing my personality especially in the sense of leadership and creativity., Football-Reading., Browsing Internet every day and reading articles not only in civil engineering but also in other majors such as architecture engineering.