Summary
Overview
Work History
Education
Skills
Custom
Personal Information
Languages
Work Availability
Timeline
Mahmoud Abo Madini

Mahmoud Abo Madini

Jubail,Eastern Province
You only have to do a few things right in your life so long as you don’t do too many things wrong.
Warren Buffett

Summary

Seeking a rewarding career in construction project management as a Project Engineer/Inspection Engineer/Construction Technical Support Representative. With a strong foundation in engineering, analytical prowess, and organizational skills, I aim to contribute to organizational growth and success. Committed to excellence and continuous improvement, I look forward to leveraging my expertise to drive projects forward and achieve shared objectives.

Overview

15
15
years of professional experience
3
3
years of post-secondary education

Work History

Operator

Saudi Paper Manufacturing Company
Dammam , Eastern Province
01.2009 - 10.2010
  • Water treatment plant operator, Operator (electrical power plant), Steam generating station operator

Aramco plumbing inspector engineer

ABS GROUP Saudi Arabia
Riyadh , Jubail
10.2010 - 12.2014
  • Monitor and perform quality activities at all stages of projects
  • Assure that contractors work is in compliance with SAUDI ARAMCO engineering requirements, standards, procedures, specifications, and Schedule Q of the project contract
  • Perform Hold point, Witness and Surveillance inspection and tests at manufacturing facilities or construction sites to ensure compliance with SAUDI ARAMCO requirements and project specification
  • Inspect material and equipment as applicable to ensure compliance with SAUDI ARAMCO requirements for proper handling, storage and protection at SAUDI ARAMCO facilities and construction site
  • Monitor Contractors Quality System, records and quality personnel for compliance with requirements
  • Review and evaluate Contractors quality document submittals
  • Witness on-site material and installations tests for compliance with SAUDI ARAMCO standards
  • Record legibly and accurately all controversial and non-complying construction practices, materials and equipment and report to supervisor detailed potential problems for early resolution
  • Co-ordinates with Construction group, Client’s representative and third party inspection agency to perform stage wise inspection in line with the approved Inspection and Test plan, Inspection checklist etc Monitoring the implementation of receiving inspection, Identification and Traceability of all materials on the project
  • Monitoring the use of proper calibration instruments at proper location for delivering inspection activities
  • Identify the activities where improvement can be done
  • Monitoring each and every activity as per Approved construction method statement (CMS)
  • Ensure that Contractor quality records are being maintained on a regular basis, Overall monitoring implementation and outputs of quality control on the Project
  • Review material certification for project material to ensure it meets specification and Check that it corresponds to actual material supplied
  • Quality control of plumbing works construction activities as per approved QA/QC plan
  • Attending product quality related meetings with client, seminars organized by different local industries, equipments and local raw materials suppliers companies, exhibitions or events related to company products and representations the department on behalf of the organization
  • Inspection of site preparation, deep excavation, sheet piling, back filling, dewatering system and supervision on its installations
  • Maintain standards of safety and comply with Company’s Health, Safety & Environment Management System requirements
  • Discussing and finalizing technical quarries with client engineering.

Asst Engineer I

Jatco Saudi Arabia
Jubail , Eastern Province
12.2014 - 09.2015
  • Maintains close liaison with sites, project originators, users and other departments to ensure that all company procedures are adhered to during project execution and Identifies critical issues and areas of concern that may affect project's performance target..
  • Hold on site meetings to establish any deviations and problems and take action to solve such
  • Responsible to the Project Manager for the successful execution of assigned work
  • Interface with the Client’s engineers/Managers and ensure that all reasonable requests are met
  • Ensure inputs to weekly and monthly progress reports
  • Review and consolidate reports on project progress in order to support Management decision-making
  • Ensure effective communications and co-ordinations between all piping team members and all other disciplines, to ensure mutual awareness of requirements and sharing of information and common resources
  • Monitor overall productivity and efficiency of the project, forecast and anticipate potential problems and difficulties meeting milestones coordinate with project team including all disciplines to resolve problems
  • Conduct routine meetings with piping team to monitor the projects’ performance and assess their performance
  • Delegate review responsibilities to subject matter experts as necessary
  • Coordinate, review, and consolidate all piping review comments
  • Ensure the application of correct standards in the design and development of Project deliverable
  • Ensure close and active coordination with proponent and other support to secure safe and smooth project executions
  • Provide technical leadership and guidance to the project team, including the clients
  • Provides technical oversight of facility layout, including considerations related to process, mechanical, fabrication, installation, operations and maintenance
  • Perform Evaluation and verification for FEED technical document of piping
  • Ensure that pipe systems are installed, tested and commissioned in accordance with the applicable codes, specifications, drawings, Project’s, and design documents
  • Review and monitor the Project Execution Plan Review and monitor physical progress at Site and compare that with schedules.

Asst Engineer I

Jatco Saudi Arabia
Jubail , Eastern Province
09.2015 - 05.2020
  • As project quality management and site supervisor
  • Managed project Quality activities during procurement and construction phases of early works and site preparation projects
  • Implemented Schedule Q requirements
  • Resolved Quality related conflicts between PID and PMT
  • Consulted CSD for feedback and recommendations, and closed log book entries and NCR’s
  • Ensured contractor’s compliance with SA Quality procedures and engineering standards
  • Reviewed and followed SA testing and inspection requirements of all materials and equipment during shop fabrication, and upon site deliveries and installations
  • Obtained PID approvals on contractor’s quality submittals, including batch plant and mix design approvals
  • Project closeouts and facility handovers: Process mechanical completion certificates (MCC’s) for constructed facilities and route them for signatures from concerned departments
  • Review facility inspection reports and obtain PID approvals
  • Produce survey reports with detailed facility coordinates and elevations
  • Update status sheet of completed facilities
  • Write handover letters to facility proponents
  • Site superintendent: Reviewing the detailed design package
  • Expedite & insure the material delivery within time
  • Supervise the site construction activities to confirm it is within time and it is compliance with Saudi Aramco standard
  • Visit & arrange the vendor to site from the constriction up to commissioning period.

Asst Engineer I

Jatco Saudi Arabia
Ras Tanura , Eastern Province
05.2020 - Current
  • As site supervisor and Asst Engineer
  • DBSP and Project proposal for Juaymah NGL and JOP project: Reviewing all documents and drawing related to DBSP and Project proposal Leading and coordinate lessen learn meetings and the VIP studies
  • Getting all approvals from SA CSD DIP
  • Create the E-review system for the DBSP and Project proposal review stage
  • Following up with the reviewer to close all the comments in the DBSP and Project proposal in the E-review system
  • Coordinating site visit for any survey or testing
  • Visiting site with the contractors for any survey or studies
  • Site superintendent for North terminal Project: Replaicment of 48 in pipeline between offshore and onshore
  • Managed project Quality activities during procurement and construction phases of early works and site preparation projects
  • Implemented Schedule Q requirements
  • Resolved Quality related conflicts between PID and PMT
  • Consulted CSD for feedback and recommendations, and closed log book entries and NCR’s
  • Ensured contractor’s compliance with SA Quality procedures and engineering standards
  • Reviewed and followed SA testing and inspection requirements of all materials and equipment during shop fabrication, and upon site deliveries and installations
  • Obtained PID approvals on contractor’s quality submittals, including batch plant and mix design approvals
  • Supervise contractor to achieve construction activities within the established time and design.

Education

diploma - Production, Mechanical Technology

Collage of Technology at Dammam, Dammam, Eastern Province
01.2006 - 09.2008

Skills

  • Familiar with Saudi Aramco standards & checklists
  • Good skills in MS Office software (MS Word, MS Excel, MS Front Page, MS Power Point & MS Access)
  • Fast typing in both Arabic & English
  • Excellent communication & organization skills
  • Fast learner, honest and hard working
  • Fluent written and spoken English and Arabic
  • Cheerful motivation and valuable team player
  • Able to cooperate and coordinate with other disciplines
  • Proper safety of team members and pre-fault analysis
  • Achievements and good quality of work and progress in targeted time

Custom

02/23/08, 04/09/08, ISCOSA Industries & Maintenance < Ltd, As Mechanical

Personal Information

  • Date of birth: 01/30/88
  • Nationality: Saudi

Languages

English
Upper intermediate
Arabic
Native

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Asst Engineer I - Jatco Saudi Arabia
05.2020 - Current
Asst Engineer I - Jatco Saudi Arabia
09.2015 - 05.2020
Asst Engineer I - Jatco Saudi Arabia
12.2014 - 09.2015
Aramco plumbing inspector engineer - ABS GROUP Saudi Arabia
10.2010 - 12.2014
Operator - Saudi Paper Manufacturing Company
01.2009 - 10.2010
Collage of Technology at Dammam - diploma, Production, Mechanical Technology
01.2006 - 09.2008
Mahmoud Abo Madini