Experienced Project Manager with 22 years of proven success in the Building Management Systems and Extra Low Voltage industries. Expertise in Automation and Instrumentation systems, ensuring efficient project flow through resource management and business operations organization. Skilled in procuring equipment and supplies, closely monitoring projects to meet production schedules and budgets. Recognized for exceptional leadership, successfully leading production teams, identifying challenges, and providing targeted solutions. Currently Senior BMS/ELV Project Manager for the prestigious Riyadh Metro Project, overseeing Line 1&2 stations.
Projects:
- SADARA Chemical Company,, KSA.
SADARA Chemical Company is a joint venture developed by the Saudi Arabian Oil Company (Saudi Aramco) and The DOW Chemical Company (Dow)
It is an unprecedented undertaking – the largest chemical complex ever built in the world in a single phase, with 26 integrated world-scale manufacturing plants, over 3 million metric tons of capacity per year, and a total investment of about USD 20 billion
There were about 20 ongoing sub-projects and they are in different stages but generally the overall project is in the commissioning phase
Job Description:
Projects:
- BAJEL Power Station, BAJEL YEMEN
Establishing the Configuration for 100 MW power station(4 Wärtsilä Engines each of 25 MW) in BAJEL, Yemen by using Schneider Quantum PLC and Wonderware HMI
· Job Description:
- Set clear team goals and delegated tasks and set deadlines.
- Review Project documentations for establishing proper interfaces with different systems
- Review Engineering designs
- Establishing the control networks and guiding the Implementation of the DCS control system
- Attending FAT / SAT testes with the client
- Mabruk Oil Operation SAT-12 , SERT, LIBYA
Configuration, Development, Commissioning and Start up for Oil and Gas Mabruk Field (SAT 12) at Libya, using ABB AC800xA for DCS + and PLANTGAURD For ESD and F&G system
Job Description:.
- Performing site survey, client meeting for development the Engineering design
- Assigning resources for SCADA HMI design (GRAPHIC PAGES)., Functional Logic design , Process Alarms List, Reports, Historical Trend Design, and Database software configuration.
- Guiding site installations, testing and commissioning, startup and Handover system to clint
Projects:
- NK1 Pumping station, HASSI MASSOUD, ALGERIA
Configuration, Development, Commissioning and startup of DCS system for 3 Oil Pumping Station from HASSI MASOUD to BISKRA and SKIKDA at Algeria.
Job Description:
- Implementation, testing& commissioning and startup of the ABB SCADA system between 3 Pump station across the pipe line (SP1 – SP3 – TA)(Using ABB RTU560 Software).
- Implementation of ABB DCS PLC’s & ABB ESD/FG PLC’s logic and software.
- Configuring the MODBUS (serial communications) between ABB DCS and other PLC’s Utility units.
- Graphic pages design and OPC Server Configurations.
- Site commissioning, startup, troubleshooting, system modifications and Handover to clinet
- TFT GAS Pumping Station, TFT, ALGERIA
Configuration, Development, Commissioning and Start up for GAS Pumping Station in TFT Algeria, using ABB AC800F for DCS + Tenore for HMI + PlantGuard for ESD and F&Gsystems
· Job Description:
- Implementation of the ABB DCS PLC’s logic and software.
- Implementation of the ABB ESD/FG PLC’s logic and software.
- Configuring the MODBUS (serial communications) between ABB DCS and other PLC’s Utility units.
- Developments and Graphic pages design.
- OPC Server Configurations.
- Site commissioning, startup, troubleshooting and modifications of the system.
- TCO Oil & Gas Field, TENGIZ, KAZAKHSTAN
Commissioning and Site Installation for Oil & Gas filed in TENGIZ-Kazakhstan using ICS TRILPEX - TRUSTED systems.
· Job Description:
- Site commissioning and startup
- Loop testing & troubleshooting
- System startup and handover
- TOURAH Cement–Mills 1A-2B FEEDERS
Revamping of Classic control system for Raw Mills 1A and 2B feeding systems, using Modern ABB 800xA DCS control system.
· Job Description:
- Site surveys and Offer development
- Hardware engineering (control system panel layouts, local panel layouts, wiring diagrams…etc)
- Panel manufacturing and follow-up - FAT
- On-site system installation and power-on
- Loop testing & troubleshooting - SAT
System startup and handover
- BBK Oil & Gas Field, HASSI BERKIN, ALGERIA
Configuration, Development, Commissioning and Start up for Oil and Gas Production Field at BERBERKIN, Algeria, using ABB AC800F for DCS + TENORE for HMI + PLANTGAURD For ESD and F&G system
· Job Description:
- Implementation of the ABB DCS PLC’s logic and software.
- Implementation of the ABB ESD/FG PLC’s logic and software.
- Configuring the MODBUS (serial communications) between ABB DCS and other PLC’s Utility units.
- Developments and Graphic pages design.
- OPC Server Configurations (using ABB TENORE Software).
- Site commissioning, startup, troubleshooting and modifications of the system.
- Preparations of the I/O list (input / output) and Punch List fulfillment.
- Instructor Engineer for ESD / F&G system (Site Training).
Participate in the Preventive Maintenance activities plans for 1 year on site.
- EMISAL Salt Factory, FAYOUM, EGYPT
Revamping of Old Control System Siemens S5 for a Salt factory in FAYOUM using Siemens PCS7 control system + SIMOCODE for MCC
Job Description:
- Site surveys and Offer development
- Hardware and Software engineering (control system panel layouts, local panel layouts, wiring diagrams…etc)
- Recreating control Logic from original project documents
- Panels manufacturing and follow-up - FAT
- On-site system installation and power-on of the controller system
- System switch over achieved in less than 24 hours
- KHARG Methane Field , IRAN
Configuration and Development for Oil and Gas refinery at KHARG, Iran, using ABB AC800F for DCS + TENORE for HMI
Job Description:
- Implementing and Developments of Graphic pages design
- Preparation of DCS system Data base.
- TOURAH Cement Raw Mills 1A-2B, CAIRO, EGYPT
Revamping of Classic control system for Raw Mills 1A and 2B using: ABB 800xA control system - AC800M.
Job Description:
- Site surveys and Offer development
- Hardware engineering (control system panel layouts, local panel layouts, wiring diagrams…etc.)
- Recreating control Logic from original relay logic diagrams
- Panel manufacturing and follow-up - FAT
- On-site system installation and power-on
Loop testing, troubleshooting – SAT, System startup and handover
Projects:
- Al FAYIOM Sugar Factory
Development and upgrading of Mitsubishi DCS Control System.
· Job Description:
- Site surveys and Offer development
- Hardware engineering (control system panel layouts, local panel layouts, wiring diagrams…etc)
- HMI Software Developing
-ASCC MAGUIN KILN
Configuration and Development of New Control system for a new Sodium carbonate cook kiln: Siemens S7-300 controllers + WinCC as HMI
· Job Description:
- Site surveys
- Hardware engineering (control system panel layouts, local panel layouts, wiring diagrams…etc)
- Recreating control Logic from original projects documents
- On-site system installation and power-on of the controller system
- Loop testing & troubleshooting – SAT
- ASCC KILNS MAERS & KOSIK
Revamping and Upgrading of Siemens S5 Control System of a Sodium carbonate Gas kiln and a Sodium carbonate cook kiln to Siemens S7-400 controllers + WinCC as HMI
· Job Description:
- Site surveys and Offer development
- Hardware engineering (control system panel layouts, local panel layouts, wiring diagrams…etc)
- Recreating control Logic from original projects documents
- On-site system installation and power-on of the controller system
- System switch over achieved in less than 24 hours (for each kiln)
Process Improvement
Project Management
Complex Problem-Solving
Team building
Attention to Detail
Multitasking Abilities
Teamwork and Collaboration
Decision-Making
Staff Development
Continuous improvements
Influencing Others
Motivating Teams
SEC Saudi Council of Engineers membership
SEC Saudi Council of Engineers membership