Accomplished Senior Mechanical Engineer excelling in leading complex projects from concept to completion, ensuring innovative and practical solutions. Enhanced manufacturing processes, reducing downtime and improving productivity, while fostering collaborative team environment. Highly skilled in problem-solving, streamlining operations, and implementing cost-saving measures to drive company growth.
● Construction of 500 MW battery energy storge system BESS, in charge of all mechanical, MEP & fire hdrant installation.
Riyadh Branch maintenance manager, in charge of all machinery & heavy equipment maintenance.
HDD department manager, in charge of HDD work, micro tunneling & pipe jacking for all electrical & mechanical infrastructural works.
Working for TAS – Talal Al-Shamere establishment (As a sub-contractor For GAMA Co.) in PP13 electrical power generation plant in Riyadh as, a mechanical construction engineer in charge of the construction of ACC buildings (Air Compressed Condenser)
Working for SISCO – Saudi Industrial & Technical Services Co. one of Al-Mutlaq group as a project’s coordinator.
IPP3 Gas Power Plant as a mechanical Engineer, In charge of construction and pre-commissioning for the three power houses.
in Jordan india Fertilizers project (JIFCO) located in Maan 4500 ton per day sulpharic & phosphoric acid plant 1500 ton per day PA.
installtion of all mechanical equbments in phosphoric acid plant & water treatment plant ducts, vessels, ducts, piping ( CS, SS, FRP, GRP), installtion of Rotarty Machines ( Ball Mill, Tellting pan Filter, ) & construction of wtaer, Desil & acid tanks & testing & commessioning.
Installtion of Pump room & fire hydrant network.
construction of Qatranah cement plant -5000 ton per day, installtion of all equibments, ducts, rotary machines, firehydrant netwrok including FM-200 fire suppersion system.