Summary
Overview
Work History
Education
Skills
Iqama
Selected Projects
Certification
Work Availability
Timeline
Generic
Mahmoud Shehata Abdallah

Mahmoud Shehata Abdallah

Technical architect
Riyadh

Summary

Accomplished architect with nearly two decades of experience overseeing technical management, project analysis, reviewing drawings, transmitting documents, and creating/updating trackers. Broad understanding of building materials, detailing, construction methods, engineering principles, and building regulations. Known for attention to detail, efficiency, organizational skills, self-motivation, exceptional communication abilities. Recognized for integrity, reliability, ethical approach, problem-solving, resourcefulness, and successful project delivery while managing multiple tasks effectively.

Overview

18
18
years of professional experience
5
5
years of post-secondary education
3
3
Languages
2
2
Certificates

Work History

Senior Technical Architect

Modern Building leaders - MBL
Riyadh, Riyadh Region
10.2021 - 05.2025
  • study project documents & prepare material breakdown for all discpilines
  • prepare progress tracker to present to owner & management on weekly basis
  • review all subcontractor transmittal before processing to consultant
  • make sure that all proposed material are complied with project specs
  • define transmittal problems and solve with consulants and subcontractors
  • propose alternatives for long lead items to avoid any project delay
  • make sure that all MIR are linked to the approved materials
  • tracking history of as built drawings & approved docs. In old project assisting handover
  • preparing as built drawings trackers and follow up with subcon. To finalize the remainings
  • define problems concerning as built drawings and solve them with consultant
  • study project tender drawings and presentations to find any missing data or discripincy
  • preparing construction details for architectural relations between items
  • revising shop drawings from sub contractor before processing to conultant
  • preparing RFIs with proposals or alternatives to consultant & owner
  • solving construction problems
  • preparing coordination drawings
  • prepare progress reports for engineering & construction to owner & higher management
  • revising quantities for final billing with subcontractor
  • prepare design rectifications as per client request
  • revising variation orders and get approval from consultant & cleint
  • preparing all documents for handover stage including O&M - T&C - as built -NCR

Senior Estimator

Pylons group SA
11.2019 - 10.2021
  • Study, pricing and preparing BOQ and planning cost for the project
  • Revising tender drawings and 3d shots to make sure that the drawings following the BOQ & specs and within planned cost
  • Revising and coordination between shop drawings and tender drawings in all disciplines to solve discrepancies
  • Material selection for all items to make sure the price within the budget and as per design
  • Quantity survey checking on regular basis with executed works at site to prepare VO & Identify main cause tolerate the deviance

Head of Technical Office

Lotus Resorts Est.
03.2009 - 10.2019
  • Study of project drawings and checking compliance with actual site conditions
  • Preparing BOQ and scope specification, pricing of all activities of the project
  • Preparing full proposal package and make meeting with clients to discuss all the requirements
  • Giving solutions and alternatives to the client to reduce cost without affecting the design

Projects Director

Lotus Resorts Est.
03.2009 - 01.2015
  • Making sure of drawings compliance with actual site conditions
  • Monitoring work phases step by step in all the projects
  • Make sure that ongoing works comply with engineering standards and specification
  • Quality inspection and assurance of each activity
  • Preparing IR and handover work to the client or consultant

Design Architect

Concept Architects
01.2007 - 01.2009
  • Prepare design idea and concept
  • Space study and zoning arrangements
  • Prepare design drawings
  • Preparing shop drawings
  • Preparing 3d render shots

Education

B.S.C - Architectural Engineering

Alexandria University
Egypt
09.2001 - 06.2006

Skills

Autocad

Iqama

Valid

Selected Projects

  • Confidential project , MBL - on going
  • VIA Riyadh, MBL - handed over
  • AJVA - FORD & Lincoln - Hayel, Lotus Resorts Est.
  • AJVA - FORD & Lincoln - Riyadh, Lotus Resorts Est.
  • Pit Stop - Al Hassa, Lotus Resorts Est.
  • Americana Warehouse - Madina Monawara, Lotus Resorts Est.
  • Americana Warehouse - Qaseem, Lotus Resorts Est.
  • TGI Fridays, Riyadh, Hayel, Madina, Yanbou, Lotus Resorts Est.
  • Crew Hotel, Concept Architects
  • P&G Head Office, Concept Architects
  • DOW Chemicals Head Office, Concept Architects
  • Bossini - La Senza - Terranova Stores, Concept Architects

Certification

PMP prep course

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

PMP prep course

01-2025

Senior Technical Architect

Modern Building leaders - MBL
10.2021 - 05.2025

Senior Estimator

Pylons group SA
11.2019 - 10.2021

6 Sigma yellow belt

07-2019

Head of Technical Office

Lotus Resorts Est.
03.2009 - 10.2019

Projects Director

Lotus Resorts Est.
03.2009 - 01.2015

Design Architect

Concept Architects
01.2007 - 01.2009

B.S.C - Architectural Engineering

Alexandria University
09.2001 - 06.2006
Mahmoud Shehata AbdallahTechnical architect