Experienced Project Control Engineer with a solid five-year track record in overseeing project budgets, schedules, and performance metrics. Skilled in implementing effective cost monitoring, risk assessment, and progress reporting systems. Adept at analyzing data to provide actionable insights for project optimization. Collaborative team player with excellent communication skills, ensuring seamless coordination between stakeholders. Proven ability to deliver projects on time and within budget while maintaining the highest quality standards.
• Reviewing the schedule and making sure it aligns with the budget.
• Drafting Project risk management plan and monitoring
• Identifying project risk and record them in risk register.
• Helping to lead and ensure the identification and assessment of all
risks, opportunities, trends, and changes within the programme,
including associated schedule and cost impact.
• Arranging meeting and brainstorming sessions for risk identification. • Continually monitor Project Risk and Change status to maintain
current forecast.
• Ensure all variances to the cost baseline are communicated in a timely manner.
• Drafting staffing plan for the project.
• Participate in meeting with Engineering department, Procurement
department, Construction department and HSE department for better
coordination in project.
• Draft Project control plans and cash flow plans.
• Monitor Schedule deviation and take steps to recover them.
• Making sure cost control plan is implemented and project remains
within allocated budget.
• Cash tracking and performance tracking of local content and
sustainability requirement of the project.
• Keeping track of contractual obligation and incentive regime.
• Monitor and report incentive regime status for the project.
• Monitoring and reporting of local content status for the project.
• Drafting local content plan and implement them by coordinating with
procurement and accounts team.
• Developing and agreeing with the client the preliminary project cash flow (finance schedule), cost control and reporting procedures.
• Establishing and agreeing with the client the form and the procedure
of cost estimation/calculation.
• Establishing an information control and information flow system for
the project and coordinating its implementation and adherence during
the project duration.
• Establishing and agreeing with the client procedures for review,
approval and transfer of design and engineering documentation
among the project participants.
• Monitor project sustainability status by coordinating with
sustainability manager and implement sustainability strategies along
with cost control.
• Take part in weekly client meeting and update client regarding site
progress and reason for discrepancies with baseline.
• Tracking and controlling any changes in the delivery program
including work scope/time and cost changes and advising the client by
using decision proposal.
• Review shop drawings, materials submittals, and bills of quantities for accuracy of calculations.
• Closely work with the project team to carry out all inspections subject to the daily form submitted by the contractor.
• Review the contractor payment and compare the percentages
submitted by the contractor with the actual on-site. Raise issues with
actual if any to the Contractor for action.
• Compare IFC with Tender drawing and raise major difference
impacting cost and time.
• Prepare resource plan according to IFC.
• Monitoring manpower requirements on a planned vs actual basis for
the sub-Contractor.
• Prepare cost and quantity estimate according to IFC and follow up
for billing assessment.
• Coordinate with procurement and design team to get cost for major
impacting items and make strategies to claim from employer.
• Prepare & develop project related correspondences (letters,
transmittals, etc).
• Control, monitor, analyse and report cost related aspects for
designated projects within a Portfolio.
• Contribute to lessons learnt process at project close out.
• Drafting and managing interface management plan.
• Maintaining active interface with client and internally within
organization.
• Working on development of schedule on Primavera P6.
• Time Impact Analysis for Variation Order.
• Incorporating the time impact of Variation Order on Primavera P6.
Got two Certificate of appreciation from Saudi Aramco
• Sketch-up software (ICAS- Manipal)
• Planning and scheduling using Primavera P6 (CISTOCADD Academy)
• Planning and scheduling professional (Udemy)
• Construction management (Udemy)
• Estimation & Quantity surveying Training (Udemy)