Preparation on work Schedule including installation all Panel (Switchgear Panel, MCC Panel, System Panel, Power Panel and Light Panel), all Tray Work, Conduit work, Power Cable Pulling, Cable Glanding, Termination and equipment utilization test equipment test date gathering Accordance to Plant Specifications. Arrangement of the material approval documents to the Client. Strict implementation of site safety on the job site. Supervision of Electrical/instrumentation work Such as grounding, Pipe layout, Cable Trench, Cable tray, Panel or Panel board Sifting and Mechanical in the to XFR (T) Sifting in charge of mechanical foundation, Equipment Sifting. Supervision activity from instrumentations and Electrical works. Drawing Reviewing Site implementation. MV Panel, LV Panel or System Panel. Fire Protection System Prepare work Schedule in Connection with other discipline