Summary
Overview
Work History
Education
References
Timeline
Generic

M Farrukh Khurshid Abbasi

Riyadh

Summary

Aim to work in a challenging work environment where I can utilize my expertise in technical skills, towards the development and implementation of the new ideas, contributing to growth of the organization. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

2
2
years of professional experience
17
17
years of post-secondary education

Work History

Site Engineer

ICAD
Riyadh
04.2022 - Current
  • Responsible for managing the installation, dismantling and replacement process of equipment and systems on-site.
  • Collaborate with project managers, design teams, and contractors to ensure the timely and efficient execution of installation activities.
  • Review electrical drawings, specifications, Method of statement and technical documentation to ensure compliance with project requirements and standards.
  • Supervise and provide technical guidance to the installation team.
  • Coordinate with external stakeholders and third-party subcontractor, for the electrical installation.
  • Perform inspections, testing, and commissioning of HV/MV systems to verify their proper functioning and compliance with design specifications.
  • To Follow up and ensure the Mechanical work carried out is as per approved shop drawing and within the time frame and progress of the approved construction program.
  • Accurate Quantity take off for mechanical services as per contract and site requirement.
  • To Follow up and ensure that the installation, inspection and testing of all the Mechanical services and work implemented meets the specification and the client requirements.
  • Verify the accuracy of shop drawings and their compliance to the specification, design, and existing local authority standard.
  • Responsibility to decide on day-to-day work that needs to be carried out by subordinates including Scheduling of activities, assigning task to groups or individuals, accuracy of work conducted, supplying resources, and dealing with operation issues and problems.
  • Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.
  • Liaise with local authorities for the approval of Mechanical services drawings and service connection.
  • Material coordination and close interaction with consultants for preparation of material submittal for approvals, preparation of working drawings and as built drawings.
  • Co-ordination with third party , client , project management team

Software Developer

Focus Software Solutions
01.17
  • Working on Asp.net, MVC, C#, Unit Tests, Web Api, MsSql server, ADO.Net, Entity Frame work

Dot Net Developer

Web Marks
01.15
  • Works on Live Server, Asp.net, MVC, C#, MsSql server, Live Chat Integration, Payment Gate way Integration, URL Masking, URL Cloaking, Query String (Encryption , Decryption)

System Admin Windows

PTCL
02.14
  • Works on Virtual Machines, Hyper V, DNS server, Microsoft Exchange server, Active Directory, Coordinated with internal stake holders, Presented Internship experience to higher management

Education

Bachelors in Computer Science -

Bahria University
01.2011 - 01.2015

Intermediate in Computer Science - undefined

Punjab College
01.2009 - 01.2011

S.S.C - undefined

Radiant School
01.1998 - 01.2009

References

More References will be provided on demand.

Timeline

Site Engineer

ICAD
04.2022 - Current

Bachelors in Computer Science -

Bahria University
01.2011 - 01.2015

Intermediate in Computer Science - undefined

Punjab College
01.2009 - 01.2011

S.S.C - undefined

Radiant School
01.1998 - 01.2009

Software Developer

Focus Software Solutions
01.17

Dot Net Developer

Web Marks
01.15

System Admin Windows

PTCL
02.14
M Farrukh Khurshid Abbasi