

Experienced in construction management with a strong focus on team leadership and collaboration. Demonstrates exceptional problem-solving abilities and technical expertise, driving successful project outcomes. Committed to leveraging skills to enhance operational efficiency and achieve strategic goals within the construction industry.
Project: Ceer Electric Vehicle Manufacturing Facility – King Abdullah Economic City (KAEC), KSA
Scope of Work:The project covers over one million square meters within KAEC’s Industrial Valley and includes major production facilities such as the body shop, paint shop, general assembly lines, logistics centers, waste‑management systems, and a dedicated vehicle test track.
AlMahdod Company participated as a subcontractor to MBL (Modern Building Leader), delivering a variety of essential civil and infrastructure works. The main scope of work included:
· Excavation and backfilling for all types of wet and dry utility structures, including concrete foundations and tanks.
· Construction of asphalt and concrete roads and yards, along with curbstone installation and interlock sidewalk tiles.
· Installation of internal welded mesh systems and a complete rainwater drainage network.