Summary
Overview
Work history
Education
Skills
Websites
Certification
LANGUAGES
KEY PROJECTS
PROFESSIONAL TRAINING
PERSONAL INFORMATIONS
Affiliations
Timeline
Generic
MOHAMED ALI FERJANI

MOHAMED ALI FERJANI

Al jubail,Saudi Arabia

Summary

A dynamic and flexible professional with expertise in project management, leadership, and risk management. Demonstrates a strong ability to manage projects from studying and planning through execution and assessment, ensuring compliance with Aramco standards and procedures. Skilled in gas turbine inspection, cost control, budgeting, and team leadership, fostering innovation while maintaining HSE compliance. Career goals include advancing in roles that leverage creative problem-solving and sociable interaction to drive organisational success.

Overview

9
9
years of professional experience
1
1
Certification

Work history

Studying and Scheduling Engineer

  • Engineer study and preparation of electrical transmission installation (MATAM and DAGANA electrical substations in SENEGAL)
  • Engineer of major inspection generator gas turbine (WASSIT GAS PLANT – APRIL 2021-GT2-KSA)
  • Engineer major inspection gas turbine SIEMENS (RAS AL KHIR SWCC – MARCH 2021-KSA)
  • Engineer combustor inspection gas turbine SIEMENS (RAS AL KHIR SWCC – MARCH 2021-UNIT1 AND UNIT 2-KSA)
  • Engineer combustor inspection of two gas turbines Mitsubishi 501F (WASSIT GAS PLANT GT1 AND GT2- DECEMBER 2020)
  • Engineer of a major inspection GAS turbine MITSUBISHI 501F (MANIFA GAS PLANT-OCTOBER 2020 – GT1)
  • Engineer study and preparation of electrical distribution power (OFFICE STEG-IS TUNISIA - EDC CAMEROON PROJECT- JULY2020)
  • BUSINESS DEVELOPMENT ENGINEER JANUARY2020 WITH BUSINESS DEVELOPMENT DEPARTMENT OF STEG INTERNATIONAL SERVICES
  • Engineer of a major inspection steam turbine MITSUBISHI 350 MW in JORF LASFAR MOROCCO.
  • (unit 2, TAQA MOROCCO- Sept-Oct 2019)

Project Manager

STEG IS TUNISIA & STEG IS KSA
2019.01 - 2026.04
  • Lead gas turbine inspection and maintenance projects (CI/TI/MI) for Saudi Aramco facilities
  • Manage project planning, scheduling, and execution phases
  • Coordinate manpower, subcontractors, and technical teams
  • Ensure compliance with Aramco safety and QA/QC standards
  • Control project costs and prepare variation/extra cost justifications
  • Interface directly with client representatives and stakeholders

Project Manager (Aramco & Mitsubishi Saudi Arabia)

STEG IS TUNISIA & STEG IS KSA
2022.11 - 2026.05
  • TURBINE inspection (TI) gas turbine (KHURSANYAH GAS PLANT ARAMCO – December 2025-GT2-KSA)
  • The restoration process of auxiliaries, generator, and turbine after a flame event (fire incident) in a GT3 gas turbine unit must follow a structured and safety-critical approach.
  • TURBINE INSPECTION OF 7 UNITS (WGP GT1 & WGP GT2 & KGP GT2 & BGP GT1 & BGP GT2 & WGP GT3 & WGP GT4) FROM JULY 2024 TO MAY 2025
  • MAJOR inspection (MI) gas turbine (Khursanyah GAS PLANT ARAMCO April-2024-GT3-KSA)
  • Combustor inspection (CI) gas turbine MITSUBISHI (Khursanyah GAS PLANT ARAMCO _ March 2024 GT1 _ KSA)
  • TURBINE inspection (TI) gas turbine (MANIFA OIL PLANT ARAMCO – December 2023-GT2-KSA)
  • MAJOR inspection (MI) gas turbine (BERRI GAS PLANT ARAMCO – October 2023-GT2-KSA)
  • Combustor inspection (CI) gas turbine MITSUBISHI (Berri GAS PLANT ARAMCO _ July 2023 _ KSA)
  • Combustor inspection gas turbine (Khursanyah GAS PLANT ARAMCO – MAY 2023-GT2-KSA)
  • TURBINE inspection (TI) gas turbine (MANIFA OIL PLANT ARAMCO – JANUARY 2023-GT1-KSA)
  • MAJOR inspection (MI) gas turbine (MANIFA OIL PLANT ARAMCO – November 2022-GT1-KSA)

Site Manager

2021.12 - 2022.11
  • Site manager major inspection gas turbine (BERRI GAS PLANT MARCH 2022-GT1-KSA)
  • Site engineer major inspection gas turbine (WASSIT GAS PLANT – FEBRUARY 2022-GT3-KSA)
  • Site engineer of combustor inspection gas turbine (BERRI GAS PLANT – JANUARY 2022-GT2-KSA)
  • Engineer of major inspection generator turbine Mitsubishi 501F (WASSIT GAS PLANT – DECEMBER 2021-GT1-KSA)

Maintenance Foreman of Utilities Service

NATILAIT
2018.01 - 2019.01
  • Control of the equipment of the water treatment station
  • Preparation of preventive maintenance schedule on boilers, air compressors and cooling units
  • Monitoring the work of equipment subcontractors
  • Preparation of visit reports and monitoring reports
  • Participation in corrective actions on utility equipment
  • Build a utility data base (materials, stock ...)

Maintenance Supervisor

CHAABANE COMPANY
2017.01 - 2018.01
  • Handling the tasks related to the service of research and development
  • Preparation of preventive action plans
  • Supervision of the work of the preventive team
  • Building technical data base on SOLUBAT SYSTEM MANAGING
  • Tracking of equipment under repair at dealerships
  • Manager of mechanical Park and after sales service (Doosan)
  • Manipulate the management of the stock of spare parts.
  • Supervise the tasks of the corrective maintenance team
  • Develop the Works Schedule

Education

Diploma of Electromechanical engineer - mechatronics specialty

Bachelor - Mathematic

Skills

  • CREATIVE & SERIOUS
  • SOCIABLE & INNOVATION
  • DYNAMIC & FLEXIBLE
  • PROJECT MANAGEMENT
  • LEADERSHIP
  • Project Management (Studying, Planning, Execution, Assessment)
  • Gas Turbine Inspection (CI, MI)
  • Aramco Standards & Procedures
  • Cost Control & Budgeting
  • Team Leadership & Directly Interface Coordination
  • Risk Management & HSE Compliance

Certification

  • MELCO APPRECIATION CERTIFICATE
  • FIRST AID CERTIFICATE FROM CICIL DEFENSE OF TUNISIA
  • ARAMCO APPRECIATION CERTIFICATE
  • COMPREHENSIVE SAFETY AND EMERGENCY PREPAREDNESS COURSE AWARENESS

LANGUAGES

ENGLISH
Native
FRENCH
Native
ITALIAN
Elementary
ARABIC
Native

KEY PROJECTS

  • KGP-GT3 Gas Turbine Restoration Project – Saudi Aramco (AFTER A FIRE INCIDENT ON AUXILIAIRIES PACKAGE), Multiple CI/TI/MI turbine inspections campaigns across KSA, UPGRADE THE FIRE FIGHTING SYSTEM OF STIR WITH LATEST NFPA STANDARDS
  • 2017 – end of studies Project (6 months), Project Leader UPGRADE FIRE FIGHTING SYSTEM OF STIR WITH LATEST NFPA STANDARDS, Identification of firefighting facilities and equipment., Decomposition into subsystems., Diagnosis of each subsystem against the corresponding NFPA standard., Determination of gaps., Development of an action plan for compliance., Study of the solutions proposed in the action plan., APPLICATION & EXECUTION & TESTING., 2016 – end of year project in English (ESPRIT): ACADEMIC PROJECT, SMART HOME: model of a house made of PVC material with two doors automatically controlled, BY RFID card and a BLUETOOTH module with a report and presentation in English language., 2015 – Project 2 (ESPRIT): ACADEMIC PROJECT, Design and construction of the hull and chassis of a hybrid car., 2014 – Project 1 (ESPRIT): ACADEMIC PROJECT, Line follower robot controlled with the ARDUINO UNO board

PROFESSIONAL TRAINING

  • 2014 (PLC, SolidWorks, Catia)
  • 2016 (Photovoltaic Energy): SIZING of photovoltaic installations

PERSONAL INFORMATIONS

  • Born in 27/MAY/1993
  • Driving license since 2012
  • Married since 2021

Affiliations

  • body building - football

Timeline

Project Manager (Aramco & Mitsubishi Saudi Arabia)

STEG IS TUNISIA & STEG IS KSA
2022.11 - 2026.05

Site Manager

2021.12 - 2022.11

Project Manager

STEG IS TUNISIA & STEG IS KSA
2019.01 - 2026.04

Maintenance Foreman of Utilities Service

NATILAIT
2018.01 - 2019.01

Maintenance Supervisor

CHAABANE COMPANY
2017.01 - 2018.01

Studying and Scheduling Engineer

Bachelor - Mathematic

Diploma of Electromechanical engineer - mechatronics specialty

MOHAMED ALI FERJANI