During tender phase
Reviewing all tender technical documents, preparing technical clarifications & visiting the site (if needed).
Preparing piping design, equipment sizing, tanks sizing, equipment list, valves list & piping MTO.
Preparing preliminary P&ID drawings, civil & piping layout & basic civil drawings.
Prepare the technical and the financial proposal offer according to the tender and client requirements.
Prepare the tender costing sheet.
Communicate with suppliers and sub-contractors to get the best technical and commercial offers.
Finalizing and submitting the technical and commercial offer to the client
Preparing the prequalification file
After Project Reward
Preparing all engineering documents including plant hydraulic design, piping design, equipment sizing, tanks sizing, material selection, valves list, line list, equipment list, piping MTO, equipment specifications (RFQs).
Technical evaluation all received quotations from suppliers to choose the optimum equipment.
Issuing all equipment data sheets & attending any technical discussions with the client.
Reviewing P&ID drawings, Preparing civil & piping layout, basic civil drawings & fabrication drawings, and ventilation calculations.
Then revising all construction drawings prepared by the civil contractor after the preparing all mechanical general arrangement drawings.
Attending required FAT tests
Design, build and operation of the sewerage treatment plant for Riyadh, sedra site. Capacity 60,000 m3/day Wastewater treatment plant (MBR & MNR) 60,000 m3/day Saudi Arabia
Projects that I have worked in:-
Tendering Phase
No Project Name Type Capacity Location Project Value
01 Upgrading Kafr Mowies WWTP From 1,500 m³/day to 3,000 m³/day (Awarded) Wastewater treatment plant (RBC to SBR) From 1,500 m³/day To 3,000 m³/day Egypt 29,704,727
EGP
02 Supply, Installation and commissioning of Iron and Manganese removal unit Water treatment plant of Gamgara FE & MN
removal 5,000 m3/day Egypt 32,100,726
EGP
03 Design, Engineering, Procurement & Construction, Supply, Installation of Water Treatment Plant 12,000 m3/Day, Meet El Attar Village Al Qalyubia Governorate (Awarded) Water treatment plant 12,000
m3/day Egypt 103,591,112
EGP
04 Mobile water treatment for Kirundu area, Burundi Water treatment plant 1,200 m3/day Burundi 8,178,242 USD
05 Supply, installation, and commissioning of wastewater treatment plant, ETAB village, North coast, MARAKEZ developer Wastewater treatment plant 200 m3/day Egypt 1,509,141 USD
06 Supply, Installation and Hydro Test of Water Treatment Plant, Networks Eastern Region – Kwahu-Tafo, Ghana (Awarded) Water treatment plant 20,000
m3/day Ghana 72,226,400
USD
07 Juba Urban Water supply & Development Phase (1) one For Design, Engineering, Procurement & Construction, Supply, Installation of Water Treatment Plant 40,000 m3/Day And Water Distribution System.
Juba, South Sudan Water treatment plant 40,000
m3/day extended to 160,000
m3/day South Sudan 78,220,250
USD
Engineering Phase
No Project Name Type Capacity Location
01 Design, Engineering, Procurement & Construction, Supply, Installation of Water Treatment Plant 12,000 m3/Day, Meet El Attar Village ,Al Qalyubia Governorate Water treatment plant 12,000 m3/day Egypt
02 Bahnai waste water treatment plant, El Momoufia Governorate Wastewater treatment 11,400 m3/day
extended to 17,100 Egypt
03 Houd neigh waste water treatment plant, Al Sharkia Governorate Wastewater treatment 6,000 m3/day Egypt
04 Urgent solution works to feed the 2600 acres and district 14 areas with potable water from the works of a ground storage tank with a capacity of 10,000 cubic meters, feeding lines and electromechanical works – New Obour City Pumping station Egypt
Projects that I have worked in:-
Engineering Phase
No Project Name Type Capacity Location
01 Hydraulic design & calculations for STP Plants 10,000 m3/day extension to 15,000 m3/day (5MLD Kruger Expansion-8 Plants Contract). Hydraulic design & calculations for STP Plants 10,000 m3/day extension to 15,000 m3/day Egypt
02 El-Nouran Sugar-BFW 150 m3/hr (Dyna-Sand Filters & RO & Demin Stations). Industrial water treatment 150 m3/h Egypt
03 SOUTH HELWAN SUPERCRITICAL
POWER PLANT 3 X650 MW (Water & Wastewater Treatment Packages). Industrial & Water, Wastewater treatment Power station: 3 X650 MW Egypt
04 CAIRO WEST SUPERCRITICAL POWER
STATION 1X650 MW (Water & Wastewater Treatment Packages). Industrial & Water, Wastewater treatment Power station: 1 X650 MW Egypt
05 ASSIUT SUPERCRITICAL POWER PLANT 1X650 MW STEAM POWER STATION
(Water & Wastewater Treatment Packages). Industrial & Water, Wastewater treatment Power station: 1 X650 MW Egypt
06 Nabrouh Water Treatment Plant ( 400 LPS ) Water treatment 400 LPS Egypt
07 Bertebat Waste water treatment plant (20,000 m3/day) Wastewater treatment 20,000 m3/day Egypt
Tendering Phase
No Project Name Type Capacity Location
01 CAIRO WEST SUPERCRITICAL POWER
STATION 1X650 MW (Water & Wastewater Treatment Packages). Industrial & Water, Wastewater treatment Power station: 1 X650 MW Egypt
02 ASSIUT SUPERCRITICAL POWER PLANT 1X650 MW STEAM POWER STATION (Water
& Wastewater Treatment Packages). Industrial & Water, Wastewater treatment Power station: 1 X650 MW Egypt
Job Description:
Analyze the tender documents.
Participate in pre‐bid plant surveys and meetings to acquire the required knowledge of the Project.
Prepare a brief presentation of each new project.
Prepare the technical clarification.
Request for Quotation (RFQ) from vendors.
Negotiate with suppliers to achieve suitable technical & commercial offer.
Comparison Studies based on suppliers Quotations.
Preparation of Proposal Costing.
Preparation of commercial & technical offers.
Example for My Proposals
No Project Name Type Location
01 Al Shabab Power Project Phase II Converting Existing Simple Cycle To Combined Cycle (Mechanical Equipment / Pipe Installation) CP-118 Industrial & Water, Wastewater treatment Egypt
Projects that I have worked in: -
No Project Name Type Capacity Location
01 El Fayrouz plaza Marsa Alam Sewage Treatment Plant (500 m3/day). Sewage Treatment 500 m3/day Egypt
02 Youth Housing Of Hurghada Sewage Treatment Plant (300 m3/day). Wastewater treatment 300 m3/day Egypt
03 ARRIS Sewage Treatment Plant (9,400 m3/day) (ALGERIA). Sewage Treatment 9,400
m3/day ALGERIA
04 SIDI AISH Sewage Treatment Plant 10,400 m3/day (ALGERIA). Sewage Treatment 10,400 m3/day ALGERIA
05 OUM EL BOUAGHI Sewage Treatment Plant 20,000 m3/d (ALGERIA). Sewage Treatment 20,000 m3/d ALGERIA
06 Safi Water Treatment Plant 55,000 m3/d (MOROCO) Water Treatment Plant 55,000 m3/d MOROCO
07 Nadoor Water Treatment Plant 43,200 m3/d (MOROCO). Water Treatment Plant 43,200 m3/d MOROCO
08 Khouribga Water Treatment Plant 138240 m3/d (MOROCO). Water Treatment Plant 138,240
m3/d MOROCO
09 CLEOPATRA - MARSA MATROUH Seawater
Reverse Osmosis (2X1500m3/d). Seawater Reverse Osmosis 2X1500m3/d Egypt
10 BARRANI Seawater Reverse Osmosis (2X1500m3/d). Seawater Reverse Osmosis 2X1500m3/d Egypt
Job Description:
Pipelines Water Hammering System Design and its protection methods.
Mechanical design of Water and Wastewater pumping stations including Civil outlines, General Arrangement, Piping & Instrumentation Diagram and Bill of Quantities.
Projects that I have worked in:-
El Shorfa Pump Station.
Project North Coast Boosters Alamen Boosters.
Project North Coast Boosters Al Hammam Boosters.
Project North Coast Boosters Sidi Abd El Rahman Boosters.
Forest tree of Bani Soueif.
I am Seeking a technical / proposals/ business development job opportunity in the Field of (Water and wastewater treatment Field) where my academic background, Master of business administration, trainings, relevant work experiences and interpersonal skills can be applied & fully developed positively to Influence Company’s operation, performance, and profitability.
Also, I am attending initiative of BEING AN AMBASSADOR under the title "Ambassadors of Sustainable Development." Under the supervision of Ministry of Planning and Economic Development (the National Institute for Governance and Sustainable Development), Egypt.
My Targets are:
1. fulfilling with new experiences and values that can help me in my personal evolution, a path that can lead to another level of me and enrich my life.
2. To make use of my interpersonal skills to achieve goals of a company that focuses on customer satisfaction and customer experience
Additionally, I am committed to ongoing professional development and collaboration with cross-functional teams to stay up to date with emerging technologies and industry trends.
Reading as a hobby offers a wealth of benefits, both tangible and intangible, making it an incredibly valuable pastime. Here are some key reasons why:
Boosts knowledge and understanding: Whether you delve into fiction or non-fiction, reading exposes you to new ideas, perspectives, and information. You can learn about anything imaginable, from historical events to cutting-edge scientific discoveries, broadening your horizons and deepening your understanding of the world.
Enhances cognitive skills: Reading is a mental workout that keeps your brain sharp. It improves memory, concentration, critical thinking, and problem-solving abilities. As you engage with texts, you make connections between ideas, analyze information, and draw conclusions, strengthening your intellectual muscles.
Improves language skills: Reading exposes you to diverse vocabulary and grammar structures, naturally expanding your own linguistic repertoire. You'll acquire new words, refine your writing skills, and develop a strong grasp of language rules, enhancing your communication skills in both written and spoken forms.
Sparks creativity and imagination: Fiction, in particular, transports you to different worlds and invites you to step into the shoes of others. This fuels your imagination, stimulates creativity, and encourages you to think outside the box. As you envision scenes and characters, you're essentially co-creating the story, which expands your creative horizons.
Promotes empathy and understanding: Reading about diverse characters and experiences fosters empathy and compassion. You gain insights into different cultures, perspectives, and ways of life, allowing you to connect with others on a deeper level and appreciate the richness of human experience.
Reduces stress and provides relaxation: Curling up with a good book can be a wonderful escape from the pressures of daily life. Reading allows you to unwind, de-stress, and immerse yourself in another world, offering a much-needed mental break and promoting emotional well-being.
Lifelong learning and personal growth: Reading is a lifelong journey of discovery and self-improvement. It fuels your intellectual curiosity, ignites your passions, and opens doors to new possibilities. It's an investment in your personal growth, offering invaluable benefits that reach far beyond the pages of a book.
Overall, For me reading as a hobby is an enriching and rewarding experience that can positively impact my life in countless ways.