More than 16 years of hands-on experience highly skilled in industrial/oil & gas inspection and quality control of welding, TPI, NDT, Vendor inspection, vendor assessment, auditing, technical recruiting and preparing technical proposals. TPI, Welding inspection, Coating inspection, Auditing, QA/QC, Vendor assessment, OCTG/ drilling tools inspection, Lifting equipment inspection Line pipes, valves & structural steel.
Inspections and evaluations
Aramco Approval Ref: SAP# 80000876
ADMA approval – TPI (Approval for project)
Saudi Electric Co. approval– for (Overhead Cranes & structural steel)
SWCC approval for Line pipe manufacturing.
QMS Auditor/lead auditor course- online course
Project: Manufacturers and contractors assessment as per ISO 9001
Client: SABIC - National Water Company NWC.
Vendor: various vendors within Saudi Arabia
Position: Assessor
Scope of work:
· Assessment of vendor’s system as per iso 9001: 2015
· Evaluating the capability of vendors acc. to client’s approved check list.
Project: Witness manufacturing of 4” 1500 psi RTP pipes
Client: OMAN OIL
Vendor: NOV FIBERGLASS
Position: TPI
Scope of work:
· Witness manufacturing stages (extrusion – composite - jacketing)
· Witness hydrotest
· Witness lab tests (DSC testing – burst test – ring crush test)
· Visual and dimensional inspection
Project: Line Pipes manufacturing for Water Transmission System project
Client: SSEM - SWCC
Vendor: WELSPUN
Position: TPI
Scope of work:
· Attending fit up, final visual inspection during fabrication.
· Inspection of Fabrication, welding, (NDT);
· Witnessing non-destructive examinations;
· Witnessing of hydro test, vacuum test air test, chalk test and load test;
· Witnessing of ultrasonic test, liquid penetrant test and magnetic particle test on primary and special areas;
· Authentication of inspection, progress and testing reports;
· Ensuring compliance with QA standards and procedures.
Project: Line Pipes for Water Transmission System (July 2019 – Apr.2020)
Client: Saline Water Conversion Corporation (SWCC)
Vendor: Group Five Pipe Saudi Manufacturing
Position: TPI
Scope of work:
· Attending fit up, final visual inspection during fabrication.
· Inspection of Fabrication, welding, (NDT);
· Witnessing non-destructive examinations;
· Witnessing of hydro test, vacuum test air test, chalk test and load test;
· Witnessing of ultrasonic test, liquid penetrant test and magnetic particle test on primary and special areas;
· Authentication of inspection, progress and testing reports;
· Ensuring compliance with QA standards and procedures.
Project: Steel Structure (Sakaka Solar Plant)- Nov. 2018 to June 2019
Client: NEXTracker / Mahindra
Vendor: Al Yamamah Solar systems Manufacturing.
Position: TPI
Scope of work:
· Cutting and fit up inspection / release beams for drilling.
· Dimensional inspection and sizes verification.
· Final release of beams for galvanizing.
· Galvanizing inspection.
· Packing and release for shipping inspection.
· Reports review for all applicable inspection stages.
· Issuance of IRC and final documents review.
Project: New construction of Tanks.
Client: ADMA -OPCO
Vendor: CBI manufacturing co.
Position: TPI
Scope of work:
· Verifying WPS and welders Qualification
· Verifying NDE , PWHT and painting procedures
· Witness of fit-up and welding of bottom and floating roof components.
· Witness of leak test
· Visual inspection for shell plates bevels prior to welding.
· Visual and dimensional inspection for nozzle/manhole installation.
· Review for NDE reports
· Visual inspection for all completed welds
Project: Storage spheres - Witnessing and Supervision of Inspection, Examination and Testing of process manufacturing of storage spheres (ORPIC/LIWA plastic project) .
Client: ORPIC.
Vendor: CBI manufacturing co.
Scope of work:
· Material receiving inspection
· Verifying WPS and welders qualification
· Verifying NDE , PWHT and painting procedures
· Visual inspection for shell plates bevels prior to welding.
· Visual and dimensional inspection
· Review for NDE reports
· Visual inspection for all completed welds
Project: Steel Structure (Dhahran Residential community expansion- ARAMCO)-
Client: ARAMCO
Vendor : Cleveland
Position: TPI
Scope of work:
· Storage and handling surveillance inspection of material.
· Cutting and fit up inspection / release for welding.
· Welding inspection of trusses Assembly.
· Dimensional inspection and sizes verification.
· Final release of trusses Assembly for galvanizing.
· Galvanizing inspection.
· Packing and release for shipping inspection.
· Reports review for all applicable inspection stages.
· Issuance of IRC and final documents review.
Project: Valves (Witnessing and Supervision of Inspection, Examination and Testing of process Valves Qualification for ARAMCO). 2016-2017
Client: Pan Gulf Valves
Vendor : Pan Gulf Valves
Scope of work:
· Review of supplier material test report
· Review supplier NDT reports
· Witness of PGV Receiving inspection
· Witness of PGV chemical & Mechanical testing
· Witness of PGV NDT inspection
· Witness of In process Inspection
· Witness of welding process
· Witness of NDT inspection
· Witness of Assembly process
· Witness of Hydro testing process
· Witness of painting inspection
· Witness of Fugitive emission test
· Witness of Fire safe test
· Witness of final inspection As per API 591 check lists
Project: Coating inspection for Pipes and Fittings (Yanbu Medina Water Transmission System- SWCC)-2016
Client: Sinopec international petroleum service
Vendor: Arabian Pipe Coating (APCO).
Scope of work:
· Raw material inspection:
· Fittings receiving inspection:
· Surface preparation inspection.
· Coating application witness and coating inspection of the pipes.
· Review Calibration stickers and certificates for inspection equipment.
· Fittings Identification and marking of the all fittings.
Project: Steel Structure (Yanbu Madinah Water Transmission System- SWCC)-2016
Client: SINOPEC INTERNATIONAL PETROLEUM SERVICE
Vendor: Zamil Steel.
Scope of work:
· Review of WPS/PQR/WQTR/NDT Procedures/Welding consumables.
· Review of MTC.
· Monitoring of Dimensional inspection & Visual Inspection for material preparation.
· Witnessing at random the fabrication and fit up components.
· Verifying the actual welding parameters & welders’ qualifications.
· Witnessing at random the visual inspection of primary/secondary members & Ultrasonic test for welds
· Witnessing at random the paint material, surface cleaning, paint DFT & WFT, visual inspection of coat and touch up repair.
· Hold of pre-shipment inspection, review of packing inspection and final inspection dossiers before submittal to client
Project : Pipes, GRE Pipes, Pumps (Royal Commission Project)
Client: Saudi Services for Electro-Mechanical Works
Vendors : Future pipe – Suhaimi Pumps – Globe tech – Pan Gulf Valves- Amiantit – Raymond SA.
Position : Vendor Inspector
Scope of work:
· Painting and final Coating inspection
· GRP / GRE Pipes final inspection
· Pump’s inspection (Visual, Dimension and Performance test).
· Internal cement mortar lining inspection.
Project : Overhead Cranes (Conversion of Hail – Saudi Electric Company)
Client : Al-Toukhi.
Vendor : Saudi Cranes
Position : Vendor Inspector
Scope of work:
· Witness of OHC (Overhead Crane). testing
· Visual and Function test for OHC and Chain blocks.
· SWL and proof load test.
· Witness Deflection test.
· Documents review
Project : Submerged Arc Welded helical Pipes for Water Transmission System -2016
Client: Saline Water Conversion Corporation (SWCC)
Vendor : Group Five Pipe Saudi Manufacturing.
Scope of work:
· Raw material inspection
· Witness Manufacturing Procedure Qualification Tests (MPQT) .
· Witness Mechanical Testing & Chemical analysis
· Monitoring welding process
· Witness of WPS/PQR/WPQ
· Witness of visual insp., Hydrotest and NDT
· Witness and approval for weld repair areas.
· Documents review.
Project: Surge Vessels (Yanbu Madina Water Transmission System- SWCC)-2015
Client : SINOPEC INTERNATIONAL PETROLEUM SERVICE
Vendor: Zamil Steel PED.
Scope of work:
· Fit-up alignment check
· Tack welds visual inspection
· Shell welding-Verify shell barrel shape after re-rolling
· Visual Inspection of welds
· Witness Final dimension inspecting.
· Witness for Hydro test.
· Painting and final Coating inspection
· Identification and marking.
Project: Steel Structure – new construction for Al Qaryan Mini Steel Plant.
Client: Al Qaryan Steel Co. -2014
Scope of work:
· Conduct inspection and monitoring of the steel structure erection work.
· Review of fabricator quality control documentation and insure it comply with AWS D1.1 requirements and Company specification.
· Verify the fabricated material as per the international code and company specification.
· Verify the condition of paint as per the specification.
· Inspection of the connection of the steel structure and the anchor bolts.
· Ensure that erection work compliance with the drawings and specification.
· Documents and drawing review.
· Inspection of structure as per the company specification and international codes.
· Inspection / witness erection of structure.
· Witness of verticality and alignment of the structure.
· Inspection of cladding, roof, ladders, rails etc.
· Welding inspection and NDT Examination of the weld joint.