Summary
Overview
Work History
Education
Skills
sections.external_links.name
Certification
Languages
summer Internship
Personal Information
Timeline
Generic
Mohamed Kabil (PMP®)

Mohamed Kabil (PMP®)

Riyadh,Saudi Arabia

Summary

•Experienced ,analytical and hardworking Elect. Engineer with years of
experience in Transmission & distribution Turnkey Substations Project Management, Engineering, Construction driven execution, Testing & commissioning inside Egypt and gulf region proven the ability to manage and complete project tasks on highest standard .

Overview

5
5
years of professional experience
5
5
years of post-secondary education
1
1
Certification

Work History

Project engineer

Alsharif Group
Riyadh, Saudi Arabia
10.2023 - Current

ALARIDH 2: 132/13.8KV Substation -Saudi Arabia.
Clients: National Grid - SEC - NG


  • Prepare, schedule, manage, and oversee the delivery of key assigned projects.
  • Review of Tender documents, Scope of work, tender drawings, BOQ, standard and specifications.
  • Review Technical offer for all major equipment’s from various supplier and generated reports for any deviations.
  • Design review and submission of substation equipment base & detail design.
  • Reviewed designs, plans and reports to ensure constant compliance with project specifications.
  • Control of the quality and technical correctness of the installation in accordance with quality management plan and company technical standards.
  • Design coordination- effectively handle the communication between Designer / Consultant and the construction team, ensuring each party understands and implements the requirements as per SOW
  • Design Coordination & review meetings with Client & vendors to expedite review progress and there solution of any technical/contractual issues.
  • Ensure all materials are delivered to the construction site in compliance with the contract requirements and the approved drawings from client.
  • Review and submission of project baseline level-2 & level-3 schedule to client for project’s progress monitoring & tracking with Critical paths & Work breakdown structures keeping in view contractual milestones.
  • Produced project progress reports for stakeholder reviews and meetings.
  • Presented project updates to stakeholders, highlighting successes and suggesting solutions for weak spots.
  • Prepare Progress Invoices.

Service Engineer

Sieyuan Electric CO., Ltd
11.2021 - 09.2023

Mutla 12 S/S 132/11 KV GIS -Kuwait

SASC 9 S/S 132 /11 KV GIS-Kuwait

SASC S/S 400/132/11 KV GIS-Kuwait

Tochka 3&4 S/S 220/66 KV GIS-Egypt

Tochka 3 S/S 220/66 KV GIS.-Egypt


  • Perform field service operations that present Usual or unusual problems and need technical skills
  • Guide the project site GIS&AIS installation and Commissioning, Ensure the product can be charged smoothly
  • Supervise electricians or contractors hired by Company or supplied by contractor
  • Perform and document all tests work for all component in site
  • Handling all SF6 gas operation
  • Conduct inspections to determine necessary maintenance and assist in determining resources
  • Assist in planning and coordinating Middle East team Efforts
  • Maintain detailed record and Log
  • Participate on meetings with client and owners in project site.

Site project manager

Madkour Group
Cairo, Egypt
01.2021 - 10.2021

Wade El Natron Solar cell 5.4 MW.

Ring Road lighting high must.


  • Develop site works execution plan in coordination with the project manager and other stakeholders, including inputs for time schedule, resources requirements & management, site mobilisation, work method statements and overall site planning in accordance with required standard of HSE, quality and specification.
  • Ensure to provide all required technical support to construction site staff for the installation/erection of equipment by providing approved drawings & layouts.
  • Ensure systems are tested in accordance with specifications and approved inspections and test plans by providing testing & commissioning team all necessary support.
  • Handle overall site management, secure material storage, equipment in coordination with internal resources, assigned subcontractors, suppliers, vendors, client, consultant and other internal &external stakeholders
  • Ensure that all document, drawing are modified and updated in accordance with the established process and as per document management system
  • Coordinate with site team to ensure the perpetration availability and handing over all RFIs, MIRs, test report and correct redline markup drawings, document for AS built
  • Delegate the project tasks to the team members based on individual strength, competencies, skill sets and experience level
  • Identify and report project/site hazard/risks, develop and implement risk management plan
  • Build and enhance effective relationship with customer, supplier, vendors and site team, conduct and participate in stakeholders' meetings and communicate the outcomes to the concern.

Construction manager

Madkour Group
Cairo
06.2020 - 01.2021

Mohamed Naguib Military Base S/S 66/22 KV GIS.


  • Oversaw all day-to-day site operations.
  • Supervised work of contractors and subcontractors to achieve targets against deadlines.
  • Managed site instructions, daily diary, record sheets and other forms of site reporting.
  • Select, monitor, follow and coach construction team.
  • Delivered contracted construction work according to time, quality and cost estimates.
  • Ensure the availability of construction resources (material, drawing, subcontractor).
  • Reviewed plans and specifications during schematic design of pre-construction to identify potential risks, technical constraints and code issues.
  • Led site teams to deliver timely, under-budget project completion.

Electrical Site Engineer

EPIC technology co.
Cairo
04.2019 - 06.2020

Hurghada &North Hurghada S/S 220/66/11 KV GIS.


  • Supervised technicians in installing and maintaining MV, LV, and HV systems, overseeing safety and operational efficiency.
  • Developed methodologies for installing temporary and permanent electrical equipment in compliance with safety standards.
  • Kept and updated records on all electrical design changes.
  • Prepared and modified drawings, specs, calculations and graphs for complex electrical designs.
  • Supported quality standards by verifying premium quality of on-site construction materials.
  • Used advanced AutoCAD skills to develop single line diagrams for electrical power distribution networks.

Education

Bachelor of Electrical Engineering - Electric power and machines

Menoufia University
Egypt
06.2012 - 06.2017

Skills

  • Professional user for Auto Cad,, MS Office, MS Project
  • Strong analytical, organisation, prioritisation, and time
    management skills
  • Project Management
  • Strong teamwork and Problem-
    Solving skills
  • Strong verbal and written
    communication skills
  • Compliance monitoring

Certification


  • Project Management Professional (PMP)
  • 30 Hours General Industry Standards (OSHA)
  • National Grid safety rules
  • OHS General Induction
  • LOTO
  • Risk Assessment
  • Permit issuer (PTW)
  • First Aid & CRP

Languages

Arabic
Native
English
Advanced

summer Internship

  • Trainee, Armed Force, Shebin el kom military hospital, Banha Shobra el Hor street, Summer 2016
  • Trainee, Egyptian electricity transmission company EETC, Sadat City, Summer 2015
  • Trainee, Egyptian electricity transmission company EETC electrical, Ezz steel CO & Arco steel co, Sadat City, Summer 2014

Personal Information

  • Date of birth: 04/09/1994
  • Marital status: Single

Timeline

Project engineer

Alsharif Group
10.2023 - Current

Service Engineer

Sieyuan Electric CO., Ltd
11.2021 - 09.2023

Site project manager

Madkour Group
01.2021 - 10.2021

Construction manager

Madkour Group
06.2020 - 01.2021

Electrical Site Engineer

EPIC technology co.
04.2019 - 06.2020

Bachelor of Electrical Engineering - Electric power and machines

Menoufia University
06.2012 - 06.2017
Mohamed Kabil (PMP®)