Primavera
Competent professional, offering More than 14 years of rich experience in Managing , planning, execution, and delivery of complex MEP works in construction projects.
• Experience Fields:
. Infrastructure projects , Piping Engineering ,HVAC systems,Fire Fighting Systems ,District cooling plants,Steel Tanks,Pumping Stations, water treatment plants.
Electric systems installation such as: Power systems, Unit substations, lighting systems (Internal & External), Fire Alarm system, Low current system, CCTV system, Security& access control systems & BMS.
MEMBERSHIPS :
• Saudi Council of Engineers _ Membership No.# 43588.
• Egyptian Engineers Association _ Membership No.# 60/05833.
• Project Management Institute”PMI”- Membership No.# 84372908437290
Brief Description of Responsibilities:-
• Adept to prepare comprehensive schedules for specific jobs, activities, tasks, & requirements at each project stage.
• Ensure execution of the Mechanical activities is carried out in stages within a reasonable time as per the approved project plan.
• Coordinate & arrange timely allocation of the mechanical labor, tools, equipment, machinery, material, finance & other resources.
• Materials take off from the approved shop drawings and issuing the materials purchasing requests
• Provides expert advice on engineering drawings, material and equipment selection, cost estimates, etc.
• Leading, managing, and Motivate a team of mechanical/piping engineers, draft men, foremen
• Control & supervise all phases of development for execution completion & project closeout.
• Guide department to identify, pre-select companies with ability & experience in providing the related services.
• Inspection for all the purchased items during delivery from suppliers as per Manufacturing Slandered, Materials approval, project specification, and international related codes.
• Issuing the method of statements for the installation of the mechanical systems in accordance with the Manufacturer's Recommendations, project specifications,s, and international related codes.
• Monitor sub-contractor compliance with quality, time, and budget parameters for the project • Steer variation orders approval by concerned entities before execution
• Responsible to ensure safe construction/ execution practices in the storage and movement of tools, equipment, and material, adoption of safe work practices, the implementation of safety policy.
• Arranging information, reports, documents, and clarification for Client/ Consultant.
• Liaise for inspections & approvals from local municipality, authorities, Civil Defense,
• Key Project: 1- JEDDAH ECONOMIC CITY PROJECT – JEDDAH - KSA (Jul.2018 : Dec.2020)
Project budget :(580,000,000 S.R) for 1st phase infrastructure of Kingdom Tower in Jeddah.
Scope :-
➢ Underground pre-insulated chilled water network with a total length of 31,200 meters of pre-insulated ASTM A 53, API 5L Carbon steel pipes, Diameters was from 2" up to 48”& wall thickness up to 15.87mm.
➢ Installation of Isolation valve chambers (butterfly, gate, and ball valves), Drain valve chambers, and Air release valves chambers.
➢ Underground water and irrigation Pipelines (HDPE)pipes dia. Up to 600 mm. with their Pump stations, valves, strainers, screen filters, Flowmeters, Gauges, Dismantling joints, Cranes, etc
➢ Underground Sewage & Storm Pipelines (GRP, PVC & Ductile iron pipes ) with their Lift stations. 2- MADINAH HAJJ CITY PROJECT-INFRASTRUCTURE PACKAGE (Sep.2014 : Jun.2018)
Project Budget: 7,500,000,000 SAR
Project Scope:
The project is located 3.00 Km from “prophet’s Mosque” in Madinah Al Munawarah it consists of the following.
High rise buildings: Eight OFFICES BUILDINGES AND HOTELS with 500,000 m2 built up area. infrastructure for 104
towers with total area (1,690,630.5 m2).
*Site Infrastructure works including:
- Underground Pipelines Network (Chilled, Domestic, Fire, Irrigation, Sewer, Treated gray water networks)
And Installation of 21 Fountain Pump Rooms and 2 underground water tanks.
* 2 District Cooling Plants : (Total Capacity: 200,000 Refrigeration Ton)
Each Plant consist of a 100,000 RT / (20x5000) Centrifugal water chiller, 20 Counter-flow induced draft Cooling Towers, 20 Counter-flow induced draft Cooling Towers, 42 chilled and condenser Water Pumps,
Air Handling Units, Fan Coil Units, 46 Plate Heat Exchanger, and BMS &SCADA control systems.
* Steel Thermal Energy storage tanks : Total 6 Nos. of steel tanks with total capacity of 60,000 square meters.
* Water mist fire fighting system, ventilation, and drainage system for the electrical tunnel.
3- KING FAISAL UNIVERSITY STAFF HOUSING PROJECT (Jun.2013 : Aug.2014)
Project budget (1,100,000,000 S.R).
It Consist of the following:
931,350 M2 of Development Area. 388 Typical Villas – 5 Vice Rectors Villas and One Type Villa for Rector – 28 Apartment Buildings,2 shopping Center , Two Mosques &All infrastructure work in the site (underground Networks – hardscape – landscape …. ext.).
Project :
1- Execution of Oil pipelines (2” to 12”) between production wells and oil Process Plant - EGYPT
2- Execution of Gas pipelines (2”to12”) between production wells and Gas Plant - EGYPT
3- Execution of OIL&GAS Manifold Stations (4” t0 30”) - EGYPT
Project Management Professional PMP ®️
undefinedKNOWLEDGE PURVIEW:
INTERNATIONAL CERTIFICATES
SOFTWARES:
Primavera
Microsoft Project
CAD
POWER POINT
EXCEL
PMI- Project Management Professional (PMP)®_ (PMP® Number: 3375992)
PMI- Project Management Professional (PMP)®_ (PMP® Number: 3375992)