Summary

A seasoned bridge Project Manager implementing and developing successfully plans. Passionate and results focused, I have over 15 years experience with the last 3 working as a Project Manager. I capable of overseeing and completing large scale projects on time alongside a dedication to meet all project timeline goals. I have a consistent track record of successfully implementing best practices that improve efficiency, reduce costs and increase productivity, budget management, developing project scope, collaborate with stakeholders, lead project teams. and providing project metrics for senior management I am competent at bridge construction projects on a large scale.

Overview

15
15
years of professional experience
5
5
years of post-secondary education

Work history

Project Manager

Sama construction
Madinah, KSA
2021.09 - Current
  • In the execution of intersection Bridge Omar Ibn El Khattab road & King Abdullah Road where the length is 1000m, system of this project is box section rested on 8 axis & 2 ramps with reinforced earth system

construction manager

Aljazeera for contracting.
Makkah, KSA
2019.10 - 2021.08

in executing 5 bridges in the remaining Parts of Makkah 3rd ring road from Al – maskhota interchange to prince Sultan Road where the length is 1500m, system of this project is deck slab rested on pre-stressed girders.

supervision site engineer

Systra
Cairo, Egypt
2018.12 - 2019.09
  • supervision piling, pile cap, piers & box section in viaduct & ring road station
  • conducting structural monitoring to ensure maximum safety and stability.
  • Responded to technical concerns quickly and effectively, devising strategic solutions to minimise project disruption.
  • Prepared and reviewed engineering specifications, scopes of work, schedules of payments and associated documents.

construction Manager

Arab Contactors Osman A. Osman
6th October, Egypt
2018.02 - 2018.11

in the execution of Bridge 18 El wahat road with length is 1300 M & consists of Box section slabs, three Steel deck & 3 Keystone ramps by using reinforced earth system.

  • Collaborated with construction administration consultants to schedule field observations.

Senior engineer

Arab contractors, Osman A. Osman
Cairo, Egypt
2015.08 - 2018.01
  • in the Execution of El-Warraq Island bridge: where it's system consists of three parts the first part was Deck slab rested on pre-cast Prestressed girders, the second part was flat slab rested on mono piles & the third part was a Box Section system rested on piers.
  • Performed root cause analysis to identify issues with 90 % accuracy.
  • Oversaw quality control inspections to verify product conformance with applicable codes, standards and approved specifications.

Site engineer

Arab Contractors Osman A. Osman
10th of Ramadan , Egypt
2013.02 - 2015.08
  • in the execution the line with length 10 k.m & diameter 2500mm using precast concrete pipes.
  • Outlined construction schedules, equipment and labour requirements using Gantt charts.
  • Onboarded and inspected work of subcontractors to drive quality and performance.

Site Engineer

Arab Contractors Osman A. Osman
10th of Ramadan , Egypt
2010.01 - 2013.02
  • execute clarifiers house & water pumps building where it’s capacity of this plant is 600000 m3/day.
  • Checked technical drawings for adherence to standards, maintaining operational compliance.
  • Documented daily progress, incidents and issue resolutions for accurate site records.
  • Minimised project risks, conducting structural monitoring to ensure maximum safety and stability.

Site engineer

Arab Contractors Osman A. Osman
Cairo, Egypt
2009.07 - 2009.12
  • execution a Bridge on Suez Road where the project length is 900 M & consists of Box section slabs rested on 10 axis piers, 2 Abutment & 2 ramps with reinforced earth system.
  • Oversaw selection and requisition of materials.

Site Engineer

Arab Contactors Osman A. Osman
Cairo, Egypt
2009.04 - 2009.06
  • the execution a Mariotia corridor bridge where the project length is 2000 M & consists pre-stressed girders rested on piers & piles.
  • Oversaw selection and requisition of materials.

Technical engineer

Mohandesco For Contracting
10th of Ramadan , Egypt
2008.08 - 2009.03
  • Collaborated with teams in construction of 3 schools and regions
  • technical office to using microsoft office 2007.

Education

B.Sc - Civil Engineering

El Shorouk Academy, El Shorouk / Egypt
2003.09 - 2008.05
  • Project Name: Concrete.
  • Project Description: Design residential building 11 floors, factory & elevated tank.
  • Project Grade: excellent.
  • 4rh Year Grade: very good.

Skills

  • PMP Certified
  • Project planning and management
  • Technology implementation
  • Risk assessments
  • Procurement and vendor management
  • Finance management and cost control
  • Compliance understanding

Additional Information

  • .

Languages

Arabic
Native
English
Upper intermediate

Timeline

Project Manager - Sama construction
2021.09 - Current
construction manager - Aljazeera for contracting.
2019.10 - 2021.08
supervision site engineer - Systra
2018.12 - 2019.09
construction Manager - Arab Contactors Osman A. Osman
2018.02 - 2018.11
Senior engineer - Arab contractors, Osman A. Osman
2015.08 - 2018.01
Site engineer - Arab Contractors Osman A. Osman
2013.02 - 2015.08
Site Engineer - Arab Contractors Osman A. Osman
2010.01 - 2013.02
Site engineer - Arab Contractors Osman A. Osman
2009.07 - 2009.12
Site Engineer - Arab Contactors Osman A. Osman
2009.04 - 2009.06
Technical engineer - Mohandesco For Contracting
2008.08 - 2009.03
El Shorouk Academy - B.Sc, Civil Engineering
2003.09 - 2008.05