I'm looking forward to knowledge and developing capabilities in the engineering field through training and hard work without compromising honesty and sincerity at work. Therefore,
searching for a suitable job that offers the opportunity to enhance knowledge is one of priorities.
Installation of VRF (Variable Refrigerant Flow) air conditioning system, specifically from Mitsubishi Electric, in Al Al Muraba Towers project. This project consists of two towers, with each tower exceeding 40 floors in height.
Main responsibilities include:
-Installation of Mitsubishi Electric VRF air conditioning system .
- Installation to various duct work , including supply and exhaust fans
-Delivers to consultant according to standards and specifications
- Coordinating installation work
- Monitoring progress of air conditioning installation work and addressing any issues that may arise
- Obtaining necessary approvals for materials used in project
- Preparing as built drawings for system
- Dealing with suppliers to ensure timely delivery of equipment and materials
-Checked technical drawings for adherence to standards, maintaining operational compliance.
As Mechanical Office Engineer, key responsibilities included:
- Reviewing mechanical system designs
- Preparing detailed execution plans to technical standards
- Identifying required materials and equipment
- Monitoring project progress and financials
Through this role, developed strong skills in mechanical design, proficiency in CAD software (AutoCAD, some Revit), and effective collaboration within cross-functional teams.
One notable project was Al Muraba Towers in Riyadh, comprising 40-story administrative tower and 48-story residential tower.
designing over 100 school projects, including designing various air conditioning and fire protection systems. Prepared and implemented maintenance plans for mechanical systems to ensure best practices.
Worked as a design engineer for Mechanical, Electrical, and Plumbing (MEP) systems, as well as Bills of Quantities (BOQ) at UGC International company. During the tenure, over 5 projects were successfully completed, gaining valuable experience in this field. The projects were efficiently managed and tangible results were delivered, contributing to the overall improvement and development of the company's performance. Proficient in strategic planning capabilities and effective problem-solving skills. Additionally, advanced technical skills in utilizing engineering software and the necessary tools to execute the required tasks.
This is a group of courses and Programmes in MEP systems including ( HVAC , Fire Fighting& Safety System , Plumbing &Gas Supply System ,Electrical Installing , BMS , Project Management Fundamentals, Automatic Control Systems, CCTV& Low voltage, AutoCAD& MEP Project Design Using Software's Design Buildings Using Autodesk Revit Software )