1- 9 No’s of air-cooled chillers, YCAV0247SA40model, having capacity 195.3 TR for each,
2- 200 No’s of split units
3- 30 No’s of Air Handling units
4- 20 No’s of Package units
5- Mechanical department including Ro plant, sewage treatment plant, plumbing, fire system, piping, storm system, irrigation network
1- 1.5 MW Power generation plant, including 3 generators with substation buildings (RMU, Transformers, Medium Voltage and Switch Gear,
2- Main and Secondary Low voltage distributions panel
1- 9 No’s of chillers, YCAV Model having capacity 195.3 TR for each
2- 600 No’s of split units
3- 50No’s of Air Handling units
4- 48 No’s of Package units
5- Mechanical department including Ro plant, sewage treatment plant, plumbing, fire system, piping, storm system, irrigation network
1- 1.5 MW Power generation plant, including 3 generators with substation buildings (RMU, Transformers, Medium Voltage and Switch Gear,
2- Main and Secondary Low voltage distributions panel
· 9 No’s of chillers having capacity 320 TR for each
· 600 No’s of split units
· 50No’s of Air Handling units
· 48 No’s of Package units
· Mechanical department including Ro plant, sewage treatment plant, plumbing, fire system, piping, storm system, irrigation network
· 9 No’s of chillers having capacity 246.7 TR for each
· 600 No’s of split units
· 50No’s of Air Handling units
· 48 No’s of Package units
· Mechanical department including Ro plant, sewage treatment plant, plumbing, fire system, piping, storm system, irrigation network
1- Engineering syndicate
Duration: 3 months - (From 15 June 2011 To 10 July 2011)
Type of Training: (Air conditioning design course)
Certificate: (Air conditioning design course)
2- Benha University
Duration: 3 weeks (60hours)
Type of Training: (Local Toefl test score 580)
Certificate:(Local Toefl test)
3- Engineering tracks
Duration: - 35 hours
Type of training: - preparation course for PMP
Duration: - 35 hours
Certificate: - PMP preparation certificate