Accomplished Senior Mechanical Engineer with a proven track record at Meras Investment International, adept in engineering calculations and fostering team collaboration. Excelled in optimizing MEP systems for efficiency and compliance, leveraging AutoCAD and SAP for precision in project execution. Achieved significant milestones in project management and materials selection, ensuring quality and cost-effectiveness.
Overview
12
12
years of professional experience
Work History
Senior Mechanical Engineer
Meras-Al Bawani Group,Saudi Arabia.
Tabuk, Tabuk Region
07.2022 - Current
Project: 1. SEVEN (Saudi entertainment venture) Tabuk.
2. SAR (Saudi Arabia Railways) Light work shop, Alqhurryat.
Review and approve MEP shop drawings (Plumbing, HVAC, Firefighting) prior to execution on-site to ensure compliance with project specifications, design requirements, and standards (SMACNA, ASME, NFPA and PIC).
Execute builder’s work as per approved drawings, ensuring proper coordination between structural and MEP services to avoid conflicts during installation.
Prepare material take-off (MTO) as per IFC drawings, ensuring accurate quantity estimation for procurement and project execution.
Prepare and implement planned weekly schedule for MEPworks to ensure progress aligns with project milestones and deadlines.
Conduct weekly meetings with engineers, supervisors, and foremen to track site requirements, including hand & power tools, manpower, and MEP work progress (Equipment list, Tools list, Daily progress report and Weekly progress report), ensuring smooth execution and alignment with project timelines.
Conduct weekly coordination meetings with Electrical, Mechanical, and Civil teams to identify and resolve site issues, including clashes with other disciplines, design discrepancies, and site coordination challenges, ensuring smooth project execution.
Track MEP material purchase orders with procurement department, ensuring timely delivery of materials in alignment with project needs and schedules.
Prepare material orders using SAP and ERP systems, ensuring accurate quantity estimation and timely procurement in alignment with project requirements and approved specifications.
Prepare red-line drawings to reflect site modifications and raise RFIs (Request for Information) to client for approval, ensuring alignment between design and actual site conditions.
Follow up with QC team after first fix, second fix, and third fix of MEP work completion to ensure WIRs (Work Inspection Requests) are raised and approved by consultant, ensuring compliance with project quality standards.
Follow up on closure of NCRs (Non-Conformance Reports) and site observations issued by QC team, ensuring corrective actions are implemented and approved.
Prepare and oversee flushing of chilled water system and disinfection of water supply system Prior to commissioning.
Coordinate with suppliers for start-up of MEP equipment, including AHUs, FAHUs, chillers, fire pumps, plumbing pumps, electric water heaters, etc., Prior to commissioning and proper functioning of all systems.
Coordination with low current team for equipment integration with BMS prior to functional test, including programming of VFDs for AHUs, FAHUs, and chiller pumps.
Ensure that HVAC system's Testing, Adjusting, and Balancing (TAB) and water balancing procedures are fully completed before conducting functional test.
Ensure that all outstanding snag list items for MEP work are fully resolved and officially closed out.
Mechanical Engineer
Seder Construction Company Saudi Arabia .
Riyadh, Riyadh Region
01.2015 - 05.2022
Project: 1. Makkah General Hospital -500 Bed (Ministry of Health)
2. king Khalid Hospital 350-Bed-rehabilitation (Ministry of Health)
3. Jizan refinery-ARAMCO.
(Relocate Jizan Abha refined product line for implant facility)
4. Al Safarat- diplomatic Quarter Riyadh.
Executed site work in strict accordance with approved MEP shop drawings, ensuring full compliance with project specifications and quality standards.
Coordinated with the Civil team for external work, including excavation and backfilling, for the installation of irrigation HDPE pipes and drainage UPVC pipes.
Ensure the installation of all puddle flanges in fire tanks, water supply tanks, and irrigation tanks, as per approved structural drawings and in coordination with the surveyor.
Preparing all ITPs, QCPs, MIR logs, RFI logs, NCN logs, and SOR logs for Mechanical.
Ensure the availability of all MEP materials for ducting, piping, and fittings as per the approved shop drawings prior to executing the work.
Preparing daily and weekly activity progress reports for manpower and MEP work.
Coordinating with supervisor and resolving MEP work issues on site.
Supervised site visits with electrical, mechanical, and civil teams to address and resolve on-site issues efficiently.
Execution of MEP work in accordance with approved shop drawings and standards and equipment’s installation activities.
Prepare red-line drawings to reflect site modifications and raise RFIs (Request for Information) to the client for approval, ensuring alignment between design and actual site conditions.
Ensure the completion of all Chilled water piping, firefighting, and water supply networks prior to flushing all systems.
Followed up with suppliers for the installation of piping with accessories, aeration tanks, chlorination tanks, sewage tanks, blower pumps, media filters, sand filters, and boosters for the sewage and water treatment plants, including pre-commissioning and commissioning.
Coordinated with the testing and commissioning team to complete the remaining MEP work.
Ensured that all outstanding snag list items for MEP work were fully resolved and officially closed out.
Site Engineer
HVAC Solutions ltd.co
Mumbai, India
08.2013 - 11.2014
Project: 1. Shital Sagar High rise tower (G+20 floors two Wings A& B)
2. Rubber Wala High rise tower (G+35 floors)
Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.
Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
Managed project timelines for timely completion of tasks.
Ensured site safety by implementing rigorous health and safety protocols.
Motivated site teams to achieve quality results against construction deadlines.
Witness testing and commissioning.
Education
Bachelor of Science - Mechanical Engineer
Visvesvaraya Technological University (VTU)
Belgum
06.2013
Skills
Engineering calculations
Materials selection
HAP
McQuay Pipe & duct Sizing
Cost estimation
Microsoft Excel
AutoCAD
Microsoft Office Suite
Personal Information
Timeline
Senior Mechanical Engineer
Meras-Al Bawani Group,Saudi Arabia.
07.2022 - Current
Mechanical Engineer
Seder Construction Company Saudi Arabia .
01.2015 - 05.2022
Site Engineer
HVAC Solutions ltd.co
08.2013 - 11.2014
Bachelor of Science - Mechanical Engineer
Visvesvaraya Technological University (VTU)
Similar Profiles
Ramil Christopher Estiller AzoreRamil Christopher Estiller Azore
Transport & Equipment Coordinator at SAAD AL ESSA GROUP OF, CONTRACTING COMPANY, Province Abqaiq Kingdom of Saudi ArabiaTransport & Equipment Coordinator at SAAD AL ESSA GROUP OF, CONTRACTING COMPANY, Province Abqaiq Kingdom of Saudi Arabia
Electrical project engineer at Municipality of al rass al qassim Saudi ArabiaElectrical project engineer at Municipality of al rass al qassim Saudi Arabia