5ESS Testing and Commissioning, Routing Planning, Routing Analysis., GSM system structure, 5ESS (O&M), No.7 Signalling. (O&M), European GSM Standards & CWO Implementation., STC- TEP-6,TEP-7 Network Expansion Projects (Fixed Landline) over two million lines., STC-Y2K Project ,450K Project ,21K Project,170K Project,Intelligent Networks., Internet PhaseII &phaseIII, Optical Interface (STM-1) with Local Exchange By Using SDH-TE., AnyMedia (RANs) Projects 21k, 80k and 450k., Managed new and expanded MSC sites for GSM Mobile System., Prepared engineering design documents and Rehome Method of Procedures to STC., OSPS Expansion Projects for 905(Customer Care center),Commissioning and Migration Plan., Disaster Recovery Projects-Three Local/Toll/Tandem Exchanges., Wireless Local Loop Integration, rehome(CDMA) and V5 Interfaces., Managed and Planned Rehoming of New sites., MSAN Phase I,II,III. MSAN-Voice(VOIP) Phase IV ,Integration with SOFTX3000(NGN) Hybrid MSAN Phase V, Integration of G.SHDSL MSAN., LE Decommissioning Project by using PCO Migration tool (Migration of PSTN customers to NGN VOIP customers)., National Numbering Plan for All over kingdom., FTTM (Fiber to the Mobile Back Haul) Design and Implementation of FTTM as GPON Backhaul for 3G,4G., Trouble shooting for VPN circuits by checking and help of Circuit design Database., Coordinate and trouble shooting with Cisco Team for the Gi Interface(Uplink) connected to Aggregator(7609)., Analyzing the faults and technically supporting field Engineers to solve the outages for IPDSLAM,NGN-MSAN,SDH-MSAN by using AMS-5520, Escalate all pending and abnormal issues to ANOC Manager if needed to expedite the resolution time, respond all fault/outage inquiries from STC Higher Management.