Overall experience is 30 years of Oil & Gas and infrastructure projects fully experience with managing crews in all Phases of the projects Engineering, Procurement, Construction, Pre-commissioning and Commissioning to complete the projects on-time, on-budget and high-Quality.
The Thirty Years experience as:
1- Seventeen Years as EPC Project Manager
2- Three Years as EPC Project Area Manager
3- Five Years as Engineering Manager
4- Three Years Pipeline and Piping Design Engineer
5-Two Years as Electromechanical, Pipeline & Piping Construction Engineer
During this period worked in many projects for international companies:
- Aramco -Kingdom of Saudi Arabia
- Egyptian Refining Company “ERC”
- Qatar Petroleum Company
- Jordanian Egyptian Fajr for Natural Gas Transmission &Supply
- North Iraq Oil Company
- Gasco -Abu Dhabi
- Petroleum Development Oman
- General Company for Gas Transmission and Distributions -Libya
- Ministry of Energy and Water Electricity of Lebanon
- The Arab Petroleum Pipelines Company (Sumed)
- Agib/ Sonatrach Petroleum Corporation
- Sonatrach Petroleum Corporation -Algeria
- Agib – Libya
Many successes of Oil & Gas and infrastructure Projects with Multimillion-dollars, as EPC project area manager, manage Six EPC Projects of total budgets 586 million Dollars.
Project: Engineering, Procurement, Construction, Pre-Commissioning and Commissioning Sulphur Recovery Units to improve the availability and efficiency of the Riyadh Refinery as part of the corporate Environmental Master Plan
Location: Riyadh
Client: Aramco
Job Description:
Facilitating project development and progress from initiation to completion and coordination with designated teams, and delivery of results within deadlines and budget constraints.
Responsibilities:
Projects:
Engineering, Procurement, Construction, Pre-Commissioning and Commissioning for the following projects:
1- Firefighting and service networks of Mustard Geographic Area brown field area for stockholder's oil companies (Fire Fighting Network 32 Inch /24 Inch is 9200 m length and Service Network 12 Inch 9200 m length, two water tanks each one capacity is11000 Cubic Meter, seven diesel pumps each one capacity is 5000 GPM, two electrical jokey pumps each one capacity is 750 GPM with all facilities and the project budget is 92 million dollars The stockholders are Pipelines Petroleum Company, Cairo Oil Refining Company, Cooperation Petroleum Company, Petroleum Gas Company, Exxon Mobil Company, Total Company and Misr Petroleum Company
2- Tank Farm storage area for Cairo Oil Refining Company of twelve tanks (two tanks each one diameter is 80 m diameter, six tanks each one diameter is 60 m diameter, four tanks each one diameter is 44 m, and the height of all tanks are 14 m with all facilities and the project budget is 365 million dollars
3- Two cooling towers for Cairo Oil Refining Company capacities 8500 cubic meter per hour and 4300 cubic meter per hour with all facilities and the project budget is 54 million dollars
4- Rerouting of eight (oil and gas) pipelines with total length 12000 m and the project budget is 61 million dollars
5- Precast fence with 1500 m and gates of tank farm with all accessories for Cairo Oil Refining Company and the project budget is 8 million dollars
6- Main administration building firefighting, finishing and SCADA control room with all accessories for Pipelines Petroleum Company and the project budget is 5 million dollars
Location: Cairo
Client: Stockholders Oil Companies
Job Description
Coordinating the operations of multiple locations within Mustard Geographic Area. to ensure that each site achieves its objectives, manages resources, implements strategies, and fosters effective communication to optimise overall performance and efficiency.
Responsibilities
EPC Project Manager at Petrojet June 2004 - June 2021 Egypt, Libya, Jordan, Algeria, Saudi Arabia, Abu Dhabi, Qatar, Oman, Iraq, Lebanon
Projects
3-From 2019 to 2021
Project: Engineering, Procurement, Construction, Pre-Commissioning and Commissioning Wastewater Treatment Plant with capacity 14000 Cubic Meter/day
Location: Aswan-Egypt
Client: Company for drinking water and sanitation in Aswan
4-From 2017 to 2019
Project: Engineering, Procurement, Construction, Pre-commissioning and Commissioning of four Desalter packages and Ancillaries inside life Area in Cairo Oil Refining Co. (CORC) to obtain Crude oil with special Requirements according to engineering process data to feeding the new Refinery for (ERC) which located nearest to (CORC) Refinery
Location: Cairo-Egypt
Client: Egyptian Refining Company “ERC”
5- From 2016 to 2017
Project: EPC Storage tanks for three stations and oil Pipeline10”/6”-85kmPetroshahd Oil Pipeline and Storage Tanks for Three stations
Location: Cairo - Egypt
Client: Petro Shahd Petroleum Company
6- From 2015 to 2016
Project: EPC Gas pipeline16”-15 km start from Arab gas pipeline tie in Point to IPP3 Power station at Jordan with equipment's and associated piping
Location: Jordan
Client: Jordanian Egyptian Fajr for Natural Gas Transmission &Supply
7- From 2014 to 2015
Project: EPC of Eight storage tanks, volume per tank is 6000-meter cub with Equipment's and associated piping
Location: Cairo - Egypt
Client: Misr Petroleum Company
8-From2013to 2014
Project: EPC LPG Pipeline 16”-200 KM Start from Khour to Elzubir
Location: Iraq
Client: North Iraq Oil Company
9-From 2012 to 2013
Project: EPC of Gas Pipeline 24/16”-30 KM Start from Yas Island to Mina Zayed
Client: Gasco
Location: Abu Dhabi
10-From 2011 to 2012
Project: EPC of Gas Pipeline 20”-157 KM Start from Barik to tie-in with the Existing south Oman gas line at BVS-8
Location: Oman
Client: Petroleum Development Oman
11-From 2010 to 2011
Project: EPC of Gas Pipeline 20”-187 KM Start from Entessar to El Sarir
Location: Libya
Client: General Company for Gas Transmission and Distributions
12-From 2008 to 2010
Project: EPC of Gas Pipeline 48”-436 KM Start from Hassi El Ramel to Mechtatine to Feed the Power Station at Kala
Location: Algeria
Client: Sonatrach Petroleum Corporation
13-From 2007 to 2008
Project: EPC of Three tanks, volume per tank is 90000-meter cub with Equipment's and associated piping
Location: Cairo - Egypt
Client: Sumed
14-From 2007 to 2007
Project: EPC of Multiphase 12" Pipeline 55 KM at BRN Area Desert Location: Algeria
Client: Agip / Sonatrach
15-From 2006 to 2007
Project: EPC of Oil Pipeline 30”-675 KM Start from Houd El Hamra Desert to Skikda Port
Location: Algeria
Client: Sonatrach
16-From 2004 to 2005
Project: EPC of Oil Pipeline 30”- 725 KM Start from Sharara field to Melita port
Location: Libya
Client: Agip
Project Brief: Oil Pipeline3 0”-725km Start from Sharara Desert to Melita Port.
Projects:
17-From 2003 to 2004
Project: EPC of Gas Pipeline 30” - 160 Km Start from Rashid to Damietta to Feed Damietta Power Station
Location: Rashid-Egypt
Client: Gasco-Egypt
18-From 2002 to 2002
Project: EPC of Gas Pipeline 8”-14 Km start from Ghareb station to Bakr station Location: Ghareb-Egypt
Client: G.P.C
19-From 2001 to 2001
Project: EPC of Gas Pipeline 12-25 Km Start from Merlon Gas Well to Gasco Pipeline
Location: Mansoura
Client: Merlon
20-From 2000 to 2001
Project: Piping Modification inside Gupco Station
Location: Giza
Client: Gupco
21-From 1999 to 2000
Project: EPC of Gas Pipeline 24”-300 Km Start from Port Said to Eyon Mosa
Location: Port Said
Client: GASCO-Egypt
Responsibilities:
· Fully informed with the scope of work and project contract
· Visiting the site with my engineering team and the client to collect any missing data related to the project.
· Manage all engineering activities related to the project scope of work
· Sharing the planner of the project to prepare the detailed engineering schedule to achieve the EPC project schedule
· Sharing and review the project contract
· Review and approval the Detailed Design Drawings/Documents issued by the engineering Team
· Coordination Between All Engineering Departments and the Client for any engineering clarifications or comments
· Sharing in the HAZOP review meeting with the client to update all documents required (P&IDs, Plot Plane, Cause and Effect and Operation & Control Philosophy, etc) by the engineering team according to the HAZOP recommendation
· Weekly report for engineering activities
· Expedite the Procurement after orders for the materials suppliers with direct contact with the suppliers
· Review and approved vendor prints
· Projects follow up during the construction including site visits to solve any problems.
Projects:
1- From 1997 to 1999
Project: EPC of Gas Pipeline 32”-195 Km Start from Amria to Dahshur
Location: Amria
Client: Gasco –Egypt
2- From 1997 to 1997
Project: EPC of Gas Pipeline 24”- 50 Km Start from Port Said to Damietta for Feeding Damietta Power Station
Location: Port Said
Client: Gasco–Egypt
3- From 1996 to 1996
Project: EPC of Gas Pipeline 24"/16" - 35Km Start from Al Amria to Sidi Krier for Feeding Gas to El Dekhila Steel Factory
Location: Alex
Client: Gasco –Egypt
3- From 1996 to 1996
Project: EPC of Gas Pipeline30”-30 Km Start from Bani Suef to Al Kurimat for Feeding Al Kurimat Power Station
Location: Bani Suef
Client: Gasco –Egypt
Responsibilities:
- Reading scope of work and visiting the site with the client to collect any missing data related to the pipeline and piping works of the project.
- Issued the detailed design drawings / documents
(Pipeline alignment sheets, crossing details, P&IDs, PFD, data sheets, line sizing, Plot plans, Hydraulic Calculation, Stress analysis, Pipe supports detail, ...etc) and all Calculations required according to the National Codes Including ASME, API.
- Projects follow up during Construction including site visits to solve any problems.
Construction engineer for Pipeline & Piping and Electromechanical works.
Projects
1- HVAC, Firefighting, Plumbing of Agiba Petroleum Company Administration Building
Location: Cairo
Client: Agiba Petroleum Company
2- HVAC, Firefighting, Plumbing of Egyptian Petroleum Ministry Administration Building
Location: Cairo
Client: Egyptian Petroleum Ministry
3-Sumed Oil Pipeline 42" - 35 km
Location: Cairo
Client: Sumed
Responsibilities: