Accomplished Construction Project Manager with 20+ years of experience specializing in high-rise building construction and complex mixed-use developments. Proven track record of delivering landmark towers from design through commissioning, with expertise in: - High-Rise Execution: Managing vertical construction logistics, facade systems, high-capacity MEP installations, and podium-to-tower transitions - Construction Methodologies: Jump form systems, tower crane logistics, concrete pumping strategies, and phased handover sequencing - Project Controls: Budget management up to $100M+, schedule optimization, and risk mitigation - Stakeholder Leadership: Coordinating with developers, consultants, government authorities, and international design firms Successfully delivered 4 high-rise towers (23-30+ floors) and 5+ major projects across KSA and Egypt. PMP-certified with strong BIM proficiency and a hands-on approach to construction excellence.

Overview

22
22
years of professional experience
1
1
Certification

Work History

Project Manager

Confidential
Riyadh
01.2026 - Current
  • Leading design development and pre-construction planning for a 31+ story high-rise tower
  • Coordinating with international architects and engineering consultants to deliver integrated, buildable design
  • Established project execution strategy, master schedule, and SAR 100 M budget
  • Managed value engineering exercises achieving 12% cost optimization without compromising quality
  • Led tendering process for major packages (facade, MEP, structural steel) with 7+ subcontractor evaluations
  • Secured all preliminary government approvals and authority NOCs
  • Tower Crane Strategy: Planning for (1) luffing jib tower cranes with 50m radius and 8-ton capacity for vertical material handling
  • Concrete Pumping: High-pressure stationary concrete pumps with distribution mast system for heights exceeding 150m
  • Formwork System: Self-climbing jump form system for core walls and slip forming for elevator shafts
  • Vertical Logistics: Double-deck material hoists and passenger hoists (24-person capacity) for efficient workforce movement
  • Batching Plant: On-site batching plant (120 m³/hr capacity) to ensure consistent concrete supply
  • Façade Installation: Mast climbing work platforms (MCWP) for curtain wall installation at height

Project Manager

Shougana Company
01.2023 - 12.2025
  • Delivered project 3 months ahead of schedule through optimized vertical logistics and phased construction
  • Managed SAR 85M budget with under 2% cost variance throughout 5-year project lifecycle
  • Led a multidisciplinary team of 12+ staff and 200+ site workers
  • Oversaw procurement and contract management for 9+ subcontractor packages
  • Implemented BIM-based coordination reducing MEP clashes by 40%
  • Achieved zero LTI (Lost Time Incidents) over 0.5 million man-hours
  • Obtained all statutory approvals including Civil Defense, Municipality, and occupancy certificates
  • Successfully managed 10+ change orders valued at SAR 4.5M with minimal schedule impact
  • Deep Excavation & Shoring: 20m deep excavation with tie-back anchors
  • Foundation System: 1.8m thick raft foundation (2,500 m³ concrete) placed in (4) continuous pours using 3 concrete pumps simultaneously
  • Tower Crane Logistics: (1) Hammerhead tower cranes (TC 7020) with 60m jib length; 8-ton capacity
  • Formwork Systems: Core walls: climbing formwork (ACS) system; Columns: Modular column formwork with 4 m lift height
  • Concrete Pumping: (1) Stationary concrete pumps with 100m vertical reach; boom pumps for podium levels; conveyor systems for basement slabs
  • Vertical Transportation: (1) 24-person construction hoists (Alimak type)
  • Scaffolding Systems: Cuplock system for podium areas; suspended scaffolding for façade works
  • Façade Installation: cradle systems for curtain wall installation

Construction Manager

HASSAN ALLAM Construction
New Capital
01.2014 - 12.2019
  • Managed on-site construction execution for 25,000 m² podium with 2 basements and 4 independent buildings
  • Supervised 800+ construction workers and 15+ site engineers
  • Coordinated construction sequencing between 4 buildings ensuring seamless interface management
  • Managed daily site operations including concrete pours, steel fixing, formwork, and MEP installation
  • Ensured compliance with DAR design specifications and quality standards
  • Led weekly site progress meetings with client and consultant teams
  • Excavation: 12m deep excavation with diaphragm wall shoring
  • Formwork: ACROW modular formwork system for columns and shear walls; beam formwork with adjustable props
  • Concrete: On-site batching plant (90 m³/hr) with boom pump and line pump distribution
  • Heavy Equipment: (2) cranes (6-12T), (6) mobile cranes, (10) telescopic handlers
  • Floor Construction: 250mm post-tensioned flat slabs with 18m span capability
  • MEP: Prefabricated MEP risers and modular AHU rooms for speed

Construction Manager

HASSAN ALLAM Construction
New Capital
01.2014 - 12.2019
  • Oversaw full construction execution of terminal building (150 pax/hr) + 49 ancillary buildings
  • Managed infrastructure works including 240 km of roads and utilities installation
  • Supervised construction of water treatment plant, electrical substations, and RO plant
  • Coordinated multiple specialized subcontractors across 49 buildings simultaneously
  • Monitored daily progress, quality control, and safety compliance
  • Earthworks: (15) Excavators, (20) dump trucks, (8) dozers, (5) motor graders; 2.5M m³ cut and fill
  • Utility Installation: Trenching machines, pipe layers, and directional drilling for 240km utilities
  • Terminal Building: Steel structure with 30m clear span; (4) mobile cranes (100T-200T) for steel erection
  • Paving: (3) Concrete pavers and (4) asphalt pavers for apron and road works
  • Specialized Equipment: Water treatment plant installation with 500 m³/day capacity

Project Engineer / Construction Manager

ARABTEC - SIAC Industrial Construction & Engineering Co.
Cairo
01.2011 - 12.2014
  • Led on-site construction of twin 23-story towers (72m height)
  • Residential tower + 5-star Hilton hotel with complex MEP requirements
  • Managed construction sequencing for both towers simultaneously
  • Supervised 600+ workers across structural, architectural, and MEP trades
  • Coordinated façade installation, vertical transportation systems, and hotel fit-out works
  • Successfully delivered project 2 months ahead of schedule
  • Shoring System: 16m deep excavation with Diaphragm wall shoring + Dewatering System
  • Foundation: 1.5m thick mat foundation (4,200 m³ per tower) using 2 boom pumps
  • Tower Crane: (2) Tower cranes (30m jib, 6T capacity) – one per tower
  • Formwork System: Jump form system for core walls (4m lift per week); Aluminum formwork (Doka type) for slabs achieving 5-day cycle per floor; Column formwork with 5m lift heights
  • Concrete Pumping: (2) Stationary concrete pumps with 100m vertical reach
  • Façade: (2) Mast climbers and (4) suspended scaffolds for curtain wall system
  • Hoists: (2) 16-person passenger hoists per tower; (2) 2T material hoists
  • Structural Steel: Installed using mobile cranes (50T) for transfer beams and podium areas

Project Engineer / Construction Manager

ARABTEC - SIAC Industrial Construction & Engineering Co.
Cairo
01.2011 - 12.2014
  • Managed construction of 8,000 m² steel structure warehouse
  • Supervised specialized floor construction (non-expansion joint and hygienic tiles)
  • Coordinated MEP installations for food-grade manufacturing facility
  • Steel Erection: (2) Mobile cranes (80T and 50T) for 30m span steel trusses
  • Flooring: Laser screed machine for 12,000 m² of non-expansion joint concrete floor (FF50 tolerance)
  • Specialized: Hygienic tile installation with food-grade epoxy grouting

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
Cairo
01.2007 - 12.2011
  • On-site construction supervision of 9 Class A office buildings (125,000 m² total)
  • Wilkinson Eyre design with complex architectural features
  • Supervised civil, architectural, finishing, MEP, infrastructure, and landscaping works
  • Managed daily site operations for 150+ workers

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
Cairo
01.2007 - 12.2011
  • Construction execution of 57,470 m² shopping mall (2 buildings)
  • Building A: Ground + 3 floors + Roof | Building B: Ground + 1 floor + Roof
  • Supervised all structural, external finishing, and public area internal finishing
  • Slabs: Post-tensioned flat slabs with 16m spans
  • Finishing: (8) Material hoists for internal finishing works
  • Re-measure Contract: Rigorous quantity tracking and measurement

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
Cairo
01.2007 - 12.2011
  • Construction supervision of 11,800 m² office building
  • 2 basements (2,950 m² each) + Ground + 3 typical floors + Roof
  • Supervised earthworks, structural works, core & shell architectural works
  • Managed MEP installations including electrical ducts and landscaping

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
Cairo
01.2007 - 12.2011
  • Construction management of 235 villas + 106 townhouses
  • Quantities managed: 295,000 m³ earthwork, 143,000 m³ concrete, 11,600 tons steel, 435,000 m² masonry, 975,000 m² plastering
  • Managed construction of 341 residential units simultaneously
  • Implemented phased construction approach for efficient resource utilization
  • Phased Construction: 6 phases of 40-50 units each
  • Equipment Fleet: (8) Mobile cranes, (12) Concrete pumps, (20) Excavators, (30) Dump trucks
  • Formwork: Plywood formwork system (reusable) for 341 units
  • Just-in-Time Delivery: Material scheduling for 341 units simultaneously

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
Cairo
01.2007 - 12.2011
  • Full turnkey construction management
  • 2 basements (4,500 m² each) + Ground + 4 typical floors (3,125 m² each) + Roof (680 m²)
  • Total Built Area: 25,305 m²
  • Supervised structure, architecture, MEP, and landscaping
  • Ensured high-quality finishes for banking facility
  • Deep Excavation: 15m with secant pile shoring
  • Equipment: (2) Tower cranes, (3) Concrete pumps, (4) Material hoists
  • High Quality: Strict quality control for banking facility (floor flatness, data center requirements)

Site Engineer

Alexandria Construction Co. (Tall3t Mostafa)
Cairo
01.2006 - 12.2008
  • Eskan Hadaeky – Sheikh Zayed residential development
  • Supervised structural works, quality control, and site coordination

Resident Engineer

Misr Consultant Office (Mokhtar Sedeek)
Cairo
01.2005 - 12.2006
  • Asmarat Compound – Mokattam residential project
  • Site supervision, quality assurance, and contractor coordination

Education

B.Sc. - Structural Engineering

Zagazig University
Egypt
06.2004

Postgraduate Studies - Project Management

Zagazig University
Egypt

Skills

  • High-Rise Construction
  • Façade & Curtain Wall Systems
  • Vertical Logistics & Tower Cranes
  • Jump Form & Slip Form Systems
  • Podium & Basement Construction
  • Deep Excavation & Shoring
  • Concrete Pumping Systems
  • MEP Integration
  • Value Engineering
  • Project Planning & Controls
  • Budget & Cost Management
  • Contract Administration (FIDIC)
  • Subcontractor Management
  • Risk Management & Claims
  • Quality & HSE Compliance
  • Stakeholder Communication
  • Government Approvals & Permits
  • Team Leadership
  • AutoCAD (2D & 3D)
  • Revit (Architecture & Structure)
  • SAP 2000
  • ArchiCAD 21
  • Microsoft Project
  • Primavera P6
  • Cranes
  • Concrete Equipment
  • Formwork Systems
  • Vertical Transport
  • Scaffolding
  • Earthmoving
  • Specialized

Certification

  • PMP Certification, In Progress
  • BIM Professional (Revit Architecture & Structure)

Custom Section

  • +2, 01006266550
  • +966, 539210254

Additional information

Egyptian Engineers Syndicate

Availability

Immediate (KSA transferable Iqama)

References

Available upon request

Timeline

Project Manager

Confidential
01.2026 - Current

Project Manager

Shougana Company
01.2023 - 12.2025

Construction Manager

HASSAN ALLAM Construction
01.2014 - 12.2019

Construction Manager

HASSAN ALLAM Construction
01.2014 - 12.2019

Project Engineer / Construction Manager

ARABTEC - SIAC Industrial Construction & Engineering Co.
01.2011 - 12.2014

Project Engineer / Construction Manager

ARABTEC - SIAC Industrial Construction & Engineering Co.
01.2011 - 12.2014

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
01.2007 - 12.2011

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
01.2007 - 12.2011

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
01.2007 - 12.2011

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
01.2007 - 12.2011

Site Engineer / Construction Engineer

SIAC Industrial Construction & Engineering Co.
01.2007 - 12.2011

Site Engineer

Alexandria Construction Co. (Tall3t Mostafa)
01.2006 - 12.2008

Resident Engineer

Misr Consultant Office (Mokhtar Sedeek)
01.2005 - 12.2006

B.Sc. - Structural Engineering

Zagazig University

Postgraduate Studies - Project Management

Zagazig University
MOSTAFA MOHAMED HUSSAIN ZAHRA