Summary
Overview
Work history
Education
Skills
Personal Information
Languages
Timeline
Generic

MOSTAFA MOHAMED REDA OTHMAN

Jeddah

Summary

Around 15 years of intensive experience in Structural Analysis, Check and Design of steel structures, BIM coordination, coordination with all engineering and construction activities. working now as Head of Technical Office in: preparing schematic proposals and concept reports using different codes, creating 2D&3D models required using different analysis programs, making full structural design and neat calculations, Preparing and checking design drawings, making and checking RC shop drawings using CAD and steel detailing using TEKLA, and lead the technical team to deliver with required quality and time.

Work Experience: Estimation and design of steel structures and preparing commercial offer for steel projects in market using best economical sections. Preparing/reviewing 2D or 3D Analysis Model with detailed calculation report and full connections design to be submitted for consultant approval. Preparing/reviewing proposed design drawings using CAD to clients. Preparing/reviewing Shop drawings using TEKLA & send to workshop for fabrications. Creating/reviewing Material list for purchasing after using Nesting software. Following up with erection team in site and solving site problems.

Experienced professional with focus on office management and team leadership. Able to streamline operations, enhance productivity, and foster collaborative work environment through strategic planning and strong organizational skills. Proven track record in implementing efficient processes and driving continuous improvement initiatives.

Overview

16
16
years of professional experience
5
5
years of post-secondary education

Work history

Technical Office Head

AFCO STEEL - MEMBER OF MITWALLI STEEL GROUP
Jeddah
03.2016 - 11.2024
  • Streamlined office operations by implementing efficient administrative procedures.
  • Fostered a positive work environment for improved employee morale.
  • Improved communication flow with introduction of team meetings.
  • Enhanced productivity through implementation of effective delegation strategies.
  • Managed staff rosters for optimal work distribution.
  • Implemented new data management systems for increased efficiency.
  • Ensured compliance with industry standards, resulting in fewer audit findings.
  • Boosted customer satisfaction with prompt and accurate response to queries.
  • Maintained high standards of accuracy and quality in data entry and recordkeeping.
  • Created and submitted progress reports to upper management.
  • Resolved team conflicts and assisted with identified problems to maintain sense of teamwork.
  • Estimation and design of steel structures and preparing commercial offers for steel projects in market using best economical sections
  • Preparing/reviewing 2D or 3D Analysis Model with detailed calculation report and full connections design to be submitted for consultant approval
  • Preparing/reviewing proposed design drawings using CAD to clients
  • Preparing/reviewing Shop drawings using TEKLA & send to workshop for fabrications
  • Creating/reviewing Material list for purchasing after using Nesting softwares
  • Following up with erection team in site and solving site problems
  • Projects executed with AFCO:
  • Design, Detail, coordinate, fabricate, preparing technical material submittals and follow up all steel structure works and fit outs in SEVEN projects at Seven ABHA (3500 ton), Seven Jazan (5300 ton), Seven Kharj (3000 ton), Seven Taif (2450 ton), and Seven Makkah (3600 ton)
  • Jeddah’s Islamic Biennale, Design, Coordination, Fabrication, Fireproof Painting, Supply, Installation for 10 Steel Structure Buildings with steel composite metal decking and sandwich
    panels & miscellaneous works for total built up area 30,000 sq with total tonnage 4500 tons in 4 months. Design, coordination, detailing and leading the technical team to finish all technical submittal in 40 days with modifying as per client request in the middle of work
  • Al ULA FILM STUDIOS & SOUND STAGE PROJECT, 1800 tons.
  • MBC Studios Phase 1 at Riyadh, 1000 ton.
  • Neom Construction Villages 5K & 10K for 104 PEB buildings.
  • Formula F1 Grand prix Jeddah, Pedestrian Bridge and Vehicle bridge.
  • DEVELOPING & REHABILITATION OF PILGRIMS TENTS AND UTILITIESAT HOLY MENA - MAKKAH
  • NEOM NEC STRUCTUAL UPGRADE
  • Jubail 3A Independent Water Plant -RO RACKS & ERD STRUCTURE
  • Holy Haram Makkah Extension - Marwa Bridge & Balcony Project (current) - 4000 ton project - redesigning steel connections and preparing shop drawings and erection drawings
  • Jeddah’s Pedestrian Bridges
  • KING ABDULLAH UNIVERSITY OF SCIENCE AND ARTS ( KAUST)
  • Jeddah’s advertising flag pole boards
  • National Guard Hospital Projects in Qassim, Taif, Riyadh and Jeddah under NESMA for all Steel elements like platforms, linking bridge, Internal Glass Partitions, Trench covers, Stairs, Shafts, car park sheds,… etc
  • Design and detailing of Gharbiya Steel Factory (20,000 m2) with concrete works (done) & Gharbiya Steel Mill Factory - 1200 ton - (under design)
  • Al Bakri Hotel, Jeddah - making design, coordination and shop drawing for 8 story Hotel (suspended)
  • King Salman International Convention Center (KSICC) - design and shop drawing for all steel catwalk & platforms
  • 2 different Pre Engineered Built-up cold store warehouses (80x250m x height 16m) each one 20,000 m2 in third industrial city for KGL company - design and shop drawings
  • Design steel systems supporting movable cranes for ACE-cranes as our factory has joint venture with ACE
  • Design and shop drawing for Iron melting factory 'Majalat Steel' with area 70x111 m and height of 22m
  • The factory has 10 cranes starting from 10 ton to 50 ton , also with design of concrete works for foundations and else
  • Design and shop drawing for 'Ethiopia Cortex New factory' - steel applications workshop in Addis Ababa
  • 12 ambulance 3 floors Buildings for Saudi Red Crescent
  • Starbucks Café in Riyadh
  • Design and shop drawings of 2 cold store warehouses in Makkah each 7000 m2 for beyot al gharbiya
  • Korean Lighting Factory in Jeddah
  • Zood factory - hanger with Mezzanine area of 4200 m2
  • Design and shop drawings of 2 steel Pedestrian bridges between 2 buildings with space 25 m at height 18 m with width 3.5 m
  • Dana Mall Trusses in Yanbou' city covering area 10,000 m2 supporting concrete floor
  • Design of Al-Haiba Paints Factory 20,000 m2
  • Design of Steel truss coverage 1500 m2 above theater of Technical College for Girls in Khobar - Aljafr company
  • Design of car Park Sheds for Aramco
  • Tabouk University warehouse design and shop drawing

Structural Engineer

SAUDI BIN LADEN GROUP - SBG ABCD
Jeddah
07.2014 - 03.2016
  • KING ABDULLAH BIN ABDULAZIZ PROJECT FOR HOLY HARAM EXPANSION AND CORRESPONDING ELEMENTS
  • SHAMIYAH BUILDING - PIAZZA - SERVICE BUILDING - HOSPITAL - 1ST RING ROAD - FOUR SECURITY BUILDINGS - PEDESTRIAN TUNNELS - MATAF EXPANSION - CUC - KUDAI STATION
  • Design of all concrete Pedestals, Foundations, and Rafts supporting designed steel systems using SAFE
  • Design of SBG Engineers Office Building Complex in Makkah - 5 stories steel building with 1m depth concrete raft according to ACI 318, IBC 2006, AISC
  • Coordination for shop drawings, following up fabrication with subcontractors and site status till erection
  • Design for all steel elements supporting marble in all Haram applications and Steel Car Park Sheds
  • Design of Dead Shutter applications, negative steel arch supporting precast arches, steel platforms supporting electro mechanical applications like pipes and cable trays
  • Coordination with Electro Mechanical applications supported on steel systems using RVT-13
  • Design of Façade Vertical Fins supporting steel system in 4 security Towers
  • Design of CUC pipes Saddles & supports, and design of AHU supporting system in Shamiyah and mataf
  • Design of Main Steel System Fixing Chandelier in internal Piazzas with depth 35m suspension
  • Discussion with Consultant DAH about all submitted design & coordination till getting approval in 3 business trips to Cairo to solve suspended issues

Structural Engineer - Team Leader in technical Office

Al-AWAD Contracting GROUP
05.2013 - 06.2014
  • NURSING COLLEGE PROJECT - HA'IL UNIVERSUTY
  • Structural CHECK Design for College Building using Etabs, SAFE, and AutoCAD according to ACI-318 & UBC97 and project specs and Submitting Structural Design to the Consultant to get approvals
  • College building is a concrete Building consist of 3 floors & Roof & Land Area was 10,000 m2
  • Preparing BOQ's for structural works at Nursing College Project - Hail University
  • Steel Design & detailing for several factories in the industrial Area (MODON) in Riyadh, Jeddah, and Hail

Structural Engineer

Al-AMAR CONSULTING GROUP
11.2012 - 05.2013
  • TABOUK UNIVERSITY HOSPITAL & AL-JOUF UNIVERSITY HOSPITAL - Saudi Arabia
  • Tirana Hotels and Resorts - Sharm El-Sheikh
  • Mivida Project - New Cairo
  • Villa Assaf - Riyadh - Saudi Arabia
  • AIS - Schools Complex - French School
  • Pakistani School - New Cairo
  • DARA Residency Club
  • Design Review according to ACI-318
  • Preparing Concrete Shop Drawings with making Bar Bending schedules and Bill of Quantity according to ACI-318 & ACI-315 and making Steel Shop Drawings using Tekla 16
  • Coordination with Electro-Mechanical and Architecture drawings with preparing the Required RFI's to the Project Consultant 'Al-Zohair Fayez group'

Technical office Engineer

Al-Zain Engineering Studies & Real Estate Investment Co.
06.2011 - 11.2012
  • Company Overview: (Which had Joint Mixture with GHI, HARAMAIN GATE, and MOFAC)
  • Shamiya Project - Third Expansion of Holy Haram and Surrounding Area - Makkah
  • Representing Al-Zain Engineering Studies at Canton Fair - Guangzhou - China
  • KAIA 'King Abdul-Aziz International Airport' at Jeddah
  • MOI 'Ministry Of Interior' - Correctional Facilities at Riyadh
  • Steel Shop drawing and Coordination Works for False columns, Raised Floor and Steel Platforms
  • Following up with steel suppliers for needed materials
  • Revising, discussing and correcting the steel shop drawings for Shamiya and concrete shop drawings for KAYA with Consultant 'DAR Al-Handasa'
  • Steel Shop Drawings using Tekla 16
  • (Which had Joint Mixture with GHI, HARAMAIN GATE, and MOFAC)

Surveying Engineer

SMT Consulting Group
07.2010 - 05.2011
  • Surveying works to study the Road, Water and Sanitation Networks in the Industrial Zone and the proposed Investment Area in Sixth of October City
  • Surveying Detailing for (Juhayna Factory, Headquarters of the Police Department for help and some other lands)
  • Surveying Contour work (Grid leveling) for El-Akkad District in Aswan and some new Cords in Sixth of October City
  • Surveying works for the Oriental Company for Development (Daheyat Al Nakhiel - BUE in Shurouk)
  • Setting out of columns and foundations of the 'Carrier Robot Station for passengers' at Cairo International Airport as well as Installation of Machinery anchors in the station 'setting out acc.= 1mm'
  • The process of Measuring and Observing the Deformations (inclination and settlement) of one of the Buildings at Nasr City using Total Station and Precise Level
  • Surveying works of Expanding Cairo-Al Fayoum Road for Arab Contractors Company
  • Surveying works needed for Developing and Duplication of Abbasiya-Turrah Rail way and Studying the Possibility of using the line as the Fifth Metro Line for the Egyptian Railway Authority

Site Engineer

Ginza for Constructions & Real Estate Development
06.2009 - 09.2009
  • Constructions Field work in Alegria Project, Beverly Hills, Al Sheikh Zayed

Intern

Unit of Surveying - Ain Shams University
06.2008 - 09.2008
  • Training at Technical Office

Education

B.Sc. Civil Engineering -

Ain Shams University
06.2005 - 06.2010

Skills

  • AutoCAD 2D
  • Tekla Structures
  • SAP2000
  • ETABS
  • SAFE
  • Surfer
  • RAM Connections
  • LIMCON
  • Microsoft Office
  • Prokon
  • IDEA STATICA
  • Autodesk REVIT Structure
  • HILTI Profis Anchors
  • STAAD Pro 2007
  • Advance Steel
  • TEAM WORKING ABILITIES
  • INTERACTIVE AND FAST LEARNER
  • ADAPTATION TO ALL ENVIRONMENTS
  • Budgeting oversight
  • Negotiation mastery
  • Performance tracking
  • Contract administration
  • Data analytics
  • Stakeholder liaison
  • Supply chain coordination
  • Leadership development
  • Workflow management
  • Business administration
  • Team building
  • Project scheduling
  • Project Management
  • Event coordination

Personal Information

  • Date of birth: 07/29/88
  • Nationality: Egyptian
  • Marital status: Married

Languages

English
Advanced

Timeline

Technical Office Head

AFCO STEEL - MEMBER OF MITWALLI STEEL GROUP
03.2016 - 11.2024

Structural Engineer

SAUDI BIN LADEN GROUP - SBG ABCD
07.2014 - 03.2016

Structural Engineer - Team Leader in technical Office

Al-AWAD Contracting GROUP
05.2013 - 06.2014

Structural Engineer

Al-AMAR CONSULTING GROUP
11.2012 - 05.2013

Technical office Engineer

Al-Zain Engineering Studies & Real Estate Investment Co.
06.2011 - 11.2012

Surveying Engineer

SMT Consulting Group
07.2010 - 05.2011

Site Engineer

Ginza for Constructions & Real Estate Development
06.2009 - 09.2009

Intern

Unit of Surveying - Ain Shams University
06.2008 - 09.2008

B.Sc. Civil Engineering -

Ain Shams University
06.2005 - 06.2010
MOSTAFA MOHAMED REDA OTHMAN