Experienced Senior Site Engineer with 10 years of expertise in concrete works and high-quality finishing across major projects, including commercial, administrative, luxury residential, heavy industrial, malls, hotels, villas, resorts, and ports. Worked with leading companies in the Middle East, gaining strong skills in site management, team coordination, and ensuring high standards in quality and safety. Recognized for commitment to excellence and delivering complex projects within deadlines and budgets.
Project : Marriott Resort, Sindalah Island, NEOM Region
Main Consultant : AECOM
Main contractor : BEC Arabia
Responsibilities :
1. Spearheaded the construction of structural, finishing & Fit - Out works for:
- Multi - storey luxury hotel (55 Rooms).
- Main building including back of house and F&B.
- 18 villas ( 12 one bed room - 6 two bed rooms).
- landscape.
2.Delivered quality work within a Fast-track schedule for one of NEOM'S flagship projects.
3. Partnered with AECOM consultant to streamline workflows, ensuring project milestones were achieved under strict NEOM guidelines.
Project : Mall and garage of Monorail station
Main Consultant : Pavilion Engineering Consultants
Main Contractor : INEX Contracting
Project consists of:-
2 Basements 16800 m2.
4 Buildings ( Ground + 3 Typical Floors + Roof + Top Roof ).
Watania Fuel Station.
Responsibilities :
Review and approve construction drawings, ensuring compliance with required specifications and standards.
Oversee the implementation of concrete and finishing works according to the approved technical specifications.
Develop and monitor a detailed schedule to ensure timely execution of project.
Manage and coordinate all stakeholders, including contractors, suppliers, and sub consultants, to ensure smooth project progression.
Ensure all phases of the project are executed according to the highest quality standards.
Supervise the final handover process to the client after reviewing and approving completed works.
Project : MDF Factory ( Heavy Industrial)
Main Contractor : Rowad Modern Engineering
Main Consultant : COSMOS
Responsibilities :
1. Concrete Works Supervision
Oversaw the execution of concrete works for critical heavy industrial structures, including the Silos, Substations, Energy Plants, warehouse, workshops, conveyors, tanks and Recycling Silo (Slip Form).
Supervised the construction of industrial facilities such as Pipe Racks, Press Exhaust Building, Dryer Building, and Main Fan Stages.
2. Managed all finishing works across the site post-concrete phase to ensure high-quality standards.
Project : BASIN 2 CONTAINER TERMINAL WORKS DREDGING, RECLAMATION AND OFFSHORE PORT CONTRACT
Main Consultant : Jacobs
Main Contractor : Rowad Modern Engineering
Responsibilities :
1. Supervised the following structural elements:
Administration Zone (4 linked buildings )
Oil separators, lift stations, substations and workforce building.
High masts lighting poles, entry and exit gates, and other critical facilities.
2. Infrastructure Works
Oversaw the execution of roads,stacks and refer gantries
Monitored the installation of lines such as storm water systems, potable water networks, shield, domestic, fire fighting, Mv, Lv, data and channel drains.
3. Prepared and submitted progress reports, tracking project timelines and deliverables for assigned zones.
Project : New Administration Capital Residential Neighborhood (R5)
Main Consultant: ECG
Main Contractor: Rowad Modern Engineering
Project Consists Of :-
35 Residential buildings comprises of 2 basement + 7,9 typical floors + Plaza Around each 5 Buildings
8 Residential buildings comprises of 3 basement +27 typical floors
All Slabs are Post Tension
Luxury High End Finishing
Responsibilities :
Supervising structural works for cluster consisting of 5 buildings with heights ranging from 7 to 9 floors + 2 basements + a centeral plaza) with total area 12,600 square meters.
Overseeing the finishing works of the MOKE-UP unit delivered to the New Urban Communities Authority (NUCA) and ensuring it's approval.
Supervising High-end luxury Finishes for all buildings within the cluster.
Project : Administrative Buildings For Military Intelligence
Main contractor : Wadi El Nile
Sub contractor : Al Farouq For Contracting and Trading
Project Consists Of :
Two buildings, each comprising 9 partitions, with a total area of 18,000 square meters per building.
Responsibilities:
Managing all finishing activities for Building B, partitions from 6 to 9 .
Coordination: Collaborating with the main contractor and other stakeholders to meet project requirements.
Progress Monitoring: Tracking the execution of works to ensure timely completion within the specified schedule.
Ensuring high-quality standards across all finishing works.
Project : Ezz Zone in Dubai Port
Owner : Ezz Steel Holding
Project Consists Of :
Terminal building - 2 Storage basins
5 Track loading Station - 4 Administration buildings
2 Sub Station - Fence With Sliding gate
Railway line - Infrastructure works
Trainee for 6 weeks and then i was employed in daily system - after proof of my abilities - until the completion of the study (on summer vacations and mid-year vacation)
Excellent team player
Microsoft Office
AutoCAD
Adobe Photoshop
Sketch Up
GIS
· Saudi Council of Engineers.
· Egyptian Engineers Syndicate.
· Student and researcher of Stanford University.
references will be available upon request
Mobile Number : +966535582638
Email Adress : mostafayoussef626@gmail.com