Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Intern

MUBASHIR AMIR

Planning Engineer
Swat Pakistan

Summary

An Engineer aiming to achieve excellence by providing optimum level of technical and managerial services with consistent quality improvements and exceeding goals. Ready to take-up any challenging task by utilizing my time and resource management skills along with my technical creativity. To improve workforce productivity and work quality by anticipating and eliminating potential delays through planning and coordination of man-power, material and equipment access.

Overview

8
8
years of professional experience
4
4
years of post-secondary education

Work History

Planning Engineer (Turnaround)

Maaden Phosphate Company Via Al-Suwaidi Industrial Services
Arar
2017.11 - Current
  • Initiate and conduct TA/Projects Kick off meeting.
  • Organize regular meeting with all key stakeholders for collect requirements.
  • Include reliability department future recommendations (Inspection & service vendors) & Run the forecast of all plant PM-Sets for 1.5 years for TA jobs.
  • Cost estimation and budget preparation.
  • Identification of the long Lead spares and prepare the bill of material.
  • Plan procurement management by considering different analysis, decision and estimates i.e. Make or buy analysis or decision, independent cost estimates etc.
  • PR creation for direct charge item (Non-Stock spares).
  • Updating and tracking of all consumable & spares with spare parts team.
  • Updating and tracking pre-fabrication activities.
  • Arrange site visit with outsource contractors.
  • Organizing workshop for worklist challenging and freezing.
  • Develop the master schedule (Define, Sequence, estimate activities & develop schedule) with all focal points consensus.
  • Ensuring change management plan, if any changes (addition/removal) to the scope once schedule was baselined/freeze.
  • Conduct risk workshops for risk identification & risk categorization.
  • Coordinate meetings with all contractors to ensure all selected bidder have common and clear understanding of scope of work.
  • Plan, manage and monitor communication with all stakeholders.
  • Updating and maintaining all project documents (I.e. Issue log, Risk register, Lesson learned register, procurement documents, change log etc.).
  • Arrange the daily TA/Project progress meeting during execution phase with management, EHSS and inspection department.
  • Publish daily management (Progress) report.
  • Highlighting the lead and lag activities on daily basis and reason of lag activities.
  • Monitoring and controlling of the critical path and all other slack activities.
  • RN creation for contractor invoices.
  • Prepare the close out reports.
  • Submit the close out notification.

Deputy Manager, E-III (Maintenance)

Maple Leaf Cement Limited
Mainwali
2015.03 - 2017.10
  • Ensuring smooth operation of Raw Mill, Coal Mill, Kiln and Clinker Cooler.
  • As a Team Lead facilitate my team.
  • Inter & Intra departmental coordination
  • Maintain high equipment reliability by proper implementation of preventive and predictive maintenance.
  • Processed all job entries by creating and completing work orders using EAM.
  • To plan, schedule, track and monitor shutdown activities.
  • Reviews/optimizes equipment spare parts requirements.
  • Indenting of spares by using ERP and assurance of spares in accordance to desired technical specification.
  • Assist outsource vendors in executing the job
  • 5S implementation for better housekeeping.
  • Above all ensure safety first.

Jobs performed as Mechanical Engineer:

  • Overhauling of Raw mill MAAG gear box.
  • Replacement of Raw mill and Coal mill grinding rollers bearings and seals.
  • Replacement of Raw mill hydraulic cylinder seals.
  • Replacement of Steel Cord Belt of both Raw mill & kiln Feed Bucket Elevators.
  • Replacement of Pre heater cyclones Dip tubes.
  • Replacement of kiln inlet & outlet lamella seals.
  • Maintenance work of grate cooler.
  • Replacement of clinker cooler cross bars, u-profiles, c-profiles, ADP, MFR, hydraulic jacks etc.
  • Performed other activities like maintenance/replacement of kiln inlet and outlet sector plates, clinker crusher hammers, hammer discs, grate bars, bearings etc.

Trainee Engineer (Mechanical)

Bestway Cement Limited
Hattar
2014.04 - 2015.03

During the above period I worked as a Trainee Engineer Mechanical in the following job areas.

  • Kiln
  • Raw Mill
  • Cement Mill
  • Workshop
  • Performed other associated duties as assigned.

Education

Bachelor of Science - Mechatronics Engineering

University of Engineering & Technology
Peshawar, Pakistan
2008.08 - 2012.07

Skills

    Primavera P6

undefined

Additional Information

Interpersonal and Team Skills

  • Active Listening.
  • Cross functional.
  • Conflict Management.
  • Meeting Management
  • Negotiation.
  • Facilitation
  • Influencing

Timeline

Planning Engineer (Turnaround)

Maaden Phosphate Company Via Al-Suwaidi Industrial Services
2017.11 - Current

Deputy Manager, E-III (Maintenance)

Maple Leaf Cement Limited
2015.03 - 2017.10

Trainee Engineer (Mechanical)

Bestway Cement Limited
2014.04 - 2015.03

Bachelor of Science - Mechatronics Engineering

University of Engineering & Technology
2008.08 - 2012.07
MUBASHIR AMIR Planning Engineer