Experienced Network & Passive Infrastructure Engineer with over 10 years in the design, installation, and management of copper and fiber systems. Skilled in structured cabling, FTTx, and data center preparation with proven ability to deliver projects on time and within budget. Proficient in AutoCAD, Visio, Fluke Tester, and OTDR, with strong problem-solving and analytical skills. Recognized for effective coordination with teams and consultants to ensure quality project handovers and customer satisfaction.
- Responsible for pulling Cat6 cables inside racks (rack-to-rack cross- connect).
- Managed the site activities and coordinated with the customer and subcontractor
- Supervised site activities for three weeks, coordinating with the customer and the main contractor on commissioning status.
-Ensured all systems within project scope were fully operational and met quality standards.
-Successfully handed over the project to the customer
- Acted as Site Engineer, overseeing execution of project activities.
- Performed Cat6 cable termination and testing, as well as fiber splicing and testing.
- Supervised data center preparation and readiness.
- Managed subcontractors to finalize project scope and ensure quality of work.
- Monitored and followed up with customer and main contractor regarding project updates.
- Prepared and submitted daily progress reports to the Project Manager.
- Ensured subcontractor works (cable termination, fiber splicing, etc.) met required standards.
- Received completed works from subcontractors and coordinated project handover to the consultant.
- Coordinated with customers on project updates and requirements.
- Attended and participated in site meetings with other contractors to align and coordinate works.
- Coordinated with the active team to finalize network and security scope.
- Successfully handed over the project to the consultant and client
- Developed port mapping documentation for the project.
- Prepared as-built drawings using Auto Cad
- Site Survey & Design Responsibilities
- Conducted site surveys to determine the required number of UTP cable nodes and related accessories (cable rolls, patch panels, modules, racks, UPS).
- Assessed fiber cable requirements, identified paths from each building to the data center, and calculated fiber quantities and related accessories.
- Estimated the number of network switches needed for each building.
- Prepared detailed documentation for each site, including material quantities and specifications.
- Managed multiple sites in coordination with Giza team.
- Monitored and followed up on progress with subcontractors to ensure timely delivery.
- Conducted site surveys and prepared lists of required materials for each site.
- Coordinated with the storehouse to ensure all materials were delivered on site.
- Handover of all completed tasks to the customer.
- Maintained daily follow-up with the customer regarding site progress.
- Reported daily updates to team leader and Project Manager.
- Coordinated effectively with subcontractors and customers to finalize project scope
#Project Engineer Responsibilities
- Reviewed and checked material submittals with the customer, ensuring compliance with consultant requirements, including:
1-Structured Cabling System (Panduit)
2-Data Network Switches (Aruba)
3-Data Network Racks (Gamma)
4-Data Network UPS (Eaton)
- Reviewed all IFC & IFT drawings and performed quantity surveying for the project.
- Acted as Site Engineer, managing site activities and ensuring progress within project scope, including:
1-Termination and testing/commissioning of ~12,000 UTP cable nodes.
2-Fiber splicing, testing, and commissioning of ~8,000 cores fiber optic cables.
3-Installation of 190 network switches and patch cords.
4-Installation, powering, and testing of 200 UPSs (5KVA & 3KVA).
5-FTTH solutions deployment, including splitters and fiber patch cords, ensuring full network functionality.
- Coordinated with other teams to ensure project scope completion.
- Reviewed and validated subcontractor invoices.
- Participated in meetings with the customer to review project scope and progress.
- Developed port mapping documentation for the entire project.
- Prepared detailed as-built drawings using Auto Cad.
Project Engineer – Ahmed Hamdy Tunnel, Suez (Cairo)
Site Engineer – El Sadat Industrial Zone
Structured Cabling Engineer – Al Alamein City, Downtown 2
Network Site Engineer – Mercedes-Benz Office, Cairo
ICT Passive Infrastructure Engineer – City Center, Alexandria
Data Center Preparation – QNB (Qatar National Bank)
Network Site Engineer – Helwan Fertilizers Company
-Acted as Site Engineer, managing site activities and ensuring progress within project scope, including:
1-Termination and testing/commissioning of 10,000 UTP cable nodes.
2-Fiber splicing, testing, and commissioning of 12,000 cores fiber optic cables
*Coordinated with other teams to ensure project scope completion.
*Reviewed and validated the shop drawings with the customer
*Participated in meetings with the customer to review project scope and progress.
*Developed port mapping documentation for the entire project.
*Prepared detailed as-built drawings using Auto Cad.
-Comm Scope
2- Le grand
3- LEVI TON