Summary
Overview
Work history
Education
Skills
Languages
Certification
Timeline
Generic
MUHAMMAD ABDULLAH

MUHAMMAD ABDULLAH

Jubail,Eastern Province

Summary

I am a piping engineer with over 5 years of experience in the oil and gas industry. I have worked on various projects, both onshore and offshore, and have gained a wealth of knowledge in this field. I am competent in using different software packages for design and analysis, as well as having a good understanding of construction methods. I am an effective communicator who is able to work well within a team environment.

Overview

5
5
years of professional experience
19
19
years of post-secondary education
1
1
Certification

Work history

Piping Engineer

SEPCO ARABIA
JIZAN, Saudi Arabia
12.2019 - Current
  • Review general arrangement and isometric in conjunction of P&ID. Review contract document, project specifications and scope of supply.
  • Preparation of field engineering queries and co-ordination with a designer team.
  • Submission of Method of Statement, Job Safety Analysis and Construction Documents.
  • Reviews and provides comments/approval package prepared by a contractor.
  • Detailed study of Scope work, drawing & specification and evaluating drawings prior to site execution.
  • Evaluation of materials Aramco & Contractor supplied and prepared site erection materials prior to site execution.
  • Detail review of ARAMCO contract line items and provide feedback on our contracts if there are some changes in Piping ( ISO, P&ID and SIS) and Hydro Test (HYD) and make relines and get approved from client..
  • Handling all piping technical queries and investigating all piping problems.
  • Ensure the pipe spools, valves, flanges and fittings should be proper storage and handling.
  • Site survey and implementation of work according to the drawings.
  • The preparing Tie-In package gets approved from Client and operation
  • Supervise the fabrication and erection of pipe spools.
  • Supervise the transportation of pipe spools from lay down to site and stringing and welding of pipe and spools.
  • Check and monitor the site activities in accordance with the project quality plan and specifications.
  • Prepare and review the hydro package and coordinate with a Quality Team.
  • Verify and inspects the fittings, gaskets, valves , Orifice plate, Flow element, Support & guides and flange are installed as per specification and bill of materials of approved ISO and P&ID and request for Inspection to quality department .
  • Line check prior to the hydro test, to verify the entire work in the test limits has been completed as per isometric and project quality control procedure/specifications/standards and giving punches as per category wise, like “A- before hydro it should be clear, B- after hydro it can be clear etc”
  • Prepare detailed records and reports on all inspections conducted at site and maintain the quality control documentation.
  • Make and review the weld summary sheet and attach NDT reports with a summary and also update QC comments log daily and request balance NDT reports to NDT co- coordinator .
  • Submitting the inspection requests to the client for various piping inspections in accordance with the approved inspection and test plan.
  • Complete system walk through with contractor and company.
  • Verifying the calibration certificates of pressure testing equipment pressure gauges, pressure relief valve and manifold.
  • Responsible for the hydro test activities and the witnessing of the hydro test and flushing and internal cleaning of piping.
  • Raised & submit RFI to PID & PMT project inspector during hydro test , bolt torquing , valve installation , fit up , thread joints and modification .
  • After the hydro test, install all remaining B punch items ( Globe valve , MOV , AOV , PV , ZV,FE,RO , Equipment Connection , Clearance , Insulation , ...etc ) and request to quality department for package reinstatement inspection .
  • Prepare and review the Leak test and Service test packages .
  • Conduct per-commissioning and commissioning activity ( Chemical cleaning , water flushing , Oil Flushing , Leak test , Service Test , Steam blowing ... etc ) with QCI , PID , PMT and SAP .

Mechanical & Piping Quality Inspector

Descon Engineering Limited Co
Lahore, Pakistan
06.2018 - 08.2019
  • Verify and inspects the fittings, gaskets, valves , Orifice plate, Flow element, Support & guides and flange are installed as per specification and bill of materials of approved ISO and P&ID .
  • Equipment & Spool Inspection prior to hydro test, to verify the entire work has been completed as per isometric and company quality control procedure/specifications/standards and giving punches as per category wise .
  • Responsible for the hydro test activities and witness of hydro test and flushing and internal cleaning of piping.
  • Prepare Inspection reports and make record in project file .

Education

Matric - Since

Govt High School Nizamabad
Wazirabad , Pakistan
03.1999 - 03.2011

Diploma of Higher Education - Mechanical

Board of technical Education
Lahore , Pakistan
08.2011 - 08.2014

Bachelor of Science - Mechanical

University of Engineering and Technology
Lahore , Pakistan
09.2014 - 05.2018

Skills

  • AutoCAD
  • Microsoft Office ( Excel , Word & Power Point)
  • Photoshop
  • Delcam
  • Primavera P6
  • Tubo bend
  • Coral Draw
  • ASNT NDT Level-II (PT, MPT & UT)
  • Test plan execution
  • Strong communication
  • Technical problem-solving
  • Leading technical teams
  • Mechanical reporting
  • Mechanical component design
  • International and Saudi Aramco Standard Knowledge

Languages

English
Upper intermediate
Urdu
Native
Arabic
Elementary
Punjabi
Native

Certification

  • ASNT NDT Level-II (PT, MPT & UT)
  • Auto CAD - Mechanical & Civil
  • Microsoft Office ( Excel , Word & Power Point)
  • Work Permit Receiver ( Saudi Aramco Approved )
  • Primavera P6




Timeline

Piping Engineer

SEPCO ARABIA
12.2019 - Current

Mechanical & Piping Quality Inspector

Descon Engineering Limited Co
06.2018 - 08.2019

Bachelor of Science - Mechanical

University of Engineering and Technology
09.2014 - 05.2018

Diploma of Higher Education - Mechanical

Board of technical Education
08.2011 - 08.2014

Matric - Since

Govt High School Nizamabad
03.1999 - 03.2011
MUHAMMAD ABDULLAH