Experienced Civil Site Engineer with expertise in managing construction projects from start to finish. Proficient in civil engineering principles and industry-standard software, with a proven track record of delivering projects on time and within budget. Skilled in site inspections, issue resolution, and ensuring compliance with regulations and safety standards. Proactive, reliable, and committed to delivering outstanding results

Overview

5
5
years of professional experience
6
6
years of post-secondary education
2
2
Languages

Work History

Civil Site Engineer | Project Engineer

Saudi Bilda Contracting Company
Riyadh
11.2021 - Current

Currently working as a Civil Site Engineer | Project Engineer in this private firm in Riyadh, Saudi Arabia My role includes:

  • Assist in developing project plans, including timelines, budgets, and resource allocation, to ensure that project is executed efficiently and effectively.
  • Review design documents to ensure that they meet project requirements and comply with relevant standards and codes.
  • Supervise construction process, including monitoring progress, ensuring compliance with design specifications, and coordinating with suppliers and other stakeholders.
  • Monitor and ensure that work is completed to required quality standards, including conducting inspections and testing materials in concerned labs.
  • Identify potential risks and develop strategies to mitigate them, ensuring that projects are delivered safely and efficiently.
  • Maintain accurate and up-to-date project documentation, including project plans, reports, and other records.

Major Construction Projects:

  • Commercial Mall Building, Buraidhah - Qaseem (RCC Structure)
  • Ahmad Al Falaj Mosque, RIYADH (RCC Structure)
  • Alderaa Shopping Mall, Riyadh (RCC & Finishing Works)

Scope of Work:

  • Quality Control at site.
  • Complete Survey of site and transferring Grid Lines using total station.
  • Marking location of work for various sub-contractors and transferring levels for various activities.
  • Setting out site and checking levels, coordinates throughout project.
  • Overlooking all construction activities i.e. Earthwork, Steel Reinforcement, Concrete Pouring, Block Works, facade works, Plumbing, Tiles Fixation, Laying of Pavement etc.
  • Collecting Concrete and tarmac samples and sending them to laboratory for testing to ensure quality.
  • Preparing RAMS and ensuring safety at work site.
  • Raising RFI for any discrepancies in IFC Drawings.
  • Issue and close NCRs with different trades.
  • Supervising all temporary works activities and ensuring CDM regulations at work site.
  • Conveying complex terms in layman language to laborers and ensuring work is done as per drawings.
  • Preparing IPC (Interim Payment Certificate) for work done and taking approval from consultant and client.
  • Coordinating and supervising all sub-contractor activities and processing their invoices.
  • Processing/Checking Sub Contractor Bills and reconciling of Work Done with IPC paid from Client.
  • Preparing shop drawings and as built drawings throughout project.
  • Monitoring Project plan on Oracle Primavera P6 and preparing reports for Monthly Progress meetings
  • Preparing Procurement Schedules and arranging timely delivery of required material on site i.e. Steel, Concrete or backfill material.
  • Preparing Cost Analysis for various ongoing activities and ensure work is done as per Budgeted Cost.
  • Successfully delivering each project within time and budget.

Cost Estimator | Quantity Surveyor

International Estimation Solutions
Lahore
02.2021 - 11.2021

Served as a Cost Estimator in this firm.

  • I dealt with US and UK based projects to determine approximate cost of construction project by analyzing plans and specifications of a project and breaking down cost of each component, such as labor, materials, equipment, and other expenses, to estimate total cost of project.
  • My role included using Planswift & BlueBeam Revu for quantity take-off and preparing the bill of quantities on excel spreadsheets by researching and analyzing prices for materials and labor.

AUTOCAD Trainer

University of Lahore, NAVTTC
Lahore
11.2020 - 02.2021
  • Served as AUTOCAD 2D & 3D Trainer at NAVTTC, KAMYAB JAWAN PROGRAM of Prime Minister, held in University of Lahore.

Design Engineer

AXONS Associates
Lahore
11.2020 - 02.2021
  • Bill of quantities & designing of columns, beams, slabs and other structural components is included in role as design engineer in this organization.

Trainee Engineer

Shahid & CO, DHA Gujranwala
Gujranwala
08.2020 - 10.2020
  • Supervision and monitoring of site work for Construction of drain lines on both sides of roads
  • Quality assurance and precision of execution as per drawings, levels and bar bending schedules.

Internee

Master City Gujranwala, Roots School Construction
Gujranwala
07.2019 - 08.2019
  • Monitored and supervised construction work (Layout and Markings, Earthwork, Steel Reinforcement, Concrete Pouring, Block Works) at site.

Internee

GDA WASA
07.2018 - 08.2018
  • Construction of Man holes and pipe-lines
  • Monitored and managed site work for Construction of two man-holes and 2 KM sewerage pipe-line

Education

Bachelor of Science - Civil Engineering

University of Engineering & Technology, Lahore, Pakistan
09.2016 - 08.2020

GPA: 71.25 %


FSc - Engineering (Pre-Engineering)

Punjab College of Sciences, Pakistan
10.2013 - 08.2015

GPA: 88 %

Skills

    AUTOCAD

undefined

RESEARCH | PROJECTS | EXTRACURRICULAR

  

RESEARCH & PROJECTS 

Publications on Numerical Simulation of Confined Masonry Wall (FEM) (In Process)

  • Currently working on publications for research project of Numerical Simulation of Confined and Unconfined Masonry walls. The working has been done on ANSYS APDL using Finite Element Modeling Method to study the difference in their ultimate strengths and deflections by comparing their push-over curves.

Multi-story Building Design

  • Designed and analyzed the building in ETABS against gravity and earthquake loading. Designing of selected structural members was also part of this project. Data of each story against different loadings and frequencies of earthquakes was evaluated, stored and compared for the best possible outcome is terms of strength and sustainability of structure.

Estimation of Complete House Building

  • Estimated the cost and quantity of each step and component used in the construction of a house from excavation to white-wash.

Double Story House Design

  • Proposed a structural scheme and designed it’s structural members on AUTOCAD i.e. beams, columns, lintels and slabs.

Scheduling on Primavera P6

  • Scheduled a complete project on Primavera P6 during a certified 2 day workshop. All the steps including navigation toolbars, defining EPS, OBS & WBS, defining of resources, roles, codes & budgets, creating new calendars to customizing and printing of reports were practiced in detail.

Documentary on Gypsies

  • Prepared a complete documentary on the life of gypsies as a term project. Visited their place (alongside River Ravi then) and tried to cover every single detail about their lifestyle. Documented the issues faced by them and tried to enlighten them further through the visuals

Documentary on SOS Children’s Villages Pakistan

  • Prepared another term project documentary on lives of children studying and living at SOS Villages. Visited their class rooms & hostels, played fun games with them and interviewed the staff to shed light on the issued faced by them in dealing with those children.

  

EXTRACURRICULAR ACTIVITIES 

  • Served as a Manager of Documentation & Planning in ICE STUDENT CHAPTER UET LAHORE. My role included the preparation of pre & post event reports, feasibility reports, proposals, letters, emails & invitations. Plus, hosted a number of seminars and public speaking campaigns including opening and closing ceremonies. Worked as a content and caption writer for its social media’s posts and pages, too.
  • Participated in organizing technical and non-technical modules in event named as CIVCON held by ICE for consecutive three years. Furthermore, introduced a technical module named ‘Building Empire’ in the same event. This module comprises of constructing a sustainable and elastic two story building using wooden sheets and Balsa Sticks. The model was tested on earthquake table with gradually increasing the load & frequency of table

Timeline

Civil Site Engineer | Project Engineer - Saudi Bilda Contracting Company
11.2021 - Current
Cost Estimator | Quantity Surveyor - International Estimation Solutions
02.2021 - 11.2021
AUTOCAD Trainer - University of Lahore, NAVTTC
11.2020 - 02.2021
Design Engineer - AXONS Associates
11.2020 - 02.2021
Trainee Engineer - Shahid & CO, DHA Gujranwala
08.2020 - 10.2020
Internee - Master City Gujranwala, Roots School Construction
07.2019 - 08.2019
Internee - GDA WASA
07.2018 - 08.2018
University of Engineering & Technology - Bachelor of Science, Civil Engineering
09.2016 - 08.2020
Punjab College of Sciences - FSc, Engineering (Pre-Engineering)
10.2013 - 08.2015
Muhammad DanishCivil Site Engineer | Project Engineer