Summary
Overview
Work history
Education
Skills
Area of Expertise
PROJECTS (+14 Megawatt Solar)
Accomplishments
References
LANGUAGES
Work preference
Timeline
Generic
MUHAMMAD HARIS

MUHAMMAD HARIS

Riyadh,Saudi Arabia

Summary

Electrical Engineer with 5+ years of experience in utility and commercial-scale LV system projects, electrical power systems, 132 kV grid operations, high-voltage equipment, testing and commissioning, and site supervision. Experienced in the execution and commissioning of low-voltage and low-current systems projects, coordinating contractors and vendors, resolving technical issues, supporting project delivery, and maintaining safety and quality standards. Adept at interpreting technical drawings and ensuring compliance with NEC and IEC standards.

Overview

3
3
Languages
7
7
years of post-secondary education
5
5
years of professional experience

Work history

Site-Engineer

ASSAS CONSTRUCTION
Riyadh, Saudi Arabia
2025.02 - 2026.06
  • Supervised and coordinated electrical installation works at site as per approved drawings, specifications, and project requirements.
  • Managed installation, testing, commissioning, and troubleshooting of electrical systems and equipment.
  • Coordinated with contractors, vendors, consultants, and site teams to ensure smooth project execution.
  • Conducted site inspections to ensure compliance with electrical standards, safety procedures, and quality requirements.
  • Prepared daily progress reports, monitored work schedules, and followed up on materials, manpower, and site activities.
  • Managed project timelines for timely completion of tasks.

Site Engineer

ACES COMPANY
Riyadh, Saudi Arabia
2023.01 - 2024.12
  • Executed and supervised LV system projects from project initiation through commissioning and handover.
  • Coordinated and supervised contractors, vendors, and site teams to resolve technical and execution issues.
  • Supported the testing and commissioning of electrical systems, including low-current and low-voltage systems, to improve system efficiency.
  • Provided technical troubleshooting and support for installed systems and site-related issues.
  • Supported the design team with technical proposals, project consultations, and execution requirements.
  • Prepared daily progress reports for the Project Manager, highlighting completed work, project updates, and issues requiring attention.
  • Maintained focus on safety compliance, quality standards, and proper site execution.

Project Engineer

REON ENERGY COMPANY
Lahore, Pakistan
2021.10 - 2022.12
  • Executed and supervised on-grid Solar PV projects from project initiation through commissioning and handover.
  • Coordinated and supervised contractors, vendors, and site teams to resolve technical and execution issues.
  • Led and supported testing and commissioning activities for installed electrical and Solar PV systems.
  • Provided technical troubleshooting and support for installed systems and site-related issues.
  • Supported the design team with technical proposals, project consultations, and execution requirements.
  • Prepared daily progress reports for the Project Manager, highlighting completed work, project updates, and issues requiring attention.

Education

B.Sc - Electrical Engineering

UET (University of Engineering and Technology)
Peshawar
2014.09 - 2021.09

Skills

  • LV system expertise
  • Electrical maintenance and troubleshooting
  • Project execution and commissioning
  • As-built drawing review
  • BOQ preparation
  • Vendor management
  • Site supervision
  • Team leadership
  • Microsoft Office proficiency

Area of Expertise

Electrical Engineer | LV System Testing and Commissioning | Electrical Installation & Maintenance | Project & Site Supervision | Safety Compliance

PROJECTS (+14 Megawatt Solar)

4.9 MW – Gadoon Textile Mills, Swabi , Pakistan, 

4 MW – Gadoon Textile Mill Limited, Swabi , Pakistan, 

3 MW – ZRK Group of Industries, Mardan, Pakistan, 

1.6 MW – Nishat Mills Limited, Bhikki, Pakistan

Accomplishments

  • Boosted Project Efficiency
  • Increased project efficiency by 20%, reducing completion time through improved site coordination.
  • Delivered Solar Projects
  • Led installation of over 13 MW of solar power, ensuring timely and safe project delivery.
  • Enhanced Safety Compliance
  • Improved electrical safety compliance, achieving zero safety incidents across three major projects.
  • Decreased Material Costs
  • Reduced material costs by 15%, optimizing resource allocation for solar PV installations.

References

References available upon request.

LANGUAGES

English Fluent
Fluent
Urdu Fluent
Fluent
Arabic Basic
Beginner

Work preference

Work Type

Full time

Timeline

Site-Engineer

ASSAS CONSTRUCTION
2025.02 - 2026.06

Site Engineer

ACES COMPANY
2023.01 - 2024.12

Project Engineer

REON ENERGY COMPANY
2021.10 - 2022.12

B.Sc - Electrical Engineering

UET (University of Engineering and Technology)
2014.09 - 2021.09
MUHAMMAD HARIS