CAREER OBJECTIVES: To obtain an opportunity that challenges my experience and expertise in order to enhance my professional development and personal growth.
Overview
7
7
years of professional experience
4
4
years of post-secondary education
2
2
Languages
Work History
Project Engineer
Tetra Tech
11.2021 - Current
Process solution Saudi Arabia (Al-Safi
Rocessing plant Saudi Arabia) from
Project Engineer
Tetra Tech
03.2019 - 05.2020
Process solution Saudi Arabia (Almarai CPP1, CPP2, CPP3 and western bakery plant Saudi Arabia)
Project Engineer
The Erectors Engineering Company, PepsiCo green
03.2018 - 02.2019
Field project Multan, Pakistan, Shair Shah industrial Estate plant Multan)
Project Engineer
The Erectors Engineering, Engro Food plant Pakistan Ltd
08.2017 - 03.2018
Project Engineer
The Erectors Engineering, Nestle Pakistan Ltd
06.2015 - 08.2017
Project Supervisor
Tetra Pak
03.2015 - 06.2015
Project at Coca-Cola green field project Multan, Pakistan (Shair Shah industrial Estate plant Multan)
Project Supervisor
The Erectors Engineering, Unilever Soap Plant Rahim Yar khan
11.2013 - 12.2014
Trainee Engineer
Metal Forming, Workshop Lahore
09.2012 - 03.2013
Environmental Sustainability:
Managed the work site manpower and distribute working groups according to work load
Managed Client inspection team for ongoing and upcoming works
Deeply briefing with working groups about project load and importance
Inspection and Record of Progress of Working Groups
Managed ongoing and upcoming project as per P&ID
Daily Maintain tool box talk with workings Groups and solve site issues
Monitor site Material for ongoing works and tracking
Managed site safety inspection team and make sure work as per HSE team guidance
Conducting site internal environmental meetings with working groups
Environmental incident management and its action plan closure with HSE team
Ob Responsibilities: -
Study Scope of work and prepared bidding documents
Study Drawings and preparation of competitive bids
Estimation of technical and commercial aspects bid
Prepare quotation and share with project department
Prepare initial project plan and share with project department
Prepare scope of work documents
Coordinate with design team regarding equipment layout design
Coordinate with client and sub-contractors for queries and clarification
Support and advise of working groups about project P&ID and technical issues
Coordinating and monitoring assigned projects
Interacting daily with clients to interpret their needs and requirements and representing then in field
Cooperate and communicate effectively with project manager and other project participation to provide assistance and technical support
Co-ordinate with project supervisor and Rigging supervisor regarding ongoing and upcoming Activities
Execution of project as per plant layout and P&ID
Managed ongoing & upcoming project Material and records
Attending client project Activity Meetings and planning work upon meeting calls
Monitoring of Site working groups Activities
Support and advice about project Equipment’s (silos, Chillers Cooling towers, auto packaging machinery, Piping, tubes etc.)
Support and advise during installation of piping as per ASME codes
Managed site Supervisors according to work load
Managed project execution and Commissioning
Inspection and records of Fabrication and installation of equipment
Environment and Social Field Consultant at Tetra Tech Coffee International, Tetra TechEnvironment and Social Field Consultant at Tetra Tech Coffee International, Tetra Tech
Civil 3D Modular (Infrastructure Wet & Dry Utilities) at M/s. China Harbour Engineering (CHEC)Civil 3D Modular (Infrastructure Wet & Dry Utilities) at M/s. China Harbour Engineering (CHEC)