Summary
Overview
Work History
Education
Skills
Affiliations
YEARS OF EXPERIENCE
NATIONALITY
Timeline
Generic
MUHAMMAD NADEEM

MUHAMMAD NADEEM

Al Riyadh

Summary

Accomplished Senior Project Manager with over 18 years of proven expertise in leading complex construction and infrastructure development initiatives across the Middle East and South Asia. Extensive experience encompasses vertical construction and large-scale infrastructure projects, including residential communities, road networks, tunnels, airports, and mixed-use developments. Adept at steering multidisciplinary teams, enforcing rigorous quality standards, and delivering projects on time, within scope, and budget. Skilled in fostering strong collaboration with clients, consultants, and contractors to anticipate challenges and implement effective solutions that maximize project outcomes. Notable accomplishments include managing pivotal stages of landmark projects such as the Saudi Green Energy Projects, ROSHN Sedra Development, Diriyah Gate, and King Khalid International Airport Projects, alongside leading infrastructure works for the Ministry of Housing Project in Tabuk, KSA, and utility tunnel installations in Lusail, Qatar. Proficient in Primavera P6, Auto-CAD, and advanced project management frameworks, with a strategic focus on quality assurance, regulatory adherence, and driving innovation to support continuous operational excellence.

Overview

19
19
years of professional experience

Work History

Senior Manager, Project Management Compliance

Jinko Solar Energy Manufacturing Company
06.2025 - Current
  • Project: 10GW High-Efficiency PV Cell and Module Project - NEOM Saudi Arabia.
  • Project Responsibilities:
  • As Client representative, Acted as the key point of contact for all stakeholders, ensuring alignment across project phases and timely communication of updates.
  • Led coordination with design consultants, ensuring compliance with project specifications and timely submission of deliverable.
  • Managed communication and submission processes with relevant authorities for obtaining permits and regulatory approvals.
  • Oversaw cross-functional team coordination, facilitating collaboration between engineering, procurement, and construction teams.
  • Organized and led weekly project meetings, driving progress reviews, tracking milestones, and addressing issues proactively.
  • Ensured follow-up on action items and maintained accountability across stakeholders and team members.
  • Provided continuous support to the project team to resolve challenges, mitigate risks, and maintain project momentum.
  • Project: ROSHN Sedra Development Project – Riyadh (Sep,2023 to June,2025)
  • Project Details: Vertical and Infrastructure construction work of Phase 3, 4 & 5.
  • Project Responsibilities:
  • Act as the main liaison for contractor-related matters, ensuring effective communication, issue resolution, and adherence to project specifications and deadlines.
  • Conduct regular site visits to monitor construction progress, quality, and safety standards, addressing any issues promptly.
  • Collaborate with engineers, architects, senior project managers, and subcontractors to optimize project delivery by coordinating schedules, resources, and tasks.
  • Enforce quality control measures, conducting inspections and audits to maintain construction standards and regulatory compliance.
  • Maintain comprehensive documentation of construction activities, including progress reports and correspondence with stakeholders.
  • Proactively identify and address construction challenges, fostering innovation and continuous improvement.
  • Provide leadership to the construction team, mentoring junior staff and promoting professional development.

Project Manager

Al Yamama Company
01.2021 - 09.2023
  • Project: Diriyah Gate Project, Riyadh KSA (February 2022 – September 2023)
  • Project Detail: Project includes Utility & Road, VIP, Gyratory tunnels, Super Basement, with mixed-use project over an area of 7 sq. km, with history and heritage assets at its core, enriched by entertainment, shopping, and residential elements.
  • Project Responsibilities:
  • Working as technical team lead to finalize project close out procedures.
  • Coordination meetings with Supervision consultant and PMC/Client.
  • Technical support for the closeout of Shop Drawings, WIR & As built drawings of executed works.
  • Coordination with construction teams for handing over the completed areas.
  • Construction site visits with consultant and client for taking over process and site handing over to another contractor.
  • Project progress/quality review meetings with Client and consultant.
  • Project: Rehabilitation of Delta Taxiway, KKIA Riyadh Airport – Saudi Arabia (Jan 2021 – Jan 2022)
  • Project Responsibilities:
  • Construction Management/Planning.
  • Executive meetings, Progress meetings, Quality meetings and Safety meetings with Consultant/Client.
  • Review of work progress on daily basis, Provides technical support to Project Manager.
  • Preparations of final handing over documents.
  • Resources alignments for ongoing activities like Milling works, Aggregate base course preparations, Asphalt works for taxiway, Final painting/marking works.
  • Project: Ministry of Housing (1, 098, 155 m²), KSA. Housing Society Development Project, Villas, Apartment buildings and Service buildings Including Infrastructure development works. MOH Tabuk, KSA
  • Project Responsibilities:
  • Primary responsibilities include supporting project design and supervising ongoing construction activities for infrastructure and vertical constructions by developers in various phases. This involves reviewing and approving contractor’s submittals, such as Shop Drawings, MIR (Material Inspection Request), ITP (Inspections & Test Plan), MS (Method Statements), and PTW (Permit to Work). Additionally, conducting site inspections through WIR (Work Inspection Request) as per the contractor’s planned work schedule is required.
  • Secondary responsibilities are to ensure Quality & Safety of work as per international standards. Preparing and maintaining Activity Log, Weekly/Monthly Progress Reports, and concise documentation.
  • Responsible for the supervision of Road, Civil & Infrastructure works including excavations of trenches, bedding, piping layout, Installations of Manhole rings, jointing and cover fixing.
  • Preparations of NCR (Non-Conformance report), SOR (Site Observations reports).
  • As safety Engineer (additional job) I was responsible to Arrange and manage all HS&E meetings in site office regarding HSE issues, weekly site walk, bulletins, safety committee meetings etc.
  • Conducting the Site visit with concern department and Preparation of weekly safety site walk report.

Senior Engineer

Parsons Corporations
07.2014 - 12.2020
  • Project: Ministry of Housing development Project
  • Project Responsibilities:
  • Primary responsibilities include supporting project design and supervising ongoing construction activities for infrastructure and vertical constructions by developers in various phases. This involves reviewing and approving contractor’s submittals, such as Shop Drawings, MIR (Material Inspection Request), ITP (Inspections & Test Plan), MS (Method Statements), and PTW (Permit to Work). Additionally, conducting site inspections through WIR (Work Inspection Request) as per the contractor’s planned work schedule is required.
  • Secondary responsibilities are to ensure Quality & Safety of work as per international standards. Preparing and maintaining Activity Log, Weekly/Monthly Progress Reports, and concise documentation.
  • Responsible for the supervision of Road, Civil & Infrastructure works including excavations of trenches, bedding, piping layout, Installations of Manhole rings, jointing and cover fixing.
  • Preparations of NCR (Non-Conformance report), SOR (Site Observations reports).
  • As safety Engineer (additional job) I was responsible to Arrange and manage all HS&E meetings in site office regarding HSE issues, weekly site walk, bulletins, safety committee meetings etc.
  • Conducting the Site visit with concern department and Preparation of weekly safety site walk report.

Construction Manager

Redco International W.L.L Doha
07.2011 - 07.2014
  • Project: 1- Qatar Airways Crew Accommodation Project – Doha, Qatar
  • 2- CP 1- Utility Tunnel Project – Lusail Qatar
  • Project Responsibilities:
  • Management and coordination of ongoing construction activities.
  • Witness along with the client representative and consultants the testing of materials and structures (e.g., concrete sampling, materials testing for building, etc.) if it conforms to the design / specifications of the international standards.
  • Conduct Inspection with Consultant to ensure the Site work.
  • Supervising labor and subcontractors to ensure that work is carried out in accordance with works procedures and instructions.
  • Responsible for Managing, monitoring, and supervising the construction activities i.e., Earthwork, Bedding, Blinding, RCC raft, waterproofing, Steel Erection, Concrete pouring, and Material Arrangements, formwork work, plastering, Painting and all other finishing works.
  • Aligned all resources to achieve daily/weekly/monthly scheduled targets. Took corrective and preventive actions throughout the project lifecycle to ensure timely delivery of targets.
  • Participating in client meetings and resolving client/engineering and management project issues.

Senior Engineer

National Engineering Services Pakistan (NESPAK)
09.2008 - 07.2011
  • Projects:
  • Construction of Main Highway Bagh to Rawalakot – Azad Kashmir – Pakistan
  • Bagh Ring Road Project – Pakistan
  • GOP Funding 400 Education facilities Project – Bagh AJK.
  • Project Responsibilities:
  • Preparations of non conformance reports and other technical reports.
  • Witnessing the testing of compressive strength of concrete at the 3rd party laboratory.
  • Apply and implement all quality control and quality assurance procedures on site.
  • Liaise with the site construction engineers and provide support.
  • Site execution of all construction activities as per planned schedule and project specifications, Planning and Execution of works as per design & drawing.

Civil Site Engineer

Kalim Siddique Associates
06.2007 - 09.2008
  • Projects Handled: Construction & Renovation of different Foreign Banks, Standard Chartered Bank, Barclays Bank, HSBC Bank & Dutch Bank in Islamabad Pakistan (Renovation, Interior, Landscaping etc.)
  • Project Responsibilities:
  • Assuring the acceptable quality of materials, processes, and workmanship in the project work.
  • Monitored the actions on site of the Contractor against the project specification and drawings and immediately notified the Resident Engineer of any non-conformity.
  • Attended Progress Meeting with the Client, Contractor, and Project Manager to monitor the progress of work against the approved program Carried out final inspection for certification of final completion and handing over of the works.

Site Supervisor

Technical Associates Pakistan
06.2006 - 06.2007
  • Projects Handled: Hosing Scheme No. 5 (C-166, 55000 SFT Covered Area) Housing society Infrastructure development project near Rahim yar khan palace.
  • Project Responsibilities:
  • All the routine duties of Site supervisor including quality assurance of works at the site.
  • Management of manpower

Education

Bachelor of Engineering - Civil Engineering

Preston University Islamabad
Pakistan
02.2006

Skills

  • Skilled in Data Collection, email communication, Analysis, Presentation and Report Writing
  • IT and Software Skills:
  • Engineering: AUTOCAD 2007
  • Office Work: Microsoft Office, (Word, Excel, PowerPoint)
  • Primavera P6 – April 2013 from MMTI – Qatar
  • Advanced Project Management Training – 2013 from MMTI - Qatar

Affiliations

  • Member Engineer – Saudi Council of Engineers, Registration No. Civil/812773 – SEC, KSA
  • PMP: Project Management Professional - 3026826
  • Member of PMI (Project Management Institute USA) – 2710972
  • Member of National Technology Council Pakistan – (Eng. Tech/Civil/00162)
  • CMAA Certifications (Construction Management association of America) – 203461

YEARS OF EXPERIENCE

18 years

NATIONALITY

Pakistani

Timeline

Senior Manager, Project Management Compliance

Jinko Solar Energy Manufacturing Company
06.2025 - Current

Project Manager

Al Yamama Company
01.2021 - 09.2023

Senior Engineer

Parsons Corporations
07.2014 - 12.2020

Construction Manager

Redco International W.L.L Doha
07.2011 - 07.2014

Senior Engineer

National Engineering Services Pakistan (NESPAK)
09.2008 - 07.2011

Civil Site Engineer

Kalim Siddique Associates
06.2007 - 09.2008

Site Supervisor

Technical Associates Pakistan
06.2006 - 06.2007

Bachelor of Engineering - Civil Engineering

Preston University Islamabad
MUHAMMAD NADEEM