MUHAMMAD RAFIQUE

Lahore

Summary

To get a chance of working in a dynamic organization, where my education, technical knowledge, aptitude for learning and problem solving abilities would be utilized and I shall get an opportunity to improve in my profession.

Overview

30
30
years of professional experience

Work History

Suprintendent (Civil)

Gulf Consolidated Contractors Co.
03.2022 - Current
  • Water Well 705 & 706 / 169/162 Jubail ANDR-1518 / ANDR-1512 / ANDR-3040 & SDGM Loop Project
  • Installation of Flow line and Well Piping
  • Installation of HDPE Liner with Stub End
  • Installation of Concrete Foundation and Steel Platform
  • Installation of Fence and Construct the R.O.W
  • Did the 650-meter HDD 41 pipeline crossing
  • Installation of Flow line and Tie-in to Manifold
  • Installation of Concrete Foundation and Steel Structure Pipe Support and Platform
  • Installation of Well Pad Fence and Removable Fence
  • Installation of FOC with Flow line with Cable Marker and Pipe Movement Marker

Suprintendent (Civil)

Gulf Consolidated Contractors Co.
09.2017 - 03.2022
  • Oil Well 523&524 Haradh/ ANDR- 1518/ ANDR-1512/ ANDR-3040 & SDGM Loop Project
  • To organize and execute civil construction activities in accordance with Saudi Aramco requirements and IFC Drawings
  • Installation of Fence Well Pad and Well Pad Extension
  • Construct Drain Pit and R.O.W / Barming and Camel Crossing
  • Installation of RTR Yellow Box pipe for Flow line
  • Installation of Modular Skid and Well head piping
  • Installation of Wellhead Platform and Remote Control Structure
  • Gas Well 36/39/56/82 MDRK /66/77 GHAZL /1367/1390/1372/1273 Haradh
  • Gas Well Modular Skid and Conventional Well
  • Installation of Modular Skid OPTF Skid Corrosion Shelter and Battery Room
  • Remove the Cellar Steel Casing and Construct the Concrete Cellar
  • Installation of Production line B.D line, Fill line, Kill line, Blower RTR line
  • Installation of Flow line and Tie-in to Manifold
  • Installation of Concrete Foundation and Steel Structure Pipe Support and Platform
  • Installation of Well Pad Fence and Removable Fence
  • Installation of FOC with Flow line with Cable Marker and Pipe Movement Marker
  • Water Injection Well 2556/2557 HWYH
  • Installation of Flow line and Well Piping
  • Installation of HDPE Liner with Stub End
  • Installation of Concrete Foundation and Steel Platform
  • Installation of Fence and Construct the R.O.W

Suprintendent (Civil)

Gulf Consolidated Contractors Co.
11.2014 - 09.2017
  • To organize and execute civil construction activities in accordance with Saudi Aramco requirements and IFC Drawings
  • To have a close coordination with SAPMT and SAPID for progress and quality, respectively
  • Overall management of Civil activities such as Excavation, Trenching, Pipe Lowering, Construction of Concrete Supports, Backfilling, Compaction, Concrete Pouring, and Asphalt Paving in accordance with Saudi Aramco Requirements
  • Overall supervision of pre-pouring activities like re-bar reinforcement, form works
  • To report to the Construction Manager for all construction activities, hurdles, hold-ups, and discrepancies in order to expedite the work
  • To coordinate with subcontractors (if any) for proper work organization, expediting progress, and maintenance of quality
  • To execute the work well in order to minimize deficiencies and take corrective actions within the agreed completion date (ACD), if any discrepancy will be found
  • To make arrangements with third parties for FDT, DFT, and fresh concrete tests, and for client approval wherever needed.

Superintendent Civil

Gulf Consolidated Contractors Co.
01.2014 - 10.2014
  • To organize and execute all civil activities in Khursaniyah Gas Plant (KGP)
  • Excavation and backfilling of Scraper Trap Receiver in accordance with Saudi Aramco Requirements and IFC Drawings
  • Construction of concrete foundation for Scraper Trap Receiver
  • Construction of thrust anchor block.
  • Construction of jib crane foundation
  • To make a detour plan for asphalt road crossing
  • Execution of open-cut asphalt road crossing and Restoration
  • Construction of duct bank for electrical cable
  • Coordination with SAPMT and SAPID for progress and Quality
  • Directly reported to Construction Manager

Superintendent Civil

Gulf Consolidated Contractors Co.
03.2011 - 10.2013
  • Install reinforced concrete foundations for thrust anchors, pipe supports, and pipe sleepers
  • For the scraper launcher, jib crane, valve supports, platforms, stairs, guard rails, and switch rack, including all excavation, earthwork, back-filling
  • Perform excavation, backfilling, grading, and paving, including an asphalt extension at the scraper launcher area
  • Install structural steel for pipe supports, platforms, guard rails, anchor sleeves, and anchor flanges for the pipe at the thrust anchor location.
  • Construction of new access roads, including excavation, backfilling, and grading, for accessing the New Scraper Launcher area
  • Extend the existing Type I fence at KM 19.00 valve stations
  • Perform all earthwork, excavation, backfill, embankment, and marl placement along the KRZTG-2 P/L
  • Construction of a new burn pit at km 19.00 valve station
  • Open cut asphalt road crossings and SSD-1 fence at KGP.
  • Construct camel crossings where indicated on the pipeline alignment plan and profile Sheets
  • Construct temporary lined evaporation ponds required for disposal of hydrostatic test fluids. Perform excavation, backfilling, grading, paving, fencing with gates, and an access road to the evaporation pond to fill the water for hydrostatic testing. The ponds are used for water retention
  • Construction of the RAS AL KHAIR scraper receiver and black powder filtration station area
  • To Install reinforced concrete foundations for thrust anchors and pipe supports/pipe sleepers
  • For the scraper launcher, black powder filtration station, jib crane, valve supports, platforms, stairs, guard rails, switch rack, burn pit, including all excavation, earthwork, Back-filling

Superintendent Civil

Gulf Consolidated Contractors Co.
11.2010 - 03.2011
  • Foam storage tank area concrete foundation
  • To coordinate with the client for quantity and quality of the work
  • Overall supervision of rebar reinforcement works and formwork prior to concrete pouring
  • Arrangements with ARAMCO-approved third parties for FDT and DFT.

Superintendent Civil

Gulf Consolidated Contractors Co.
02.2007 - 11.2010
  • Earth work and construction of valve station pads
  • Fence installation of valve stations per Saudi Aramco requirements.
  • Construction of Right of Way (ROW) for the QA-10 Pipeline
  • Concrete Pouring for Foundations
  • Construction of Precast Concrete Foundations at the Laydown Yard
  • To ensure that ongoing activities are in accordance with the approved project drawings, project specifications, applicable standards, approved method statements and ITP’s.
  • Responsible for monitoring civil activities in my areas, including excavation, backfilling, compaction, formwork, rebar, embedded items, concrete pouring, Concrete pouring and Protection
  • Supervision of fence installation, in-place casting of concrete pipe supports, and thrust anchors in accordance with Saudi Aramco Standards

Superintendent Civil

Gulf Consolidated Contractors Co.
01.2006 - 02.2007
  • Fabrication and construction of pipe support platforms
  • To make the rebar schedule and installation of rebar
  • To arrange survey setting-out data with the Land Surveyor
  • Construction of marl road and camel crossing
  • Coordination with the subcontractor for thrust boring
  • Prepare the rock and sabkaha quantity and develop the rock calculating system
  • Installation of flow line and well jump overs
  • Construction of Railway Road Crossing in accordance with Saudi Aramco Standards

Superintendent Civil

Tamimi Company Construction Division
06.2005 - 01.2006
  • Fabrication and construction of pipe support platforms
  • To make the rebar schedule and installation of rebar
  • To arrange survey setting-out data with the Land Surveyor
  • Construction of marl road and camel crossing
  • Coordination with the subcontractor for thrust boring
  • Installation of flow line and well jump overs
  • Construction of Railway Road Crossing in accordance with Saudi Aramco Standards
  • Stringing of 12” pipe along the ROW

Supervisor Civil

Tekfen Construction & Installation Co.
04.2004 - 06.2005
  • To Arrange and arrange to shedgum topographic survey
  • Construction of Surge Relief Tank Area (Civil works)
  • Construction of pipe support platforms
  • To make the rebar schedule and installation of rebar
  • To arrange survey setting-out data with the Land Surveyor
  • Construction of marl road and camel crossing
  • Coordination with the subcontractor for thrust boring
  • Prepare the rock and sabkha quantities
  • Construction of Railway Road Crossing as per Saudi Aramco Standard

Supervisor Civil

Tamimi Company Construction Division
04.2002 - 04.2004
  • Installation of wooden Cooling Tower Sprinkler System
  • Civil works for Fire Fighting System
  • Civil works for Substation
  • Structural erection for palletizer area
  • Casting and installation of piping 6” ø and Stack foundation
  • Civil works for Re-melter Sump Steam Coil area

Site in-charge

Erection Engineer & contractors
09.1996 - 02.2002
  • Supervision of construction at site as per approved shop drawings & specifications and as per safety norms, reporting and resolving quality-related issues, and monitoring materials at site.
  • Handling site coordination of construction activities with other disciplines, providing technical inputs for construction methodologies and coordination with the Contractor/Sub-Contractor.
  • Conducting inspections on-site for checking concrete quality during casting, shuttering and de-shuttering, and curing, in full compliance with the project specifications, while being persistent in the strict observance of safety requirements.
  • Monitoring workmanship quality and ensuring that all contractual obligations are fulfilled and contract objectives are met.
  • Reporting to higher authorities for further guidance in case of any variation in strata with respect to the approved drawings, ensuring proper quality control in all items of work.
  • Review of Contractor’s shop drawings and RFIs with respect to the specifications, issued for construction drawings and BOQ.
  • Review of Contractor’s monthly evaluations, progress reports, etc., and participating in Technical Review Meetings & Progress Review Meetings.
  • Preparing bills for payments by estimating quantities and ordering materials for construction.

Education

Auto cad -

Petroman University Lahore
01-1998

diploma Certificate -

Draftsman
01-1995

Metric -

Govt. High secondary school Farooq Abad
01-1992

Custom

  • OSHA Training General Industry
  • Excavation Competent Person
  • First Aid & BLS
  • CSM (Construction Safety Manual)
  • Job Safety Analysis
  • Excavation & Trenching Safety
  • Fire Fighting / Hydrogen Sulfide (H2S) and SCBA
  • Heat Stress / Hazard Recognition
  • Emergency Response
  • Confined Space Entry / Confined Space Entry Supervisor
  • Incident Investigation Report

Personal Information

Father's Name: Muhammad Nazir

Timeline

Suprintendent (Civil)

Gulf Consolidated Contractors Co.
03.2022 - Current

Suprintendent (Civil)

Gulf Consolidated Contractors Co.
09.2017 - 03.2022

Suprintendent (Civil)

Gulf Consolidated Contractors Co.
11.2014 - 09.2017

Superintendent Civil

Gulf Consolidated Contractors Co.
01.2014 - 10.2014

Superintendent Civil

Gulf Consolidated Contractors Co.
03.2011 - 10.2013

Superintendent Civil

Gulf Consolidated Contractors Co.
11.2010 - 03.2011

Superintendent Civil

Gulf Consolidated Contractors Co.
02.2007 - 11.2010

Superintendent Civil

Gulf Consolidated Contractors Co.
01.2006 - 02.2007

Superintendent Civil

Tamimi Company Construction Division
06.2005 - 01.2006

Supervisor Civil

Tekfen Construction & Installation Co.
04.2004 - 06.2005

Supervisor Civil

Tamimi Company Construction Division
04.2002 - 04.2004

Site in-charge

Erection Engineer & contractors
09.1996 - 02.2002

Auto cad -

Petroman University Lahore

diploma Certificate -

Draftsman

Metric -

Govt. High secondary school Farooq Abad
MUHAMMAD RAFIQUE