Wireless Mobily-Ericsson Projects - Telecommunication Technician Jeddah-Saudi Arabia 08/2021 - 06/2023
Mobily-Ericsson Border Cleanup Project:
Mobily-Ericsson Hajj Project 2022:
Mobily-Ericsson B43 L1800 TRM Project:
Mobily-Ericsson FTK TRM New Sites Project:
Mobily-Ericsson APEX and HAJ Project:
- Managing site surveys, submission of Technical Site Survey
- Report (TSSR) as per the defined scope.
- Preparing the AAR reports as per the existing and proposed
- outdoor equipment to calculate the tower load.
- Installation of 30-port RF antennas under NEW sites scope.
- Installation of Feeder Cable, Indoor jumpers, Power DB, PDB, BDF, Rectifiers, RF Cable, VSWR, RF Cable grounding, Rooting of cable, Installation of Battery Bank
- Installation of RRU (B3, B1, B20, B41, B8) with 30-port antenna as per the SAF.
- Execution of HO3, HO5 and RSA sessions to achieve the maximum acceptance in PAT's.
- Troubleshooting and site rectification using Site Master, Visual Fault Locator (VFL) and Optical Power Meter (OPM).
- Coordination with all stake holders including RSA/QEHS and Implementation Team for successful and in time HO3 & HO5activities.
- Monitored and performed maintenance on telecommunications systems to facilitate optimal performance.
Wireless STC-Ericsson Projects - Telecommunication Technician Riyadh- Saudi Arabia 06/2019 - 07/2021
STC-Ericsson Aspiration MOD Project:
STC-Ericsson 5G Collocated Project:
STC-Ericsson TRM Aspiration Project:
STC-Ericsson 4G5 L2300 2nd Carrier Project:
STC-Ericsson 4G5 L2100 MIMO Project:
STC-Ericsson 4G5 L700 Project:
- New Sites installation including RBS6150 and outdoor equipment including 30Port Octa and Penta band antennas and ERS of all technologies.
- Jumper connectivity of ERS as per mentioned frequency channel on all types of antenna ports.
- Installation of all type of MW antenna till 2.4M and IF cable routing as standard.
- Installation of New links (Customer + Xpic SD as well) and make them Ready for PAT. Troubleshooting of alarms. Clear the XPD, External & Internal Interference issue.
- Installation of all types of ML including ML6692, ML6693, ML6691 and TN nodes.
- Installation of AIR6488 unit for 5G under Ericsson-STC 5G aspiration scope.
- Installation of All types of ERS including B8 for L700, B1B3, B3 for MIMO and L2100 and B41 for second carrier of TDD.
- Installed and configured new devices and system components. Communicate with the customer to ensure satisfaction and implement any necessary corrective actions. Interface with cross functional work teams such as field applications, customer support/services, product management.
- Performed regular inspections of telecommunications systems to identify and repair any potential issues.
- Successful execution of MDTs /cutover, swap activities.
- Strong command and understanding of all types of PATS (E-PAT, C-PAT, Field-PAT, Office-PAT).
- Priorities P0/P1/P2 sites and make the PAT plan accordingly. Coordination with MS/Ericsson IMP team for NPTS acceptance once field PAT done.