Summary
Overview
Work history
Education
Skills
Languages
Certification
Timeline
Generic
Muhammad Amir Hamza

Muhammad Amir Hamza

Madina Munawwara,Saudi Arabia

Summary

Motivated professional with strong problem-solving skills and adaptability, seeking to contribute to a forward-thinking organization. Quick learner with a proven ability to embrace challenges and enhance expertise. Committed to delivering value within a dynamic team environment while fostering organizational pride and personal growth.

Overview

8
8
years of professional experience
4
4
years of post-secondary education
1
1
Certification

Work history

Electrical engineer

Green Taiba Construction Company
Madina Munawwara, Saudi Arabia
2023.01 - Current
  • Designed, installed, and maintained electrical systems for commercial, industrial, and residential projects.
  • Prepared electrical drawings, single-line diagrams, load calculations, and technical specifications.
  • Supervised site activities to ensure electrical works were completed according to approved drawings and project schedules.
  • Conducted testing and commissioning of transformers, switchgear, generators, motors, and control panels.
  • Ensured compliance with Saudi standards, safety regulations, and international electrical codes.
  • Coordinated with civil, mechanical, and project teams to achieve smooth project execution.
  • Prepared BOQ, material take-offs, cost estimates, and procurement requests.
  • Managed contractors, technicians, and subcontractors during installation and maintenance activities.
  • Prepared technical reports, inspection records, progress updates, and as-built documentation.

Electrical supervisor

Green Taiba Construction Company
Madina Munawwara, Saudi Arabia
2020.06 - 2022.12
  • Supervised daily activities of electricians, technicians, and subcontractors to ensure timely completion of electrical works.
  • Managed installation, testing, commissioning, and maintenance of electrical systems, panels, lighting, and power distribution equipment.
  • Monitored work progress and ensured compliance with project schedules, specifications, and quality standards.
  • Enforced workplace safety procedures, lockout/tagout practices, and compliance with electrical regulations.
  • Conducted routine inspections, fault diagnosis, and troubleshooting of electrical systems and equipment.
  • Coordinated with engineers, project managers, and other departments for smooth execution of projects.
  • Prepared manpower schedules, assigned tasks, and optimized workforce productivity.
  • Reviewed electrical drawings, single-line diagrams, and technical documents for execution accuracy.
  • Controlled material usage, inventory, and procurement requests for electrical components and tools.
  • Trained and mentored technicians on technical procedures and safety standards.
  • Maintained daily reports, maintenance logs, work permits, and project documentation.
  • Supervised cable laying, termination, panel wiring, motor control circuits, and equipment connections.
  • Ensured successful completion of projects within budget and deadline targets.

Electrical engineer

Matracon Private Limited
Islamabad, Pakistan
2017.11 - 2020.03
  • Worked closely with other engineering disciplines (like civil, electrical, mechanical, and transportation engineers) to integrate electrical systems with other infrastructural elements.
  • Specified the necessary components and equipment for electrical installations, such as transformers, generators, wiring, lighting, and control systems.
  • Supervised the installation of electrical systems to ensure that the work adheres to the designs and specifications.
  • Testing and commissioning of electrical systems and ensuring that all systems are operational, safe and meet the required performance standards.
  • Troubleshooting and solving electrical issues that arise during and after the construction phase.
  • Electrical panel erection, commissioning and supervision of Electrical cable laying & termination.
  • Excavation for 1000 Concrete Foundations for Erection of Electric Poles along with Cable termination and fitting of lights on poles, Design and Calculation of steel structure for concrete Foundations.
  • Worked on Intelligent Transportation System (ITS) on Metro Bus Rapid Transit Project.

Education

Bachelor of Engineering - Electrical Engineering

Air University
Islamabad
2013.11 - 2017.11

Skills

Quality Management

Auditing

Inspection

Reporting

Hiring and training

Project planning and development

Staff Management

Project Management

Technical Support

Training and development

Languages

English
Advanced
Urdu
Advanced
Arabic
Elementary

Certification

Driving licence KSA

Timeline

Electrical engineer

Green Taiba Construction Company
2023.01 - Current

Electrical supervisor

Green Taiba Construction Company
2020.06 - 2022.12

Electrical engineer

Matracon Private Limited
2017.11 - 2020.03

Bachelor of Engineering - Electrical Engineering

Air University
2013.11 - 2017.11
Muhammad Amir Hamza