Summary
Overview
Work History
Education
Skills
Timeline
Generic
Muhammad Naveed Ayub

Muhammad Naveed Ayub

Technical Lead
Riyadh

Summary

Work in an organization having an environment feasible for learning, experimenting, where I can challenge my skills and precisely recognize my managerial, intellectual and technical abilities and enhance them further.

Overview

14
14
years of professional experience
4
4
years of post-secondary education

Work History

Technical Lead/Regional TD Microwave Transmission

Huawei Technologies
Riyadh
09.2018 - 03.2022

· Preparation of DBOQ and material configuration for new planned links under Sophia Project

· License uploading for new Eband 80GHz links on RTN 380AX

· SR raising for Microwave links troubleshooting for technical issues with TAC team

· Handling Cutover, visibility, traffic shifting from Huawei to Huawei and NEC to Huawei for Sophia Project.

· Working on NCE Transmission(Tishan) for Microwave links critical issue and network optimization

· Making LLD and HLD for new Microwave Scope


  • Network Planning and optimization as per requirement of new Eband, SDB and XMC-5D High capacity and expansion links through Path loss 4.0 and iRiver 2.0.
  • KPI calculation for 5G sites delivery on Microwave Links with 10G capacity

· Training Huawei Site Engineers and Subcontractors for HSE for MW installation

· Giving Training to subcontractor staff and Huawei Site Engineers for Huawei Transmission Product installation, commissioning and troubleshooting in Huawei Training Centre

· Providing Transmission Technical training to management for EHS.

· Preparing DTRB for new project scope

· New links Handover, ETM acceptance with Back office

· Managing RSC department resource and activities for smooth project delivery

· Preparation for L5/L6 Process for Project

· Preparation of Different SOPs for project delivery

· Arranging Technical training for new Microwave Product with Site Engineers and subcontractor

Microwave Transmission BO Engineer

Pakistan Telecommunication Company Limited
Islamabad
07.2010 - 02.2012
  • Operational Support to field Staff for integration of new MW links.
  • Hand on Experience of Huawei RTN 900 (910,950) installation, Configuration and Troubleshooting.
  • Hand on Experience of connectivity of RTN 900 with 2G and 3G BTS through FE.
  • Troubleshooting of 1+1 & 1+0 MW links.
  • Experience of troubleshooting of space diversity links to minimize the loss of signal.
  • Microwave link optimization.
  • Experience of Operation & Maintenance of RTN 600 and NEC Pesolink.
  • Experience of IP integration and migration for 2G and 3G.
  • Experience of ELINE and ELAN services configuration for 3G.
  • Knowledge of BTS 3900 for 2G and 3G.
  • Worked on Huawei U2000.
  • Hands on experience of BERT meter like Acterna Advanced Network Tester 20 (ANT 20) and tested circuits of E1s, E3s, DS3, and STM 1 to 64 levels in BERT.
  • Administration of 20 to 30 staff members and 5 engineers.

Assistant Manager

Pakistan Telecommunication Company Limited
Islamabad
07.2009 - 06.2010
  • Database creation in Huawei softswitch C5 (Prefix creation, Route creation etc)
  • Trouble shooting of database issues (routing problem, Dialing issues etc)
  • Subscriber Administration of MSAN UA 5000 and MSAG ZXMSG 5200 using IManager N2000.
  • Operation and maintenance of MSAN UA 5000.
  • Operation and maintenance of MSAG installed at Wah and Jhelum.
  • Working on Siemens EWSD V12 Switch and their Maintenance/trouble shooting.
  • Working on Net Manager software to monitor alarms of EWSD switch

Wireless/Transmission Engineer

Netkom Technologies
Islamabad
11.2007 - 07.2009
  • On Experience of Huawei RTN 600 (610 and 620) installation & Configuration with complete link included IF cable and antenna
  • Hand on Experience of NEC installation & Configuration with complete link
  • Hand on experience of NEC swap with Huawei RTN 600
  • Conduct the Pre-PAT & PAT using BERT tester for checking Bit Error Rate
  • Worked on Nokia BTS Flexi for 3G
  • Perform the Media clearance end to end of BTS Sites
  • Experience of Huawei BTS 3012, 3012 AE (Outdoor) installation & Commissioning with complete installation of sites included RF antennas and Feeder Cable
  • Experience of Huawei BTS 3900, 3900 AE (Outdoor) installation & Commissioning with complete installation of sites included RF antennas and Feeder Cable
  • Trouble shooting of complete site BTS & MW links
  • Expert in PNMT & WebLCT 2000 and LMT
  • Worked on Ufone, Warid and Mobilink Projects

Microwave Integration Team Lead Engineer

Huawei Technologies
Riyadh
09.2014 - 08.2018
  • Worked on iManager U2000 and NCE Transmission for visibility of new RTN Nodes and Configuration of 2G,3G, LTE and 5G Services
  • Configuration of Cross Connection, Ethernet services, and DCN definition for visibility in RTN
  • Configure the ELAN, ELINE, QOS, PLA and LAG services on the MW for 2G/3G/LTE/Wimax integration
  • Expert on working all type of services, configuration and troubleshooting on Huawei RTN600 series, RTN900series and RTN300 series
  • Working on Eband 80GHz links, SDB Link and 8+0 with XMC-5D(High capacity) links to deliver 10G bandwidth for 5G sites
  • Performing MDTs for Cutover, Capacity upgrade and other Rollout activities
  • Configuration of Ring Links with NE40 with high Capacity Packet Traffic
  • Configuration of MPLS Rings, MPLS Tunneling and services for 2G, 3G and LTE on MPLS tunnels
  • RTN Configuration on L2 for local sites and L3 for Road Protection
  • Experience of Data Collection and Software upgrade of RTN 950 and RTN 980
  • Re-routing of 2G, 3G and 4G traffic on RTN
  • Practice of resolving the MW link Capacity issues especially for IP traffic
  • 1st&2nd Level support for trouble shooting different issues and alarms related to MW Transmission using NMS U2000
  • Troubleshooting for issues related to capacity issue, network optimization, KPI degradation issue, IuB drop and KPI improvement
  • Worked on ZTE Swap to Huawei

Wireless and Transmission Field Regional Team Lead

Delta Turkish Telecom
Abha Jizan
03.2012 - 02.2014
  • Worked on RTN 610, 620, 910, 950 and 980 for 2G, 3G and 4G sites
  • Configuration of RTN 600 and RTN 900 for optimization and installation
  • Configuration of Cross Connection, Ethernet services, and DCN definition for visibility in RTN
  • Experience of configuration of E-LAN and E-LINE Ethernet services for Node B and eNode B through RTN
  • Experience of Data Collection and Software upgrade of RTN 950 and RTN 980 using Tool Kit Software
  • Rerouting of 2G, 3G and 4G traffic on RTN
  • Practice of resolving the MW link Capacity issues especially for IP traffic
  • Practice of resolving 3G degradation issues
  • Worked on NEC Pasolink V4 and NEC Pasolink NEO
  • Troubleshooting the E1 alarms, services alarms, IDU alarms and cross connection alarms of RTN
  • Performing MDT for trouble shouting of RTN Issues and software upgrade
  • Practice of making interference test for frequency scanning through Navigator 5.6, Navigator 6.2 beta and Scan Frequency tool
  • Practice of making Ping Test to find the packet loss in Node B and possible solutions to remove.
  • Experience of installation and configuration of 1+0, 1+1, 1+SD, 2 +0 and XPIC links
  • Conduct the PAT of Node B & RTN complete sites
  • Experience of Cutover for shifting traffic of 2G and 3G for RTN
  • Support for troubleshooting 2G, 3G, LTE and MW in south region
  • Worked on 2G BTS 3012 and 3900 Huawei
  • Worked on 3G Node B 3900, DBS 3900 and 3812Huawei
  • Worked on WIMAX and LTE BBU 3900 Huawei
  • Integration of new 3G and LTE sites
  • Troubleshooting of 2G and 3G outages with the BO
  • Troubleshooting with LTE BO for LTE Site outages
  • Conducting the Huawei LTE, 2G and 3G PAT for new and expansion sites
  • Experience of troubleshooting the alarms of BTS and Node B
  • Working on BSC 6900, RNC and NE 40
  • Integration of new 2G and 3G site on BSC 6900 and RNC 6900 respectively through CME

Transmission Back Office Engineer

01.2010 - 02.2012
  • Operational Support to field Staff for integration of new MW links
  • Hand on Experience of Huawei RTN 900 (910,950) installation, Configuration and Troubleshooting
  • Hand on Experience of connectivity of RTN 900 with 2G and 3G BTS through FE
  • Troubleshooting of 1+1 & 1+0 MW links
  • Experience of troubleshooting of space diversity links to minimize the loss of signal
  • Microwave link optimization
  • Experience of Operation & Maintenance of RTN 600 and NEC Pesolink
  • Experience of IP integration and migration for 2G and 3G
  • Experience of ELINE and ELAN services configuration for 3G
  • Knowledge of BTS 3900 for 2G and 3G
  • Worked on Huawei U2000
  • Hands on experience of BERT meter like Acterna Advanced Network Tester 20 (ANT 20) and tested circuits of E1s, E3s, DS3, and STM 1 to 64 levels in BERT
  • Administration of 20 to 30 staff members and 5 engineers.

Education

Bachelor of Computer Engineering - Computer System Engineering, Communication

University of Engineering And Technology
Peshawar
04.2003 - 04.2007

Skills

Technical Skillsundefined

Timeline

Technical Lead/Regional TD Microwave Transmission

Huawei Technologies
09.2018 - 03.2022

Microwave Integration Team Lead Engineer

Huawei Technologies
09.2014 - 08.2018

Wireless and Transmission Field Regional Team Lead

Delta Turkish Telecom
03.2012 - 02.2014

Microwave Transmission BO Engineer

Pakistan Telecommunication Company Limited
07.2010 - 02.2012

Transmission Back Office Engineer

01.2010 - 02.2012

Assistant Manager

Pakistan Telecommunication Company Limited
07.2009 - 06.2010

Wireless/Transmission Engineer

Netkom Technologies
11.2007 - 07.2009

Bachelor of Computer Engineering - Computer System Engineering, Communication

University of Engineering And Technology
04.2003 - 04.2007
Muhammad Naveed AyubTechnical Lead