A growth oriented and challenging career in an organization of very good repute, ethics and excellent work environment where I can exploit my technical skills and abilities to the fullest and optimize my personal and professional growth.
Overview
3
3
years of professional experience
Work history
Project Engineer (Site in Charge)
Tarek Nasser Al Akeel Co
Saudi Arabia
06.2017
All Millwright activities involving erection and commissioning Rotating equipment’s
Over hauling of various equipment of steel plant hot strip mill like Roughing mill, Descaler, finishing mill, Coiler, CVC blocks spindle etc
Girth gear erection and drive erection and axial and radial alignment
Complete alignment (shell, Line, Drive, Tyre, supporting roller) of rotary drums, Mills, Bucket elevator
White metal bearing scrapping & blue matching
Rider ring (supporting tyre) alignment and shimming of chair pad
Antifriction bearing installation and skew correction
Erection& Commissioning of Rotating equipment’s like Impeller Fans, Pumps
Erection, Commissioning &Maintenance of Rotary drums, Grate cooler, Raw Mills and Cement Mills, Different types of Crusher, Airsides, Bag filters, Electrostatic precipitators (EP)
Fabrication & Erection of various structural jobs
(Ducting, Water pipe lines, Air lines etc.) Preventive maintenance & attending breakdown jobs
Various assembly & Hydraulic jobs of machinery like Mills and roller press, etc
Inspection & preventive maintenance of high-speed belt conveyors
Prepare Project schedule with requirement of client and availability of resources
Arrange the required tools, manpower and resources by coordinate with planning department
Arrange the complete technical and non-technical pre project activities
Arrange required gate passes and work permits
Plan & execute the site activities within the recourses and time frames Inspecting construction sites regularly to identify and eliminate potential safety hazards
Supervising and instructing the construction team as well as subcontractors
Enforcing site safety rules to minimize work-related accidents and injuries
Handling site accidents in accordance with established accident protocol
Maintaining an accurate record of construction employee attendance
Evaluating the performance of construction employees and instituting disciplinary measures as needed
Analyzing blueprints to ensure that construction projects meet design, safety, and budget specifications
Recommending changes to construction operations or procedures to increase efficiency
Coordinate various department of client and execute the job as per their requirement
Attend daily meeting with client
Check all drawings and ensured that all designs were followed and all corrective measures were taken in case of discrepancies
Ensure the works are performed in accordance with the specifications reviewing progress and liaising with quantity surveyors to monitor costs Rectify the client’s complaints
Commissioning of handover the project to client.
Assistant piping engineer
BPCL Kochi Refineries Ltd(IREP)
05.2015 - 08.2016
Issuance of all related drawing for construction like Isometric drawing, Support drawing, steam tracing isometric & others
Prepare daily, weekly schedule and to prepare manpower distribution
Coordinate with various departments and gathered information on all materials
Check, monitoring the spool fabrication and erection at site
Ensured that all production materials were available and communicated to procurement department when needed
Check all drawings and ensured that all designs were followed and all corrective measures were taken in case of discrepancies
Ensure the works are performed in accordance with the specifications Updating and revision of the drawings according to amendments and modifications carried out in field and arising Queries to Clients if any deviations
Rectify the client’s complaints.
Mechanical supervisor
RELIANCE INDUSTIRES PVT LTD(J3 Expansion Project)
03.2014 - 01.2015
Coordinate with construction activities
Execution pipe line as per the drawing
Quality control, material handling and planning
Schedule and prepare manpower distribution
Checking the correct installation of steam tracing tube
The steam tracing system shall be inspected visually only before installation of insulation
Underground piping Erection
AG piping erection, welding and vessel erection
CS, SS and AS piping Execution.
Project Coordinator
Hajee AP Bava Construction Pvt Ltd (HAPCO)
05.2013 - 11.2013
Visual Inspection Billing
Project Coordinating Daily progress reporting
Responsible for coordinating Both the Department Overseeing the maintenance of projects after completion
Billing Procedures.
Skills
Touch Typing: Excellent
OS Environment: Windows XP/Vista/7/8
Software: MS office, AutoCAD, Solid edge, Catia V6
Accomplishments
Bachelor of Engineering in Mechanical Engineering from Excel college of Engineering& Tech. INDIA (2013), affiliated to Anna university and secured an aggregate of 7.4 CGPA
XII from GFHSS Nattika (State Board) and secured an aggregate of 64%.
Languages
English
Fluent
Tamil
Advanced
Malayalam
Fluent
Hindi
Fluent
Personal Information
Passport Number: N6828578
Date of birth: 05/03/91
Nationality: Indian
Marital status: Married
Visa status: Permanent
Custom
I consider myself familiar with engineering aspects. I am also confident of my ability to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge.