An Experienced and Well-Educated Senior Electrical & instrumentation project engineer with around 8 years of experience working with a large multinational contracting company. I have operated as part of the project Construction Family at consolidated contractor company (CCC) in the Kingdom of Saudi Arabia. The position has afforded me the opportunity to get actively involved in multi-million-dollar, large scale projects providing me with an extensive knowledge and experience in the project management and construction fields. At present I am seeking a suitable position in construction Execution where my skills and experience in projects, construction execution.
Company Name: BACS Riyadh Metro Project (RMP). Bechtel, Almabani and CCC in Consortium with the Transit System Contractor, Siemens (BACS)
o two lines of the six-line metro system that will run for a total length of 176kilometers across the city and includes 85 stations.
· Location:Riyadh Metro Project – Riyadh, Saudi Arabia.
· Project Value: $22.5 Billion.
· Web Site: http://www.bacsrmp.com/
· Responsibilities are:
· Coordinating with other trades and procurement to Prepare takeoff for Electrical systems thru (FMR) using Aconex system (BBS).
· Preparing (MWR) for tools and materials using Aconex system (BBS) then follow up the shifting of material from warehouse to site.
· Installation of conduits (PVC, IMC & EMT) with junction boxes as per drawing.
· Installation of Cable Ladders, Cable Trays and Cable Trucking Data for low voltage (LV) and medium voltage (MV) as per drawing.
· Re-design the Electrical wiring system including voltage Drop Study.
· Material Inspection with Consultant (MIR).
· Collect the required approved materials in advance to avoid any lack or shortage of materials.
· Installation termination all electrical activity & equipment’s such as package substation, transformer, switchgear, UPS, RMU, electrical Panels, According to approved shop drawings.
· Prepare MST, JHA, ITP And CWP For the systems,
· Creating MSD and make selection For the System’s based on approved Vendors by BACS And RMTC.
· Making FCD, RFI for the system based on site or SPECS Requirement.
· Testing and commissioning for power & low current system before handover.
· Handing over the executed work officially to the consultant.
· Coordination with civil team, scaffolding team, and Siemens group on the site.
· Raise WIR and MIR then download in ACONEX to complete the work with RMTC.
· Prepare IRN’s And Handover To T/C Team.
· Develops discipline construction schedules, and monitor’s progress.
· Chairs weekly job meeting: prepare and submit summary of project progress and pending issues to program manager.
· Collaborate with program manager to determine number of hours required for successful completion of project tasks.
· Managing MEP works through all phases of project lifecycle.
· Lead coordination with MEP stakeholders.
· Prepare claim packages for variation orders & verify subcontractors’
· Liaised with designers (ARUP & Zaha Hadid Architects) for
· Through working knowledge in application of codes and standards, verification of design, validation, and testing of MEP systems.
· Participate in Post Termination contractual Meetings with Contractors to facilitate orderly transition of the Works.
· Carry out on-site Audits to verify work accomplishments &
· Strong knowledge of Building Systems – LV Distribution, Lighting
· Coordination with suppliers on the MEP Material Procurement and long lead item selections.
· Coordination with different Sub-contractors (Fire Alarm, BMS, FM200 and Photovoltaic Systems).
o Project Name: King Khalid International Airport-Consolidated Contractors Company ''CCC'' Terminal 1 Rehabilitation Project Pre-G20
o Client: Riyadh Airports.
o Location: Saudi Arabia.
o Job Title: Electrical Engineer.
o Time Duration: from July 2020– Feb-2021.
· Jizan Refinery Project Consolidated Contractors Company.
· Project Name: Jizan Refinery Project (Aramco Projects) , (JRUP, JRTF, SARU).
· Responsibilities are:
· Responsible for assuring that all systems and components of the refinery are designed, installed, tested, operated, and maintained according to the operational requirements of the Aramco standards, Leading Commissioning activities with contractor and Client.
· Loop Test (Distributed control system).
· PMCC Pre-commissioning and Mechanical Completion Certificate),
· Coordinate site activities and estimate man hours.
· Lighting & Small Power Works.
· Prepare material requisition and installation.
· Prepare shop drawing and material take-off.
· Loop folders preparation.
· Making as build mark-up drawing and submitting to clients.
· Preparing Site reports.
· Materials take off(MTO) & quantity surveying.
· Planning the work ahead and efficiently organizing the site facilities in order to meet agreed deadlines.
· Supervise the execution of the work, and ensure that all activities are being carried out as per specification, method statement, and Aramco standards.
· Closely coordinate with the construction manager regarding the unit of works..
· Prepare Isometric Drawing
· Planning and scheduling the instrumentation pre-commissioning checking and commissioning activity.
· Project Name: Automatic Water Meter Reading (AMR) Dept.
· Web Site: https:www.mewa.gov.sa
· Responsibilities are:
· Managing the water meters’ replacement.
· Designing the power supply circuit for the gateways.
· Calculating the coordinates where to install the gateways.
· Calculating the coordinates where to install the gateways.
· Testing the signal strength between the repeaters and the meters.
· Configure the gateways to the billing systems in the ministry of water.
· Configuring the meters in order to get the daily consumption for each water meter to calculate the amount of water lost during the day.
· Activating the alarms in the meters.
· B.Sc., Mechatronics Engineering. Hashemite University. Zarqa, Jordan, 2015.
· Graduation Project: Solar Tracking and Energy Saving System.