Summary
Overview
Work History
Education
Skills
Affiliations
Languages
Work Availability
Timeline
Generic
Mustafa Shaar

Mustafa Shaar

Riyadh,Saudi Arabia

Summary

Dependable Adaptable Senior Engineer with experience managing high-value construction projects. Leads by example to uphold quality and productivity standards. Briefs staff and contractors on key project requirements and motivates teams to achieve them.

Overview

16
16
years of professional experience

Work History

Site Manager- Underground Stations and Tunnel

Riyadh Metro Project, FAST Consortium, Package3, Riyadh, KSA
Riyadh , Saudi Arabia
2021.01 - Current
  • Coordinate execution of construction works
  • Organize site's workload and resources to optimize output and productivity.
  • Manage Multidisciplinary team to successfully execute projects valued up.
  • Devise realistic schedules and programs for construction activities.
  • Strategically deploy construction staff to maximize productivity.
  • Filed and maintained all subcontractor documentation for future reference.
  • Negotiate with Key stockholder and local authorities to deliver objectives constraints.
  • Provide mentorship, support, and team management to keep staff suitably trained and competent.
  • Identify and implement safety, productivity, and efficiency improvement initiatives.
  • Generate detailed reports covering analysis of production issues and outlining potential solutions.
  • Manage site instructions, daily diary, record sheets and other forms of site reporting.
  • Ensure that all projects are delivered on-time, within scope and within budget.
  • Report and escalate to management as needed.
  • Ensure resource availability and allocation.
  • Established work schedules and assignments for employees, maintaining area staffing levels at all times.
  • Conducted regular site inspections to comply with safety guidelines.
  • Maintained clean environment by removing hazardous materials.
  • Collaborated with designers and subcontractors to fulfil project goals.
  • Held Measure performance using appropriate project management tools and techniques.

Senior Engineer -Underground Stations and Tunnel

Riyadh Metro Project, FAST Consortium, Package3, Riyadh, KSA
Riyadh , Saudi Arabia
2014.04 - 2021.01
  • Coordination with client representative for traffic diversions, road work and utilities diversions
  • Utilities investigation and execution of utilities diversion
  • Earth work, deep excavation, shoring of excavation perimeter
  • Execution of structural work for the deep underground station
  • Review drawings, and quantities
  • Prepare Frequency status reports to facilitate accurate tracking of project progress against set goals
  • Performed root cause analysis to identify Type issues with Number % accuracy
  • Improve supplier performance to achieve zero defects, by providing engineering & technical guidance and procedures
  • Liaising with consultants, subcontractors, supervisors, planners, quantity surveyors
  • Day-to-day management of the site, including supervising
  • Monitoring the site manpower and the work of subcontractors
  • Oversee quality control inspections to verify product conformance with applicable codes, standards, and approved specifications.

Structural Engineer

AL-FOZAN TRADING & GENERAL CONSTRUCTION.CO -AL-
2010.01 - 2014.04
  • Prepare detailed design documents and calculations and re-design according to ACI Code and using Engineering software ( ETabs, SAP 2000 & SAFE)
  • Work with architects and engineers to address design codes to provide safety measures
  • Prepare preparatory project plans for site works through AutoCAD
  • Prepare BOQ quantity with approved shop drawing.

Site Engineer

AL-FOZAN TRADING & GENERAL CONSTRUCTION.CO -AL
2010.01 - 2012.10
  • Documented daily progress, incidents, and issue resolutions for accurate site records
  • Oversee selection and requisition of materials
  • Check and review the design development drawings and specifications from the consultants before start of the project
  • Supervise a team of Sub-ordinates (Supervisors and Technicians)
  • Follow up the progress of work from structural up to finishing works
  • Coordinate with my managers and subcontractors to finish the job on time as per schedule
  • Follow up the progress of work from structural up to finishing works
  • Manage the manpower resource and distribute them as per the site plan to meet the objectives of the management instruction.

Site supervisor

UNION ENGINEERS CONSULTING OFFICE
2007.12 - 2009.10
  • Flowing up rebar and formwork installation
  • Casting concrete and finishing work.

Education

Bachelor Degree of Civil Engineering - Civil Engineering

Aleppo University
Aleppo, Syria

Skills

  • Construction management
  • Subcontractor management
  • Railway Project Engineer
  • Quality management
  • Leadership
  • Supervisor Skills
  • Cross-Functional Coordination
  • AutoCAD
  • Building site supervision
  • Site management

Affiliations

  • PMI, 9735792
  • Saudi Council of Engineers
  • Syrian council of Egineers

Languages

Arabic
English

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Site Manager- Underground Stations and Tunnel

Riyadh Metro Project, FAST Consortium, Package3, Riyadh, KSA
2021.01 - Current

Senior Engineer -Underground Stations and Tunnel

Riyadh Metro Project, FAST Consortium, Package3, Riyadh, KSA
2014.04 - 2021.01

Structural Engineer

AL-FOZAN TRADING & GENERAL CONSTRUCTION.CO -AL-
2010.01 - 2014.04

Site Engineer

AL-FOZAN TRADING & GENERAL CONSTRUCTION.CO -AL
2010.01 - 2012.10

Site supervisor

UNION ENGINEERS CONSULTING OFFICE
2007.12 - 2009.10

Bachelor Degree of Civil Engineering - Civil Engineering

Aleppo University
Mustafa Shaar