

Professional Civil Engineer with four years of GCC experience delivering complex infrastructure and building projects. Skilled in site management, multidisciplinary coordination, and civil operations valued over SAR 600 million within project totals exceeding SAR 6 billion. Known for leadership, proactive problem‑solving, and strong alignment with HSE and quality standards. Fluent in English and Arabic, approved to work with major clients including SEVEN, NEOM, Royal Commission, and Air Products.
Project: SEVEN Ta'awon Al‑Khobar | Client: Saudi Entertainment Ventures (SEVEN)
PMC: WSP | LDC: Atkins | Role: Site Civil Engineer / Section Head
Officially appointed Site Civil Engineer and delegated by Project/Construction Managers to act as Section Head for nearly 50% of the project area, leading six sub‑contractors and delivering major civil works worth SAR 600 million (≈ USD 160 M) within a SAR 6 billion megaproject.
Key Achievements
Responsibilities
Project: NEOM Sports Village (NSV)
Client: NEOM Sports
Project Management Consultant (PMC): AECOM
Role: Project Engineer
Led all site mobilization activities and managed full civil execution works including trenching, underground utilities, and landscaping operations. Oversaw excavation, lifting, relocation, and finishing for cabins; coordinated MEP works, interlock paving, and steel structure assembly. Ensured work quality, safety, and schedule compliance in accordance with client requirements. Reported directly to the Project Manager (PM) and acted as the on-site point of coordination for multiple disciplines and subcontractors.
Key Achievements:
Project: Plot 16‑B
Owner: Royal Commission (RC)
Engineering Project Manager (EPM): Bechtel
Main Contractor: FMSCO
Role: Site Civil Engineer
Oversaw on-site civil engineering operations with a strong focus on quality control, safety, and coordination. Directed multiple site teams to achieve construction milestones efficiently, ensuring resource optimization and full compliance with client standards.
Key Achievements:
NEOM (Project WO#64)
Owner: NEOM
Engineering Project Manager (EPM): Bechtel
Main Contractor: FMSCO
Role: Site Engineer / Acting CM
Oversaw and managed all site civil activities including excavation, precast foundation installation, and acoustic barrier construction. Directed multidisciplinary teams and coordinated with supporting departments to ensure full alignment with project specifications, schedule, and HSE standards. Reported directly to the Project Manager, serving as the primary interface for field operations and progress monitoring.
Key Achievements:
NEOM (Project WO#62)
Owner: NEOM
Project Management Consultant (PMC): Parsons
Main Contractor: FMSCO
Role: Site Engineer
Managed and directed all site civil activities including crushing, hauling, backfilling, and dynamic compaction, ensuring strict compliance with HSE regulations, project specifications, and sustainability standards. Coordinated directly with the PMC to resolve technical issues, optimize execution plans, and maintain high production efficiency across large-scale operations.
Key Achievements:
Project: Air Products Qudra (APQ) Project
Client: Air Products Qudra (APQ)
Consultant: AP
Main Contractor: Larsen & Toubro (L&T)
Subcontractor: Durrat Al‑Ta’meer Group (DTG)
Role: Site Engineer
Supervised and managed shoring and dewatering works executed by DTG under L&T’s main contract. Verified technical designs and construction drawings to ensure compliance with specifications and standards. Directed on-site teams to achieve safe, efficient, and high-quality project delivery while maintaining strong coordination with all stakeholders.
Key Achievements:
- Earned Certificate of Appreciation from WSP for safety and HSE leadership in SEVEN Project.