3D modeling and Coordination


KSA - Riyadh - Al-Bawani contracting co, Head office Office
Yanbu Seven Project (New: Oct 2022).
As a Lead structural Eng. participate in Managing, Supervising, coordinating with other disciplines, representing all meetings with all stakeholders and share in the following achievements:
KSA - Riyadh - Archen Engineering consultant co, Head Office team.
Al-Riyadh Government Project (SBI), Saudi Arabia (Mega Projects):
Structural BIM Modeling for the whole project:
El Giza 6 October Hay El Montazah
Egypt - Bunyan Contracting co - El Giza 6 October Hay El Montazah
Supervising & leading for site team members (organizing, training, advising).
Completed the construction of the following:
•200 % incremental Completion rate.
•32 buildings 7 floors - 1500m2.
•12 townhouse 2 floors - 500m2.
•Mosque.
•10 Km of Road.
•Two Gates.
•Kindergarten.
I did, by myself a special training courses to rise up the site team members' qualifications (like: Total station, Time table, Revit, Primavera).
I believe in a policy that rewards the diligent and takes the hand of the loser to succeed.
Conducted Quantity Surveying by using REVIT (BUA=200,000 m2) for concrete items for:
BIM Management & Coordination
Structural engineering
Leading production crews
Structural Drafting
Product engineering
Problem-Solving
Handling conflict
Revit Architecture
Revit Structure (Certified ACP)
Tekla
ArchiCAD
Rhino
Grasshopper
Dynamo
Synchro
Solibri (QTO Autodesk)
AutoCAD
Microsoft: Windows - Office
SAP2000
Safe
Etabs
Robot
3Ds Max
SCIA
Bimcollab
Bimsync
Trello
Slack
Plannerly
Autodesk Structural professional certificate (ACP Revit)
3D modeling and Coordination
Autodesk Structural professional certificate (ACP Revit)